Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 5 Time Management Developing and controlling the.

Slides:



Advertisements
Similar presentations
CP Chapter 4 Schedule Planning.
Advertisements

PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
Work Breakdown Structures
Estimating, scheduling and budgeting
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 6 Cost Management Ending the reliance on the budget.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
Advanced Project Management - CPH
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Chapter 10: Project Schedule Planning
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Systems Analysis and Design 9th Edition
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Time Management
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Copyright 2008 Introduction to Project Management, Second Edition 1  Project time management involves the processes required to ensure timely completion.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Project Time Management
Importance of Project Schedules
Jeopardy Game! Scope Management Time Management Integration Management.
Chapter 6: Project Time Management
Project Time Management
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
HIT241 - TIME MANAGEMENT Introduction
Chapter 3 : Managing the Information Systems Project.
Chapter 6: Project Time Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s original.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Scheduling Sequence & Time.
Chapter 6: Project Time Management
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Project Management Project Planning Estimating Scheduling.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 10 Risk Management Proactively managing the positive.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Chapter 6: Project Time Management Information Technology Project Management,
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
Advanced Project Management Project Time Management Ghazala Amin.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
Chapter 3 Managing the Information Systems Project
Project Time Management
SOFTWARE PROJECT MANAGEMENT
Chapter 4 Note: See the text itself for full citations.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Project Management MGT 30725
Chapter 6: Project Time Management
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Importance of Project Schedules
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 5 Time Management Developing and controlling the schedule

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter overview 1.Planning schedule management 2.Defining activities 3.Estimating durations 4.Identifying the resource capability 5.Experimenting with the sequence 6.Developing the schedule 7.Working with the critical path 8.Controlling the schedule 2

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Planning schedule management  a document that will guide and direct how the project schedule is ultimately managed throughout the project  The plan may include reference to: o the rationale for managing the schedule o any perceived obstacles or constraints impacting o appropriate control thresholds triggering an intervention o timing and format of schedule reports (against the plan) o processes required to update the schedule o project management software for developing the schedule o preferred tools to be used (e.g. WBS, milestones, Gantt Chart) o estimating techniques o change control procedures o rules in calculating percent complete o definitions of actual performance measurement 3

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Defining activities  Verb-noun descriptor (e.g. write report)  Unique identifier (WBS number)  Activity time (duration v/s effort)  Logical relationships (predecessor and successor)  Resource requirements  Constraints and/or assumptions  Required standards 4

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Estimating durations  Pre-determined  Expert judgement  Analogous  Group decision making  Unit rates  Published commercial data  Parametric  Vendor bid  Reserve  3 point 5

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Identifying the resource capability Consider the following suggestions (easily recorded in a resource matrix):  Resource name—individual name or generic label (e.g. plumbers)  Resource type—labour, material,…  Resource group—the group to whom the resource belongs  Resource capability—skills, expertise, prior experience, …  Resource rate—what is their normal rate, or other fixed/variable costs  Resource location—the physical (geographical) location  Resource quantity—how many will be required  Resource availability—the actual ‘free’ time they have to allocate  Resource calendar—what dates are excluded throughout the project  Resource report—who does the resource currently report to  Resource development—will any additional training be required  Resource evaluation—performance evaluations from past projects 6

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Experimenting with the sequence The development of the project schedule is driven by these activity-to-activity relationships in determining when activities start and finish. Finish – Start: one activity finishes to start the other activity Start – Start: one activity starts to start the other activity Finish – Finish: one activity finishes to finish the other activity Start – Finish: one activity starts to finish the other activity 7

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Developing the schedule  A work breakdown structure is not a schedule  Network diagrams and/or Gantt charts create schedules  Schedule activities to start as-soon-as-possible  Activities can be sequenced in–series or in parallel  Milestones signify significant points in time (zero duration)  Relationships may be mandatory, others discretionary  Schedules often represent intent; not necessarily reality unless they are updated regularly  Work backwards to try and eliminate errors and time 8

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Working with the critical path  The longest path(s) throughout the schedule (activities on this path represent the longest duration scheduled for the project’s completion)  The path(s) or activities(s) with zero float (meaning nothing can be delayed)  The activities(s) or milestone driving the end date of the project  The shortest completion time of the project (where the project cannot be completed in any less time within the current schedule). 9

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Controlling the schedule To effectively control the project schedule, the following actions should be considered:  updating changes to the schedule as they occur  determining the current reporting date of the project  assessing the current status of the project against the published plan to identify true performance  re-scheduling remaining activities  re-circulating the agreed schedule revision  conducting retrospective reviews and walkthroughs to record lessons learned 10

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Review questions 1.What is the value behind having a schedule management plan? 2.What information does a work breakdown structure capture and how does this help scheduling? 3.Activity duration and resource estimates are often not precise calculations. What techniques are available and how would you defend your choice of technique? 4.What is the difference between critical path and critical chain methods? 5.Explain why project schedules have to be developed, tracked, reported and controlled throughout the project? 11

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Group learning activities  Discuss the rationale for having to manage and control the schedule  Compare and contrast different estimation techniques for their accuracy  Provide examples of mandatory and discretionary relationship types  Debate the notion of scheduling work to start as soon as possible  Discuss how a Gantt chart is both a planning and managing tool  Discuss why schedule intent seldom reflects reality (prior to it being updated) 12

© 2014 Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Assessment options  Debate where the focus should lie - critical path or critical chain  Create a detail resource matrix capturing the capability required for a project  Construct a Gantt chart to scale of a project reflecting a WBS, activities, milestones, relationship types and critical path  Short answer questions  Multiple choice questions 13