4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.

Slides:



Advertisements
Similar presentations
0 The Legislative Energy Package Panel on the 3 rd Electricity Market Package 13 February 2008 Maria Paatero-Kaarnakari Senior Vice President Corporate.
Advertisements

Pécs Midterm review of the achievements of the Hungarian Presidency of the Council of the European Union András Rozmer Department of Strategy.
Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
1 st GRG meeting, Zagreb, 30 September 2005 Gas Regulatory Group Main issues to be addressed.
Zagreb, 28 September 2004 The South East Europe gas market: a preliminary analysis of facts and opportunities from the Regulators perspective GAS TASK.
1 African ICT Roadmap to Achieve NEPAD Objectives Arusha, Tanzania, 1-3 April 2003 Roles of Government and ATU in the Implementation of NEPAD ICT objectives.
EURELECTRIC vision on market development – what can the industry provide to accelerate market development? Peter ŠTULC Chairman of EURELECTRIC TF flow-based.
Completing the EU internal energy market IFIEC, 22 November 2011
Workshop on “Requirements of financial institutions on the financing of gas infrastructure projects, Brussels, Regulatory requirements for new.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
CONCLUSIONS AND RECOMMENDATIONS Benjamin Schlesinger, Ph.D. Benjamin Schlesinger and Associates, Inc. (BSA) Black Sea Energy Conference Bucharest – April.
Completing the EU internal energy market
4th PRS Western Balkans Forum, Athens, June 27 Regional co-operation in the energy sector: Perspectives for the Western Balkans and the European Union.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
3 November 2005 GIE Conference Gas Market Developments in SEE Balázs SÁNDOR Chairman GIE ECSEE Study Group Athens - 3 November 2005.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Recent Regulatory Developments in the gas market of the Energy Community Dr. Michael Thomadakis Vice President, RAE Chairman of the Gas Working Group,
EU Energy Strategy
Bucharest, 3-5 April, 2006 BSEC, Bucharest, 3-5 April, 2006 Towards a pan-European Energy Market: Challenges for the SEE &Black Sea Regions Dr. Michael.
A Common Immigration Policy for Europe Principles, actions and tools June 2008.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
Euei1. 2 Facilitation Workshop and Policy Dialogue Maputo April 2005 Enrico Strampelli European Commission DG Development.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
How TSOs can further contribute to efficient competition GIE ANNUAL CONFERENCE ATHENS 2005.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
GIE Annual Conference, Athens, 3 November 2005 Prospects of a Regional Gas Regulatory Framework Fostering a Sustainable Market-Based Investment Climate.
Bucharest, 24 October 2008 Making the third package work in practice Wolfgang Urbantschitsch, E-Control.
Energy Agency of the Republic of Serbia
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Directorate General for Energy and Transport1 Ana Arana Antelo Head of Unit Electricty & Gas – European Commission/DG TREN GIE Annual Conference, ,
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
Update on electricity market Baltic Mini Forum 1 October, 2010.
3 rd Athens Process Forum /24, Sofia CEER WG SEEER – Regulatory Benchmarking Standards for SEE.
1 This project is co-financed by the European Union STATUS OF RENEWABLE ENERGY IN THE MEDITERRANEAN AND CURRENT CHALLENGES; MedReg Perspective By Prof.
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
The Energy Community Disclaimer: this not an official document of any of the Parties.
CESEC Energy Community Project Monitoring
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
DRAFT Discussion Paper on the Options for the Transition Phase of the ECSEE Regional Energy Market Donors meeting Vienna, 13 July 2004.
POLICY CHALLENGES AND OPPORTUNITIES.  Introduction  Overview of EAC  Challenges in Implementing EAC CU  Opportunities Abound  Lessons from the European.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Energy Community Secretariat Committee on Industry, Research and Energy, European Parliament Energy Community Activities and Outlook for the Future Brussels,
The EU ETS and the Modernisation Fund: European Power sector’s perspective Krzysztof Laskowski Climate Policy Advisor, EURELECTRIC Brussels, 4 May 2016.
Towards sustainable European energy markets Remko Bos Director of the Energy department Authority for Consumers and Markets Vice President Council of European.
EU context (networks & initiatives) and expectations EU context (networks & initiatives) and expectations Michel Viaud and/or Ingrid Weiss EPIA, Brussels,
ENERGY MARKET REFORMS, R&D & INNOVATION, AND CHALLENGES: TURKISH EXPERIENCE Selahattin Murat ŞİRİN Expert Energy Market Regulatory Authority TURKEY.
Towards sustainable European energy markets
The 3rd package for the internal energy market
ERGEG GRI South South East – , Maribor
Ashgabat International Energy Charter Forum
Energy 2020: A Strategy for competitive, sustainable and secure energy
CESEC Energy Community Project Monitoring
GIE Annual Conference Bratislava, September 2006
DRAFT DG TREN Staff Working Paper on LNG
European energy policy
Presentation transcript:

