1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Subsidised Studies – BOOTs and All Mark Berger – Director E+PC Engineering & Projects Company Limited South Africa Canada – South Africa Chamber of Business.
Professionalise | re-prioritise | standardise | benchmark | improve industry relationships and industry performance | lead reform The Real Price? Corrina.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Construction Engineering 221 Cost Estimating and Bidding II.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Defense Contractor Financial Management presented to EPMC by Dr. Tony Perino.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Analysis of Public Submissions Presidential SOE Review Committee Democracy, Governance and Service Delivery Date: 29 November 2011 Democracy, Governance.
The Outsourcing Process
Cost Planning & Scheduling CTC-415. Bid Estimate Becomes the project budget upon signing of contract Can cost load the schedule –Effective means of cost.
Slide 1 Policy Alternatives to Stimulate Private Sector Investment in Domestic Alternative Fuels Wally Tyner with assistance from Dileep Birur, Justin.
Framework for Port Reform
Construction Engineering 221 Cost Estimating and Bidding.
EM15 – Contractors COST MANAGEMENT
Planning & Delivery Systems Construction Engineering 380 Engineering Law.
Obtaining Surety Credit An Introduction to the Surety Process for Contractors and Subcontractors.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Public-Private Partnerships: State of Practice and Research Needs The 14 th Annual Public Private Partnership Conference World Bank, Washington, DC September.
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Comparison of International P3 Model, Corp and Hybrid Lease The Great Debate:
Small Farm Profitability: Is Wind Energy the Answer? 1
Financing Urban Public Infrastructure
State Auditor’s Office Change Order Pricing Practices Performance Audit of Eight Local Governments Puyallup City Council February 7, 2012 Chris Cortines,
Project Planning and Capital Budgeting
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
Building Industry Game B.I.G. - Building oror Building/Heavy Associated Schools.
Chapter 16 Capital Goods McGraw-Hill/Irwin Purchasing and Supply Management, 13/e © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT Kumar Gyanendra Mohan
Industrial Engineering Roles In Industry
Vietnam Budget Reform over and Intentions over Content (3 parts): 1.Fiscal – budget reforms initiatives making important contribution.
Construction Contracts and Project Delivery Methods
Economies of Scale. The advantages of large scale production that result in lower unit (average) costs (cost per unit) AC = TC / Q Economies of scale.
Finance: The Critical Link The Transportation – Land Use – Environment Connection Brian D. Taylor October 2003 Institute of Transportation Studies.
Development of a Tribal Utility Why is the Development of a Tribally Owned Utility a Why is the Development of a Tribally Owned Utility a “Good Thing”
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
King Fahd University of Petroleum & Minerals
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Ch 91 IT-390Cost Analysis. 2 Project Estimating (Design) l A Project Estimate is one of a kind n Custom design, only one will be manufactured n Capital.
Economies of Scale. The advantages of large scale production that result in lower unit (average) costs (cost per unit) AC = TC / Q Economies of scale.
Chapter 3 Financial Management Part 2 BCN 4772 Summer 2007.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Time for Public-Private Partnerships for U.S. Navigation Projects Dominic Izzo PE – KBR Director, PIANC Commissioner Karim El Kheiashy PhD, MBA, PE – KBR.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Cost Estimating and Budgeting. Cost Estimating Initial Cost Estimate Initial Cost Estimate Underestimates are Initially a Big Problem Underestimates are.
Army Directorate of Public Works Support Contractor of the Year Building a government contractor for the 21 st century By Carlos Garcia Owner and CEO KIRA.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Economies of Scale Asst. Prof. Dr. Serdar AYAN. Economies of Scale The advantages of large scale production that result in lower unit (average) costs.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
Process Economics Factors that affect profitability
The Feasibility Study: something we already know
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
The New Italian Law on Ports in the European Perspective
Costs and Economics of Construction
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
ENGINEERING ECONOMIC DECISION CHAPTER 1
CIVL 493 CONSTRUCTION MANAGEMENT
progress of the water reform in bulgaria
The Role of Private Sector in Capital Budgeting
R&D Tax Incentive ATY Advisory.
Sustainable Public Procurement
Presentation transcript:

Technical Manager; Bechtel Oil, Gas & Chemicals. Financial Risk Analysis and Cost Reductions Alternatives for Dredging Projects Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Karim El Kheiashy PhD MBA PMP PE Technical Manager; Bechtel Oil, Gas & Chemicals. Maurice "Zickie" Allgrove C.Eng. Director; Ports and Marine Terminals, Worley Parsons

Outline Introduction Cost Breakdown Risk Analysis Contingency Determination Cost Reduction Alternatives Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Outline

Introduction Land cost Energy Exploration Maritime Infrastructure Industry Capacity Funding Limitations Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. The cost to replace the present system of locks is estimated at more than $125 billion. - ASCE Introduction

Cost Breakdown Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Cost Breakdown

