Semiconductor Switch Designs M.J. Barnes Acknowledgements W. Bartmann, L. Ducimetière, B. Goddard, J. Holma, A. Lechner, T. Fowler, T. Kramer, M. Meddahi,

Slides:



Advertisements
Similar presentations
1 Series Resonant Converter with Series-Parallel Transformers for High Input Voltage Applications C-H Chien 1,B-R Lin 2,and Y-H Wang 1 1 Institute of Microelectronics,
Advertisements

PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Professor Sung-Yeul Park
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
FCC-hh Injection and Extraction
Workshop on Special Compact and Low Consumption Magnet Design
Chapter 9 Practical Application Issues of Power Semiconductor Devices
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
J. Holma CLIC Workshop, Jan 30, J. Holma Acknowledgement M.J. Barnes CERN TE/ABT Present Status of Inductive Adder Development for the CLIC DR Extraction.
Development of Solid State Long Pulse Klystron Modulators
MARX GENERATOR FOR THE NEW HRR PULSE POWER SUPPLY M.J. Barnes and L. Redondo (Lisbon Superior Engineering Institute, Portugal) 13/05/2014CLIC RF Breakdown.
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
High Rep-Rate CLIC Combiner Ring Kicker 5/6/14 ALERT 2014 Workshop Mark Kemp SLAC/CERN Collaboration Effort.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
Fast high-voltage, high-current switching using stacked IGBTs
An Assessment on Klystron Modulator Topologies for the ESS Project Carlos A. Martins (*), Karin Rathsman(**) (*) – Laval University, Dept. Electrical and.
High Rate Kicker Preliminary Study (Quick Update) Tony Beukers/Tao Tang 4/8/14.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
SYSTEMS CORPORATION Pulse Sciences Division FAST MARX-CHARGED ONE-STAGE MPC CONCEPT FOR KrF LASER IFE Doug Weidenheimer Titan Pulse Sciences Division.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
WP3: Beam Transfer Challenges M.Atanasov, M.Barnes, T.Kramer, B.Goddard, P.van Trappen Special technologies.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Sketching Basic Kicker System Parameters W. Bartmann, T. Fowler, B. Goddard, T. Kramer.
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
22 Set 2009 EPPC 09 CERN September /14 Solid-State MARX Type Circuit for the ISOLDE Target Voltage Modulator L.M. Redondo*, J. Fernando Silva.
TRIGGER DELAY 100µs. G. Gräwer AB/BT/ECLBDS Trigger Delay2 The trigger delay is a back-up system that generates an asynchronous dump trigger for MKD and.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
FCC DUMP SYSTEM W. Bartmann, B. Goddard, R. Ostojic FCC Dump Meeting, 14 th Jan
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
Fast Grid Pulse Modulation
Tao Tang, Craig Burkhart
Fundamentals of Power Electronics 1 Chapter 19: Resonant Conversion 19.3 Soft switching Soft switching can mitigate some of the mechanisms of switching.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
1 T. Mohite and H. Welker LINAC and Operation/ Electric Power Systems GSI Darmstadt Power Converters for the Magnets of Collector Ring in FAIR
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
CLOSED LOOP SPEED CONTROL OF DC MOTOR WITH PWM TECHNIQUE
T. Kramer, CERN TE/ABT FCC-week 2016, Rome, Italy Acknowledgements
Injection/Extraction Kicker CR Aleksey Kasaev BINP-FAIR-GSI workshop
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
PCIM Europe 2016 Power Conversion and Intelligent Motion
FCC Special Technologies WP3 (Beam Transfer Challenges) Summary M. J
Inductive Adders for the CLIC Damping Ring Kickers
Development of a Marx-Generator for the drive beam electron gun
Surviving an Asynchronous Beam Dump?
D. Woog M.J. Barnes, J. Holma, T. Kramer
Initial thoughts re prospects for alternatives to SF6 cables
Inductive Adders for the CLIC DR Extraction Kickers
Power converters for 2GeV injection
Development of Inductive Adders for CLIC DR Kickers – Status Update
Modulators - Inductive adder. Technical description.
FCC hh dump kicker - switch topologies and impact on beam
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
Laser activated thyristor. Technical description.
FCC Kicker Systems M.J. Barnes, T. Kramer CERN TE-ABT
Junji Urakawa (KEK) for ATF International Collaboration
FCC-hh injection group 7
Klystron Power Supplies for ILC
LECTURE 1 (Ch. 1) INTRODUCTION
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
POWER SEMICONDUCTOR DEVICES OVERVIEW
Kicker specifications for Damping Rings
Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens
Presentation transcript:

Semiconductor Switch Designs M.J. Barnes Acknowledgements W. Bartmann, L. Ducimetière, B. Goddard, J. Holma, A. Lechner, T. Fowler, T. Kramer, M. Meddahi, R. Schmidt FCC week, 23th-27th March /03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 1

Outline 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 2  Requirements for FCC injection kickers;  An existing kicker system at CERN;  The need for developments of semiconductor (solid-state) switches;  Possible semiconductor switch topologies for injection;  Requirements for FCC extraction (dump) kickers;  Possible semiconductor switch topologies for extraction;  Other R&D required;  Timeline and tasks for R&D;  Summary.

FCC injection kicker system requirements FCC Injection Magnet technology Delay line Kinetic EnergyTeV3.3 Kickmrad0.29 B.dlT.m3.2 Aperture heightmm = 35 Aperture widthmm = 35 Field rise/fall timeµs 0.28 Field flattop lengthµs2.25 Field flattop ripple%±0.5 System impedanceΩ5 Assumed system magnetic lengthm~30 Magnet currentkA~0.31 to ~3.1 Pulse voltage rangekV 1.8 to 18 Approximate number of injection kicker systems 40 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 3

An existing kicker system at CERN 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 4  In general, line type modulators are used with a main switch and a dump switch;  switch is typically a thyratron (closing switch);  Impedance matched Pulse Forming Line/Network (PFL/PFN), to minimise reflections, but requires the PFL/PFN to be charged to twice the load voltage;  PFL is probably most appropriate for FCC injection. LHC Injection PFN Line Type Modulator: Max. pulse length = 2 τ p I

The need for new developments 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 5  Thyratrons:  pre-fire (self turn-on without a trigger signal) is a concern;  long-term availability is a real concern;  have limitations with regard to dynamic range and repetition rate;  is only a closing switch  need for PFN/PFL for energy storage. Pulse Forming Line:  PFL has limitations: it should be matched to the load impedance, but coaxial transmission lines are commercially available only with certain impedances;  It is increasingly difficult to source coaxial transmission line for the highest voltage (~80 kV) kicker systems. Suitable semiconductor switch topologies can help to solve the above problems. CERN PS PFLs Injected beam Circulating beam Internal dump Kicker magnet Require a reliable kicker system, for FCC, to avoid mis-kicking beam: BUT…. Unkicked inj. Kicked circ.

Semiconductor Switches 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 6  Generally reliable and are not prone to self-triggering;  Allow a wide dynamic range of operation;  Maintenance is significantly reduced compared to gas switches;  Series and parallel connection of power semiconductor switches can potentially achieve designs with very high pulse power.  Examples of suitable switch technologies are:  Marx Generator;  Inductive Adder;  Depending upon the switch technology, solid-state modulators can be opened when conducting full load current, hence;  only a portion of the stored energy is delivered to the load during the pulse (therefore a PFL or PFN is not required);  potentially limit fault current in the event of a magnet (load) electrical breakdown;  source impedance can be low, hence source voltage does not need to be doubled.

FCC Injection: Marx Generator 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 7 Low source impedance; No output transformer  maximum pulse length limited by capacitor values and load; Modularity: same design can be used for different voltage (and current) specifications; xSwitches and control electronics are not referenced to ground; An international collaboration has been proposed between CERN and ISEL, Portugal, to investigate Marx Generators as a potential replacement for thyratrons (in existing systems at CERN too). Operation: Capacitors charged in parallel (shown: even # switches on), and discharged in series (odd # switches on)  high voltage output.