4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries Michael Thomadakis Vice President Greek Regulatory Authority for Energy,

2 Energy Community (former: of SEE) The Energy Community Treaty is put into force since July 2006 The Energy Community Treaty is put into force since July 2006 The aim is the establishment of a regional market in SEE both in electricity and gas The aim is the establishment of a regional market in SEE both in electricity and gas Main tools will be the existing and the anticipated EU legislation mainly on energy and then on environment and competition Main tools will be the existing and the anticipated EU legislation mainly on energy and then on environment and competition A timetable for the implementation of the aquis communnautaire is established for the non-EU Parties A timetable for the implementation of the aquis communnautaire is established for the non-EU Parties The Institutional Framework established by the Treaty (Ministerial Council, PHLG, Regulatory Board, Secretariat and the Fora) provides the mechanisms for the regional political and technical cooperation necessary for the success of the Process The Institutional Framework established by the Treaty (Ministerial Council, PHLG, Regulatory Board, Secretariat and the Fora) provides the mechanisms for the regional political and technical cooperation necessary for the success of the Process

3 SEE: A dynamic energy market SEE countries economies are improving, leading to increased energy consumption and thus increased need for energy infrastructure SEE countries economies are improving, leading to increased energy consumption and thus increased need for energy infrastructure International Financing Institutions and private investors are providing funds for an increasing number of energy infrastructure projects in many countries and are investigating further options International Financing Institutions and private investors are providing funds for an increasing number of energy infrastructure projects in many countries and are investigating further options Energy Traders are becoming increasingly active in many countries Energy Traders are becoming increasingly active in many countries In parallel, most of the countries in the SEE region are EU members or candidate EU members (now or in the near future) In parallel, most of the countries in the SEE region are EU members or candidate EU members (now or in the near future) The momentum is there… The momentum is there…

4 Recent evolutions in EU The 7 EU-regions have been defined (Regulation 1228/03) The 7 EU-regions have been defined (Regulation 1228/03) European Regulators (ERGEG) have launched their Regional Initiatives European Regulators (ERGEG) have launched their Regional Initiatives Impressive coordination of market approaches among the countries of these regions (and between the regions) is already happening (e.g. Northwest Europe) Impressive coordination of market approaches among the countries of these regions (and between the regions) is already happening (e.g. Northwest Europe) Energy Community is in the core of the External Energy Policy of the EU Energy Community is in the core of the External Energy Policy of the EU The European Commission is already considering the establishment of the SEE as the 8 th European Region The European Commission is already considering the establishment of the SEE as the 8 th European Region The 3 rd EU legislative package is expected soon (for the implementation of the new European Energy Policy) The 3 rd EU legislative package is expected soon (for the implementation of the new European Energy Policy)

5 The merging has started… Two very important practical steps: Two very important practical steps: 1. In 2007 a unified ITC mechanism exists throughout Europe including all countries of the Energy Community (ITC: a mechanism where electricity is traded without any other payment for the traders except the tariffs for the use of the networks and the payments for the rights to use the Interconnectors) 2. Coordinated Capacity Allocation in all borders of the SEE countries: is currently under design and virtual implementation; this will provide the opportunity for the trade of electricity throughout the region at a single step, without the need to go from border to border and from company to company and book capacity on an individual basis

