WORK ITEM REFERENCE NAMING FOR E2NA ETSI Secretariat – E2NA#03 © ETSI 2012. All rights reserved 1.

Slides:



Advertisements
Similar presentations
How does ETSI work? ETSI Seminar © ETSI All rights reserved.
Advertisements

SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
SEM08-09 Organizing the work ETSI Seminar © ETSI All rights reserved.
SEM16-05 Maintenance & withdrawal of documents ETSI Seminar © ETSI All rights reserved.
SEM14-05 Approving your draft ETSI Seminar © ETSI All rights reserved.
REPORT FROM OCG#50 TO BOARD#93 Doc: ETSI/BOARD(13)93_052r1 Source: OCG Chairman Agenda item: 4 For: Discussion (Late) © ETSI All rights reserved.
SEM07-04 Work Item numbering ETSI seminar © ETSI All rights reserved.
EP E2NA Report from OCG#47 and Board Doc: BoardE2NA(12)3_0xx Source: EP E2NAChair Agenda item: 2.3 For: Information © ETSI All rights reserved.
TC PLT Liaison to E2NA Doc: E2NA(13)06_008 LS_E2NA_TC_PLT Source: TC PLT Chair Agenda item: For: Info © ETSI All rights reserved.
Joint Wokshop with E2NA © ETSI All rights reserved Future topics of interest: some appetizers… 13 September 2012, ETSI Premises, Sophia Antipolis.
EP E2NA Meeting # 6 –Wrap up Closing plenary notes, Jun 20, 2013 Co-Located meetings E2NA plenaries and WGs M493 #15 NTECH #3 INT #21 AFI #13 DECT #57.
TECHNICAL ORGANIZATION Organizing the work ETSI Seminar © ETSI All rights reserved.
SEM11-06 COMMITTEE PROCEDURES ETSI Seminar © ETSI All rights reserved.
SEM13-03 EDITHELP! ETSI seminar © ETSI All rights reserved Footer text (edit in View :Header and Footer)
SEM14-05 APPROVING YOUR DRAFT ETSI Seminar © ETSI All rights reserved.
1 ©2012 ZTR Control Systems, LLC All Rights Reserved Do You Know How Much Silence Costs? Communicate With Your Equipment Personalized & Proven Telemetry.
Way forward for LTE DL 4Rx AP SI on RF
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
IMPLEMENTING MOBILE NETWORK ENERGY EFFICIENCY STANDARDS Mauro Boldi (Telecom Italia) Rapporteur of ETSI TC EE ES © ETSI All rights reserved.
DRAFT NSAI NSR library structure CEN ISOCENNSAI Standards (EN) Tech.Specs (TS) Tech.Reports (TR) Workshop Agrms (CWA) Draft (prEN 123) Other Publications.
TC SCP REQ STATUS REPORT TO PLENARY #63 Davide Pratone, Chairman, Telecom Italia SCP(14)
SACM IETF-92 Meeting ETSI TC CYBER and SACM 27 March 2015 Tony Rutkowski,
How ETSI publishes 3GPP specifications. 15 October 2000JMM2 A 3GPP specification is based on the standard template (available from
1 ETSI and Lawful Interception Robin Gape Chair TC Sec WG LI.
25/11/20031 End-to-end QoS with the users' point of view QoS Workshop Paris 22 October 2003 P-Y Hébert - AFUTT/ETSI.
Rules Always answer in the form of a question 50 points deducted for wrong answer.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
SECURITY SIG IN MTS 28 TH JANUARY 2015 PROGRESS REPORT Fraunhofer FOKUS.
OneM2M portal introduction Group Name: Technical Plenary Source: Gerry McAuley, ETSI, Meeting Date: Agenda Item: 1.5.
TBXXX / STFXXX CLOSE DEBRIEFING REPORT Subject Presented by TB Chairman © ETSI All rights reserved Version: 7 December 2012.
1 st -6 th periods 10/16: Today we are writing a “Free Write Poem” – this poem is listed on the table of contents or an option for your portfolio/log book.
Words + picturesPicturesWords Day Day
WPM What’s behind the icon? Work Programme Management.
Fostering worldwide interoperabilityGeneva, July 2009 European UWB Regulation & Standardization Activities Sources: Michael Mahler, Chairman ERM/TGUWB.
WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: /18 Agenda.
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
© ETSI All rights reserved ETSI EN APPROVAL PROCESS (ENAP) Production time for ENs is being reduced by shortening the duration of the Approval Process.
Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 WPM What’s behind the icon? Work Programme Management.
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:

Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
© ETSI All rights reserved Management report of to OCG#XX. Doc: OCG(XX)0xx_xxx Source: TB/ISG Chair Agenda items: xxx For: Decision/Discussion/Information.
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
Update on ETSI Cyber Security work Charles Brookson OCG Security Chairman Largely based on presentations given by Judith E. Y. Rossebø ETSI TISPAN WG7.
2nd Grade ELA RW 1.1 Decoding and Word Recognition: recognize and use knowledge of spelling patterns (e.g., diphthongs, special vowel spellings) when reading.
MoW Report Group Name: TP20 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
ETSI INDUSTRY SPECIFICATION GROUPS A comprehensive guide Patrick Guillemin4 February 2014 © ETSI All rights reserved.
Space Communication Cross Support Architecture WG
WPM ad-hoc group report TP#24
Implementing Mobile Network Energy Efficiency Standards
ETSI Emergency Communications
Consistent version numbering across drafts & deliverable
Bruno Chatras, ETSI TC TISPAN Vice-Chairman
ETSI EE status of activities in 2013
Technical Organization and approval procedures
{TF/SIG/SC Name Here} Highlights from this Meeting:
TDL Open Source Project (TOP) Input to MTS#71, 31 May / 01 Jun 2017
BOARD PROCESS REPORT TO B#115
TITLE - TITLE - TITLE Subtitle – Subtitle - Subtitle
ETSI work with EY for HENs under M/536
TB/ISG <name> Management report to OCG#xx – date
Revision of EG CTI October 2013
© T Madas.
ETSI work with EY for HENs under M/536
The ETSI Standardisation Process
A         0 B          10 C         110 D         1110 E          1111    The six exceptions are: Class A  0  ( )  - no 0.x.x.x - can’t.
Standards update Copyright © 2015 BSI. All rights reserved.
EC Closing Report on Rules
European Standardization
A         0 B          10 C         110 D         1110 E          1111    The six exceptions are: Class A  0  ( )  - no 0.x.x.x - can’t.
Presentation transcript:

WORK ITEM REFERENCE NAMING FOR E2NA ETSI Secretariat – E2NA#03 © ETSI All rights reserved 1

Work item reference naming Rules : 1st deliverable or revised deliver: D or R Type of document: TR, TS, EN, ES, EG TB name Then free naming Example DTR/E2NA-XXXX 2 © ETSI All rights reserved

Options Numerical order whatever document type: DTR/E2NA-0001, DTR/E2NA-0002 Characterize group work REQ: DTR/E2NA-REQ-0001 ARCH: DTR/E2NA-ARCH-001 Prefix includes the group identification: xxx/E2NA-REQ- and xxx/E2NA-ARCH Characterize topics Example: DES/E2NA-0001-M493stage2 Prefix is simple: xxx/E2NA- Suffix can be chosen for each WI © ETSI All rights reserved 3