1. Overview of the Legal Framework New Policy Initiatives Renewable Energy Certificate Mechanism 2.

Slides:



Advertisements
Similar presentations
Utility Planning Perspective For A Solar Feed In Tariff (FIT) February 3, 2009 Gainesville Regional Utilities.
Advertisements

international strategic management
Confidential A PHI Company 1 NJ Off-Shore Wind – Recommended Compliance Structure Stakeholder Meeting January 13, 2009.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
State Policy Initiatives Financing Wind Power: The Future of Energy May 7-9, 2008 Richard Cogen.
Regulatory Framework and Emerging Issues Mahesh Vipradas.
UNITED NATIONS Shipment Details Report – January 2006.
The National Standards and Quality System Jean-Louis Racine The World Bank Cambridge, England April 19, 2007 Knowledge Economy Forum VI Technology Acquisition.
DG Energy and Transport, European Commission Fabrizio Barbaso 17/04/2008 EU RENEWABLE ENERGY PROPOSALS ARF Energy Security Seminar EUROPEAN COMMISSION.
The Implementation Structure DG AGRI, October 2005
The Managing Authority –Keystone of the Control System
European Union Cohesion Policy
Module N° 6 – SMS regulation
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
Promotion and Tenure Workshop 1. Evaluation Procedure There is only one evaluation procedure leading to recommendations regarding promotion, tenure and.
Trade Promotion Management Study Summary Charts
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Town Hall Presentation January 9-10, 2002 Curtis Powell Vice President for Human Resources The Division of Human Resources and William M. Mercer, Incorporated.
The Federal Reserve System Chapter 14 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Managing the Pricing Function 14.
The European Lighting Industry Position on How to Maximise the Potential Benefits of European Policy on Energy Efficiency in Lighting January 2008.
Creating and Capturing Customer Value
VOORBLAD.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
15. Oktober Oktober Oktober 2012.
Digital Futures International Forum - Tuesday 18th September 1 Digital Futures International Forum The Digitisation Standard: Back & Forth Stephen Clarke.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Lessons from community energy projects in Wales A brief overview Matthew Leese 1.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Presented to: Minnesota Chamber of Commerce October 1, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Solar PV system - financial assistance and incentives
“Energiewende” and cost mechanisms Charlotte Loreck Energy and Climate Division Öko-Institut e.V. Berlin for Heinrich Böll Foundation 5 December 2012.
25 seconds left…...
1 Review of the EU regulatory framework for electronic communications Stephen Banable European Commission DG Information Society and Media ITU Conference.
Januar MDMDFSSMDMDFSSS
Internal Control and Control Risk
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Energy Generation in Mitochondria and Chlorplasts
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
ABPS Infrastructure Advisory Private Limited REC Mechanism in Himachal Pradesh Utility Perspective Ajit Pandit Director, ABPS Infrastructure.
LIVE GREEN. DO RIGHT. Renewable Energy Certificates By: Gensol Consultants Pvt. Ltd.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Renewable Energy Certificate Mechanism
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Outline  Chronology  Conceptual framework  Salient Features of REC Mechanism  Role of Central Agency  REC Procedures  Current Status.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
Renewable energy support schemes in the Republic of Moldova
Operationalizing One Nation One Grid
Target Clients Renewable Energy Generators in India
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Analysis of Solar Power Market
bihar electricity regulatory commission
Presentation transcript:

1

Overview of the Legal Framework New Policy Initiatives Renewable Energy Certificate Mechanism 2

3

Tariff regulations of the Regulatory Commissions to be guided by promotion of generation of electricity from renewable energy sources State Electricity Regulatory Commissions (SERCs) required to specify Renewable Purchase Obligations (RPOs) The National Electricity Policy to aim for optimal utilisation of resources including renewable sources Regulatory Commissions required to promote the development of power markets. 4

SERCs in all major States have specified RPOs RPOs vary from 1% to 10% in different States Presently the share of renewable energy is about 4% in total electricity generation Share of solar energy presently is negligible. 5

CERC has issued comprehensive tariff guidelines for renewable energy. Tariff design to ensure assured return with full cost recovery during the debt repayment period. As a special dispensation, this full cost tariff has been allowed for 25 years for solar energy. 6

7

Published by the Government in year key areas chosen for National Missions National Solar Mission is one of these 8 Missions. Suggests RPO at 5% in year 2010, increasing 1% every year for 10 years. 8