6 What SEE countries need to do… Realize the changing environment and face the challenges ahead Realize the changing environment and face the challenges ahead Believe that all of them are future EU-members Believe that all of them are future EU-members Act as if they were already EU members Act as if they were already EU members Learn from the experience (and the mistakes) of EU members; Learn from the experience (and the mistakes) of EU members; Realize that energy market liberalization is a non-reversible process (especially when linked to privatization) Realize that energy market liberalization is a non-reversible process (especially when linked to privatization) Exploit the existence of investment opportunities (and funds) Exploit the existence of investment opportunities (and funds) Enhance Regional collaboration Enhance Regional collaboration Eventually, be an integral part of the EU IEM Eventually, be an integral part of the EU IEM These need to be addressed with determination by the Governments, the Industry, the decision makers and –eventually- by the consumers

7 Act as if they were already EU members … …the main and immediate action that is necessary is the full and complete and effective implementation of the second…Electricity Directive…in spirit and not only in letter…. (For Gas, things are different in the SEE) …the main and immediate action that is necessary is the full and complete and effective implementation of the second…Electricity Directive…in spirit and not only in letter…. (For Gas, things are different in the SEE) Unbundling (twofold value in SEE): Unbundling (twofold value in SEE): Proper implementation of TPA, proper allocation of costs Proper implementation of TPA, proper allocation of costs Establishment of more attractive entities for the privatization process Establishment of more attractive entities for the privatization process Effective Regulation: work in practice, enhance the competencies of national Regulatory authorities and support the ECRB; a lot of work is required in this field by the SEE countries Effective Regulation: work in practice, enhance the competencies of national Regulatory authorities and support the ECRB; a lot of work is required in this field by the SEE countries

8 Regional collaboration … Strike the balance between price regulation (affordability is an extremely important issue for the region) and competition: Strike the balance between price regulation (affordability is an extremely important issue for the region) and competition: Regulators and ECRB could have a very important role in this respect Regulators and ECRB could have a very important role in this respect Transparency is an extremely important issue and SEE countries (and not only them) have to perform very bold steps towards this direction Transparency is an extremely important issue and SEE countries (and not only them) have to perform very bold steps towards this direction Market monitoring is also an essential issue which has to be addressed on top of monitoring compliance with legal obligations Market monitoring is also an essential issue which has to be addressed on top of monitoring compliance with legal obligations

9 What others need to do … Others are (mainly) the EC, the Donors and the EU Institutions: Provide strong political support to the Process Provide strong political support to the Process Maintain the financial support (and probably link it with targets arising from the Treaty) Maintain the financial support (and probably link it with targets arising from the Treaty) Enhance the coordination of their efforts Enhance the coordination of their efforts Maintain leadership and provide guidance in a manner compatible with the specificities and the needs of the countries of the SEE region Maintain leadership and provide guidance in a manner compatible with the specificities and the needs of the countries of the SEE region

10 Conclusions … The ECSEE Process is a unique and challenging approach The ECSEE Process is a unique and challenging approach It perfectly meets the needs of the International Community and the countries of the region, providing opportunities and enhancing security of energy supply It perfectly meets the needs of the International Community and the countries of the region, providing opportunities and enhancing security of energy supply However, strong efforts are required by all stakeholders, especially following the entry into force of the Treaty However, strong efforts are required by all stakeholders, especially following the entry into force of the Treaty The sooner these opportunities are exploited, the better for the SEE people The sooner these opportunities are exploited, the better for the SEE people It will be a cumbersome and time consuming procedure It will be a cumbersome and time consuming procedure Success will depend on the steps taken and interim results Success will depend on the steps taken and interim results Strong political will and support is required, mainly from the countries of the region themselves Strong political will and support is required, mainly from the countries of the region themselves