Villanova University Dept. of Civil & Environmental Engineering CEE 4606 - Capstone II Structural Engineering 1 CEE 4606 - Capstone II Structural Engineering.

Slides:



Advertisements
Similar presentations
Space and shell structures
Advertisements

An-Najah National University
CEE Capstone II Structural Engineering
Structural System Overview
Loads and Load Paths "Architecture is inhabited sculpture."
Gravity Force Resisting Systems
1 Sikandar Iqbal Graduate Trainee Engineer Civil Engineering Township Comparison & Analysis of Township Buildings.
Project #4 Energy Dissipation Capacity of a Wood-frame Shear Wall CEE Numerical Analysis.
Earthquake Basics Section 2. +What causes earthquakes? +How do earthquake forces enter buildings? +How does the building respond? +What building elements.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
Contents : Introduction. Rapid Visual Screening.
CEE Capstone II Structural Engineering
Final Report Terminal X McCarran International Airport.
Chapter 8 Plot Plans.
Framed Building Structure Lectured By: Ms. Noorhidayah Sunarti 15/4/2010.
High Rise Structural Systems
Commercial Foundations
GUD AFTNOON. SUBJECT CODE : GE1151 BASIC CIVIL AND MECHANICAL ENGINEERING.
Chapter 2b Foundations Shallow & Deep Foundations.
Topic 7: Timber Subfloor Systems – Basic
Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 1 CEE Capstone II Structural Engineering.
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 1 CEE Capstone II Structural Engineering.
Ken YoussefiUC Berkeley 1 Structural, Piping, and Welding Drawings.
Reading Structural Drawings
Frames and Walls Lateral Stability
TOPICS COVERED Building Configuration Response of Concrete Buildings
1 HVACR116 – Trade Skills Structural Drawings. 2.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 13 Civil Engineering Detail Drawings.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
Construction Drawings
Prepared By: Mohammed wafiq omer Mahmoud hammad Abd Algani Sami Malath omair An-Najah National University Faculty of Engineering Civil Engineering Department.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Structural Engineering Design and Drafting
Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 1 CEE Capstone II Structural Engineering.
An-Najah National University Faculty of Engineering Civil Engineering Department.
Framing the House. Platform Framing Platform framing.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
Construction of Buildings to Prepare for Earthquakes What structures are needed to prevent serious damage ?
Villanova University Dept. of Civil & Environmental Engineering CEE 3704 Statistical and Numerical Analysis 1 Group Project #2 Energy Dissipation Capacity.
The four basic types of structures are :
Orthographic Drawings
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
DRILL: list 2 examples of what live loads are in the house below
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Introduction to Elevations
Review of Indian Seismic Codes
APPLICATIONS OF TECHNOLOGY
Welcome to Earthquake Engineering
An-Najah National University Faculty of Engineering
AQQABA SECONDRY SCHOOL Structural Design.
Prepared by John R. Henry, P.E. Senior Staff Engineer
CEN 180: Civil Engineering Drawing II
An-Najah National University
Introduction to Elevations
Wood Structures Topic 8 Quality Workmanship
Structural Drawing Chapter 19.
Analysis and Design of Multiple story building
Model Updating of a Nine-Story Concrete Core Wall Building
Framing the House                                                                                                                   
Building Frame (Column & Beam)
1 Semester Project Design A Multi Story Office Building
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
Civil engineering drawing
Masonry Bearing Walls.
Commercial Structural Framing Systems
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg.
Presentation transcript:

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 1 CEE Capstone II Structural Engineering Lecture 4 - Load Paths and Construction Considerations

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 2 Outline 1. Building systems 2. Load paths 3. IBC requirements for concrete and masonry 4. Construction update 5. Other projects

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 3 General Comments 1.Schedules were fine for submittal, but need to have far more detail to be useful within your groups. 2.Load paths were good, but need more detail on the specific structural elements. 3. Answer these questions: How does the wind load get to the column? How does the altar load get to the column? Are there any beams in your structure?

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 4 Building Systems

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 5 Load Paths Building Frame System –Gravity loads are carried entirely by slabs, beams, columns (frame action) –Lateral loads are carried entirely by the shear walls

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 6 Floor Slabs

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 7 Elevated Slab(s)

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 8 Wind Load on Front Face Wind

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 9 Wind Load from the side Wind

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 10 Drawing 06 - Section Through Living Room EQ

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 11 IBC Requirements How does having the Category (A – F) of the structure affect the design of the concrete structural elements (beams, columns, and slab) for gravity load? How does it effect the design of the masonry walls?

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 12 IBC Requirements Remember that we have a building frame system –Gravity loads  Beams, Columns, Slab –Lateral loads  Masonry Shear Walls But…the two systems still must work together

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 13 References Design of Low-Rise Concrete Buildings for Earthquake Forces, Portland Cement Association, 2 nd Edition, Reinforced Concrete, A Fundamental Approach, Nawy, 5 th Edition, Chapter 16 IBC, 2000, Chapter 19, Concrete IBC, 2000, Chapter 21, Masonry

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 14 Recall the General Site Layout Cornfields Woods / Hilltop Gate Bldg. 1 Bldg. 2 Pumphouse Open Field Path Animals Garden Chapel Site Dirt Road

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 17 Porch 2001

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 20 January 2003

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 21

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 22

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 24

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 25

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 26

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 27 Storage Area Over Split Level

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 28

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 29

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 30

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 31

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 32

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering Sand or small aggregate?

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 34

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 36

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 37

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 38

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 39

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 40

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 42

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 43

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 44 Other Recent Projects Long distance phone system Drainage system in front of the boy’s dormitory (building #2)

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 45 Telecommunications Project

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 46

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 47

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 48

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 49 Drainage Project

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 50

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 51

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 52

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 53

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 54

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 55 Keep in mind that the quality of construction at the site is not typical of the surrounding area.

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 56 Non-engineered Structures

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 57 Construction Goals Construction of the 2 nd Story Beams, Roof, and/or “Chimney” –You need to select your column locations (the photos can serve as a guide) –develop a detailed framing plan for the second floor and chapel roof, and –determine loads for the entire structure.

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 58 You should have already … selected –material properties for concrete and steel and be well on your way to –determining the design wind speed and seismic category for the site.

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 59 Work Tasks Progress Report #1 for Tuesday –Design Schedule (do not present) –Detailed Load Path –Design Wind Speed –Design Ground Acceleration (don’t forget the agendas)

Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 60 Schedule for Progress Report #1 11:30 – 11:40 Ameriduras Ingeniros 11:45 – 11:55 Comma Engineers 12:00 – 12:10 Los Amigos de Amigos de Jesus 12:15 – 12:25 HyperStructo-CyberTronics Engineering and Associates 12:30 – 12:40 En Fuego Engineering Keep the setup and presentation portion < 10 minutes!