The Constitutional Commission dealing with devolution of funds has recommended a support of US 1 billion dollars over the next five years for rewarding the States which facilitate addition of renewable based generation and support access to markets for renewables. 9

10

Present installed capacity based on renewables is about 15 GW This requires to be increased to 65 GW in next five years if RPO level is to go up to 10% nationally, as suggested in NAPCC. But a large part of untapped potential is located in the States which have already achieved high levels of RPO. REC mechanism is expected to overcome geographical constraints and provide flexibility to achieve RPO compliance 11

TOTAL GENERATION CAPACITY MW (As on )

13 Source : MNRE as on Oct09

14 StateRPO TargetRPO Met Maharashtra4%3% Gujarat2% Karnataka10%11.5% Tamil Nadu10%11% Punjab1%0.74% Haryana4%0% Madhya Pradesh10%0.07% Source : SERCs Orders

Wind- 11,531MW SHP- 643 Mw Wind – MW SHP- 196 MW Wind -4,584MW SHP- 762MW Wind MW SHP – 552 MW Wind MW SHP- 708 MW Wind- 1019MW SHP 400 MWMW Wind – 255 MW SHP – 295 MW Wind-4858MW SHP-63 MW Wind- 5530MW SHP – 499MW SHP MW SHP MW SHP- 1609MW SHP- 292MW SHP- 390 MW SHP- 706 MW SHP- 213MW SHP- 1609MW SHP- 1333MW SHP- 213MW Source : MNRE Annual Report

RE Generation Sale at Preferential Tariff Sale at Preferential Tariff Conventional Electricity Component Conventional Electricity Component REC Component Obligated Entities Distribution Company / Third Parry Sale Distribution Company / Third Parry Sale Obligated Entities 16

RE generators with capacity untied in PPA will have an option to sell electricity and REC separately REC will be issued to RE Generators only 1 MWhr 1 REC Purchase of REC would be considered as purchase of RE for purpose of RPO compliance. 17

Grid Connected RE technology approved by MNRE would be eligible for REC mechanism Separate category of Solar REC Provision of regulatory charge to enforce compliance of RPO. RECs are intra-country tradable certificates and are distinct from carbon credits. It is proposed to make RECs eligible for compliance with energy saving obligations. 18

Accreditation would be done at State level by State Agency (SA) to be designated by SERC. Registration by Central Agency Issuance of REC by Central Agency based on injection certificate. 19

REC exchange through power exchanges approved by CERC. Certificates will be exchanged within floor (minimum) price and forbearance (ceiling) price decided by CERC time to time. Monitoring Mechanisms : Appointment of Compliance Auditors by CERC for post monitoring of the REC Transactions. 20

The framework of REC settled by Forum of Regulators (FOR) Model SERC Regulations finalized CERC Regulations notified 21

Designation of Central Agency National Load Despatch Centre has been notified as Central Agency. Capacity building and skillsets for Central Agency & State Agencies. 22

Adoption of REC mechanism in SERC regulations Setting of RPOs in line with NAPCC We are doing a comprehensive study for impact analysis of different scenarios. Framework for absorption of infirm power within the home state 23

Notification of forbearance price and floor price CERC is preparing a consultation paper on the basis of criteria specified in the regulations. Preparedness of Power Exchanges 24

25 Website :

Objectives To establish India as global leader in solar energy and achieve a scale to drive down costs to levels required to achieve grid parity as soon as possible. Mission Targets To create enabling policy framework for deployment of 20,000 MW of solar power by To ramp up capacity of grid connected solar power to 1000 MW by 2013 and additional capacity of 3000 MW by

Mission Targets contd….. To create favourable conditions for developing solar manufacturing capability in the country. To promote programme of off-grid applications, reaching 1000 MW by 2017 and 2000 MW by To promote deployment of 20 Million solar lights by To achieve solar thermal collector area of 15 Mn sqm by 2017 & 20 Mn sqm by

SERCs should specify RPOs immediately Procurement of energy from renewables to be at preferential tariffs Central Electricity Regulatory Commission to publish guidelines for pricing non-firm power from renewable sources Procurement through competitive route to be adopted to the extent possible. 28

29 Source: CEA

Detailed procedure of Central Agency to include -Requirements for registration of eligible generator -Issue of REC -Interface with power exchanges -Depository functions -Monitoring through reports of compliance auditors. -Revocation of registration Draft detailed procedure being prepared. 30