26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 8  Adder originally developed at SLAC/LLNL;  Extremely high precision prototype built at CERN, for CLIC, based on MOSFETs (fast switching). Modularity: the same design can be used for different voltage and current specifications; Short rise time can be achieved (< 10 ns); Potentially interesting for consolidation of existing (short pulse) systems too; Switches and control electronics are referenced to ground; Promising technology for FCC injection; Output pulse voltage can be modulated; Redundancy easy to build-in; ΧOutput transformer  maximum pulse length limited to typically ~3 μs; FCC Injection: Inductive Adder (N-1) layers Leakage inductance Capacitors Primary loop inductance Fast diode clamp Magnetizing inductance Semiconductor switches Trigger Constant Voltage Layers Analogue Modulation Layer Load Gate drive circuit Gate drive circuits 1:1 coaxial transformer Primary current Semiconductor switch (x8) Capacitor (x8) 5 layer CLIC prototype

FCC extraction kicker system requirements FCC Extraction Magnet technology Lumped inductance Kinetic EnergyTeV3.3 to 50 Kickmrad0.15 B.dlT.m1.6 to 25 Aperture heightmm36 Aperture widthmm36 Field rise/fall timeµs≤3 Field flattop lengthµs350 Field flattop ripple%10 System impedanceΩ Assumed system magnetic lengthm~90 Magnet currentkA·Turns~0.55 to ~8.3 Output pulse voltage rangekV Approximate number of extraction kicker systems300 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 9

Existing LHC Extraction System  Generator voltage must track the beam energy and have a low pre-fire rate.  Gate Turn-Off Thyristor’s, modified to be fast turn-on devices, are connected in series  high di/dt;  Allows a wide dynamic range of operation;  Fourteen extraction kicker systems per beam:  for safety reasons, in case of pre-fire of one generator, all are triggered  asynchronous dump.  Two parallel generators (redundancy). 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 10  Voltage: 2.2kV – 30kV;  Current: 1.3kA – 18.5kA;  Current flat top: 95μs. LHC dump – beam sweep:

26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 11 FCC Extraction System System must be ULTRA RELIABLE  Consider an highly segmented system:  hence pre-fire of one generator does unduly influence beam;  not necessary to trigger other generators  doesn’t give an asynchronous dump;  redundancy..  Several switch topologies under investigation:  Scale existing LHC extraction generator for FCC (for segmented system  reduced current compared to LHC generator);  Brainstorming  idea based on an opening semiconductor switch:  switch is normally closed (conducting current) during inj. and ramp;  switch opened to switch off current and extract beam;  current proportional to kinetic energy of beam;  “fail safe” (no current  beam extracted);  BUT high losses, maybe superconductivity can be used??? Talk by W. Bartmann (Tuesday)

Other R&D Required (Inj. & Ext.) 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 12  Study performance of various semiconductors, e.g. SiC, MOSFETS, IGBTs, …. (now & years time???);  Magnetic materials;  Ultra reliable triggering/controls;  Other ideas for switch topologies;  Failure mode analysis;  Redundancy;  Fault tolerance;  Reliability;  Possibility of locating generator in tunnel, under magnet;  Shielding of electronics;  Radiation tolerant components;  Low source impedance may result in high fault current;  Controls must detect fault current and limit magnitude;  Triggering method(s), e.g. fibre optics;  …….

26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 13 Timeline and tasks 2015: Task 1: Complete proposal (objectives, timeline, identify lab space, secure resources, secure budget, and establish formal collaborations). Task 2: Study overall concepts and kicker system options, and define key parameters for FCC injection and/or extraction kicker generators : Task 3: Test and select individual components (switches and magnetic materials for cores), design of the prototype for FCC injection. [collaborations sought] 2018: Task 4: Document results and CDR write-up. Task 5: Construct the prototype system (generator, transmission lines, load). 2019: Task 6: Test the prototype. Note: timeline is dependent upon resources and budget availability….. Collaborations very welcome!

Summary Very challenging requirements ; High reliability kicker systems are required for FCC; Parallel and series arrays of semiconductor switches are promising for both FCC and consolidation of existing kicker systems; eliminate pre-fire associated with thyratrons; eliminate need for very high voltage rating coaxial cable; built in redundancy; modularity. Closing and opening capability eliminates the need for a PFL/PFN; Source impedance can be low, allowing a relatively small number of series connected power semiconductors. BUT requires a careful consideration of fault conditions; Redundancy, fault tolerance, radiation tolerance,… 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 14

26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 15 Comments and suggestions are VERY welcome.

26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 16

Line type modulator example waveforms 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 17

0 -2k -4k -6k -8k 2k 01μs1μs2μs2μs 3μs3μs4μs4μs 5μs5μs Simulation: Magnet current Switch voltage 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 18 FCC Extraction System: opening switch possibility

Example of normal and fault currents 26/03/2015 FCC Week: Semiconductor Switch Designs. M.J. Barnes 19