Cost Breakdown Bare Costs Direct Costs Contract Cost Project Cost Bare costs are defined as cost in a project that have no markups included. This excludes productivity, overtime, any tax adjustments, any direct cost markups, contractor markups, special markups or owner cost markup. Direct Costs Direct cost equal bare cost plus all direct cost adjustments (Direct Labor, Direct Equipment and Direct Sub Bid) which includes overtime and productivity, but does not included contractor payroll taxes and insurance (PTI). Contract Cost The Contract Cost includes the Cost to Prime plus the performing contractor’s markups, subcontractor markups, sub-subcontractor markups, etc. Contractor markups are already included in the Cost to Prime. PTI and any allowances, such as small tools, are applied to the contractor’s own work and then any indirect markups, such as job office overhead (JOOH), home office overhead (HOOH), profit, bond, excise tax, etc., are applied to the total. Special markups are included in the cost; however, they are only included as an additional cost that is not subject to further compounding by markups at higher levels. Project Cost The Project Cost includes the cost to owner plus any owner markups, such as escalation, contingencies, SIOH (owner’s supervision, inspection and overhead) and/or other costs as defined. Cost to Prime The Cost to Prime includes the direct cost plus all contractor markups that apply, up to the item/folder that is being viewed. That is, the cost to prime is the cost to the performing contractor, not including his own PTI and indirect markups. The cost to prime does include any sub or sub-subcontractor's PTI and indirect costs, but not the performing contractor’s PTI and indirect markups. For example, the cost to prime includes the direct cost of the prime contractor’s own work, the direct cost of their subcontractor’s work and the subcontractor’s PTI and indirect markups on their work. PTI and any allowances, such as small tools, are applied to the subcontractor's own work and then any indirect markups, such as JOOH, HOOH, profit, bond, excise tax, etc., are applied as defined by the estimator. Any subcontractor, sub-subcontractor, etc., special markups are also included in the cost to prime; however, they are only included as an additional cost that is not subject to further compounding by markups at higher levels.  Mark-ups Markups may include direct cost markups, contractor markups, special markups and owner markups. Direct cost markups can include adjustments to the direct cost for productivity, overtime, taxes and/or other adjustments as defined by the estimator. Contractor markups can include PTI; allowances, such as small tools; indirect costs, such as JOOH and HOOH; profit; bonds; and/or other costs as defined by the estimator. Contractor markups are defined for each contractor, subcontractor, sub-subcontractor, etc. A special markup can also be defined by the estimator and applied by the contractor, subcontractor, etc. Owner cost markups can include escalation, contingencies, SIOH (owner's supervision, inspection and overhead) and/or other costs as defined by the estimator. Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Cost Breakdown

Risk Analysis Risk factors Size of the job; Portion of the work to be done by subcontractors; Nature of work; Where the work is to be performed and period of performance; Relative difficulty of work, the reasonableness of negotiated costs; Amount of labor included in the costs; Environmental issues Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Risk Analysis

A contingency value to account for project risks and unknowns. Contingency in estimates is not additional profit or fee; it represents an actual construction cost. Monte-Carlo Simulation for risk quantification / possible cost outcomes. Contingencies, as defined in the Cost Narrative of the USACE Cost Engineering Report, provide “allowances to cover unknowns, uncertainties and/or unanticipated conditions that are not possible to adequately evaluate from the data on hand at the time the cost estimate is prepared but must be represented by a sufficient cost to cover the identified risks” Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Contingency

Costs Bare cost Direct cost Contract cost Project cost Contingency Operation & Maintenance Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Costs

Benefits to Cost Ratio (BCR) Bare cost Direct cost Contract cost Project cost Contingency Operation & Maintenance Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Benefits to Cost Ratio (BCR)

Owner – administer contract management Engineering Procurement Construction Contracts For large and long term dredging projects, it is better to devise a programmatic management approach to help control costs and reduce some of the indirect costs to projects. A program management approach that would seek to reduce overall indirect costs would employ large engineering/design-procurement-construction (EPC) contracts for the project. These large contracts that are program oriented would replace the numerous separate design and construction contracts. Reduction of scheduled construction calendar time that requires the presence of construction companies with their management structures and other overhead costs that are charged directly to the construction project. Fewer mobilizations and work location changes that reduce the total distances that materials, equipment, and people must travel. Reduced prices of labor, materials, and transportation. Reduced indirect project costs and general direct project costs. Owner – administer contract management EPC Contractor – Single point of responsibility, communication and coordination Special consultants Vendor Sub-contractor ---------- Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. --------- Cost Reduction

Cost Reduction Public Private Partnership Government control (participation and ownership) with private efficiency and capital Access to a broader range of financing Access to additional capital Fewer constraints on accessing capital (e.g. annual appropriation) Risk sharing (specificity, complexity, uncertainty) Lower costs of service through specialization Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Cost Reduction

Cost Reduction Public Role Establishing infrastructure Establish a regulatory framework Establish a business environment Encourage economic opportunity Encourage private investment Protect labor interest Private Role Generate a rate of return Handle operational aspects Manage commercial risks Propose and implement investment policy Incentives for high performance and competitive tariffs Play a crucial role in fostering efficient logistics development Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Cost Reduction

Cost Reduction Government Vs. Private Clients Labor Laws Taxes Fuel Cost Schedule (delivery dates / investment returns) Location (intracoastal / navigation) Environmental Reclamation / Disposal Project Size (Economy of Scale) Negotiate / Industry Competition Sample Notes Titles Sample notes for replacement For over 100 years, Bechtel has been a primary force in shaping the world's infrastructure. Power plants and pipelines and petroleum refineries that fuel economies on six continents. Airports and railways that move people and goods. Microelectronics facilities and telecommunications systems that create jobs and boost living standards. At Bechtel, we're proud of the role we've played in building the 20th century. But we're much more interested in the ways we can help meet the challenges of the next hundred years. Wherever the job. Whatever it takes to do it right. The way we always have. Cost Reduction