1 Module 22 Standard Costs and Variance Analysis.

Slides:



Advertisements
Similar presentations
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Standard Costs: Direct Labor and Materials Chapter Twelve.
Advertisements

Chapter 11 Standard Costs and Variance Analysis
CHAPTER 10 The Need for Standards Standards Are common in business They are often imposed by government agencies (and called regulations) Standard costs.
Standard costs and Variance analysis Unit 10 University of Sunderland Dr Vidya Kumar 1.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Principles of Managerial Accounting Chapter 10. Standard Costs Set to encourage efficient operations – management by exception. Quantity Standards A benchmark.
Standard Costing and Variances
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
MSE608C – Engineering and Financial Cost Analysis Budgeting and Variance Analysis.
Standard Costs Pertemuan 7. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for planning.
Standard Costs and Variance Analysis
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Standard Costs and Variance Analysis Chapter Ten & Eleven.
Prepared by Debby Bloom-Hill CMA, CFM. Slide 11-2 CHAPTER 11 Standard Costs and Variance Analysis Standard Costs and Variance Analysis.
Managerial Accounting by James Jiambalvo Chapter 9: Standard Costs and Variance Analysis Slides Prepared by: Scott Peterson Northern State University.
Lecture 6 Cost Variances for Direct Costs. The derivation of the price and efficiency variances AP ACTUAL COST AQ AP = actual price per unit of input.
Chapter 12 – Standard Costs: Direct Labor and Materials
Financial and Managerial Accounting
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Flexible Budgets and Variance Analysis
Chapter 23 Flexible Budgets and Standard Cost Systems
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
CHAPTER © jsnyderdesign / iStockphoto 6 PERFORMANCE EVALUATION VARIANCE ANALYSIS.
Chapter 25-1 Chapter 25 Standard Costs and Balanced Scorecard Accounting Principles, Ninth Edition.
Deluxe Linens Deluxe Linens makes high-end sheets which they sell to major retail stores and on their website. The budgeted costs for materials and direct.
IES 342 Industrial Cost Analysis & Control | Dr. Karndee Prichanont, SIIT 1 The Flexible Budget and Standard Costing Chapter 13 Objectives: Develop and.
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
Variance Analysis Topic Six by Dr. Ong Tze San
1 Chapter Eleven Standard Costs and Variance Analysis.
THE BUDGET PLAN FOR 4 TH QUARTER Sell in 4 th quarter: 70,000 pants 25,000 jerseys 9,000 award jackets Control inventory Manage cash.
Performance Evaluation
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Chapter 9 Standard Costing: A Functional-Based Control Approach
Standard Costing and Analysis of Direct Costs CHAPTER 10 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
1 Budgeting as a control mechanism 1. Budgeted levels are the standards to follow in operation 2. Variance evaluation for performance measurement A variance.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Standard Costs: Direct Labor and Materials
Standard Costing and Analysis of Direct Costs Chapter 10 McGraw-Hill/Irwin Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
9-1 Standard Costs Standards are benchmarks or “norms” for measuring performance. In managerial accounting, two types of standards are commonly used.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Standard Costing and Variance Analysis
Part 1 Study Unit 7 Review Jim Clemons, CMA.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Chapter 23 Flexible Budgets and Standard Cost Systems.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
25-1 Both standards and budgets are predetermined costs, and both contribute to management planning and control. There is a difference:  A standard is.
MANUFACTURING FIRMS USE STANDARD COSTS AND STANDARD QUANTITIES TO BUDGET FOR AND ANALYZE PRODUCTION Standard Cost Variance Analysis.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Prepared by Debby Bloom-Hill CMA, CFM
Performance Evaluation
Pertemuan 7 Standard Costs.
Foundations and Evolutions
© 2017 by McGraw-Hill Education
A Monthly Budget Variance Report
AMIS 212 Introductory Managerial Accounting
Variance Analysis–A Tool for Cost Control and Performance Evaluation
© 2017 by McGraw-Hill Education
Presentation transcript:

1 Module 22 Standard Costs and Variance Analysis

2 Standard Costing Definition: Standard costs are benchmarks for the cost of a product, process, or subcomponent. Used for Planning and Decision Making: Standards can be better predictors of future costs than actual past costs. Can be used in product pricing, bidding, and outsourcing decisions. Used for Controlling Operations: Set performance expectations. Variances from standards get attention of managers. Management by exception - investigate variances. Ideal versus Practical Standards: Ideal - attained at near perfect conditions. Practical - set at near normal, efficient operations (better motivator).

3 Variances and Flexible Budget Variances measure the difference between actual and standard costs: Favorable (F) variance, if actual < standard. Unfavorable (U) variance, if actual > standard. Note: variances may also be calculated for sales, but the interpretation is reversed. For best interpretation, we need to calculate the flexible budget for each activity. Flexible budget is defined as: Actual Activity * Standard Price FB is necessary to decompose variances into price and quantity components, and allows managers to investigate the components.

4 Format for Variance Analysis Symbols: AQ = Actual quantity used; SQ = Standard quantity allowed; SP = Standard price per unit; AP = Actual price per unit. Total Flexible budget Total actual based on standard cost actual input cost AQ AQ SQ x AP x SP x SP |______________________| |___________________| AQ  (AP - SP) (AQ - SQ)  SP Price variance Quantity variance |____________________________________________| (AQ  AP)  (SQ  SP) Total variance

5 Direct Labor Variance Symbols:AQ = Actual quantity of hours used; SQ = Standard quantity of hours allowed; SP = Standard wage rate per hour; AP = Actual wage rate. Total Flexible budget Total actual based on standard cost actual input cost AQ AQ SQ  AP  SP  SP |_____________________| |___________________| AQ  (AP - SP) (AQ - SQ)  SP Rate variance Efficiency variance |_____________________________________________| (AQ  AP)  (SQ  SP) Total flexible budget labor variance

6 Interpreting Direct Labor Variances Large variances in either direction indicate performance is not as planned, due to either poor planning, poor management, or random fluctuation. Unfavorable rate variance: Could indicate overtime had to be paid, depending on how overtime is accounted for. Workers were not available at lower rates. Unfavorable wage rate variance with favorable efficiency variance: Higher-paid workers performed work more efficiently. Favorable wage variance with unfavorable efficiency variance: Lower-paid workers performed work less efficiently.

7 Direct Materials Variance (assumes quantity purchased equals quantity used) Symbols:AQ = Actual quantity of materials used; SQ = Standard quantity of materials allowed; SP = Standard price per unit; AP = Actual price per unit. Total Flexible budget Total actual based on standard cost actual input cost AQ AQ SQ  AP  SP  SP |_____________________| |___________________| AQ  (AP - SP) (AQ - SQ)  SP Price variance Quantity variance |_____________________________________________| (AQ  AP)  (SQ  SP) Total flexible budget material variance

8 Interpreting Direct Materials Variances Price variance - usually as a result of purchasing department, but other factors may intervene Quantity variances - usually as a result of production, but other factors may intervene. Unfavorable price variance with favorable quantity variance: Higher priced materials may have less flaws, increase production efficiency and and decrease the use of materials quantity. Favorable price variance with unfavorable quantity variance: Lower priced materials may cause increased use of materials and production problems; may also affect labor efficiency.

9 Variable Manufacturing Overhead Variance Total Flexible budget Total actual based onstandard VMOH actual use cost costs AQ AQ SQ x AP x SPx SP |____________________| |___________________| (AP – SP) AQ (AQ - SQ)  SP Spending varianceEfficiency variance |___________________________________________| (AQ x AP)  (SQ  SP) Total Variable MOH variance