Making Zero Field Rework A Reality Workshop

Slides:



Advertisements
Similar presentations
1 DOE Safety Committee Handbook. 2 Effective Safety Committee! Make it work for you!
Advertisements

Making Zero Accidents A Reality
Richard Hislop Construction April 7, CONSTRUCTION SAFETY Richard Hislop.
More CMM Part Two : Details.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Continuous Value Enhancement Process
Participant Challenge Pilot Program Participant Stage One Assess, Learn and Develop.
Family Resource Center Association January 2015 Quarterly Meeting.
1 Introduction to Workforce Planning and Development in State of Alaska Executive Branch Departments.
School Safety Training
Safety and Health Programs
Evaluation is a professional and ethical responsibility and is a core part of PHN professional practice Commitment to evaluation helps build the PHN intelligence.
Job Analysis & Its Components Job analysis: Job analysis: The process of describing and recording many aspects or elements of the job. The outcome of job.
Richard Hislop FAC April 20-21, 2006 CONSTRUCTION SAFETY Richard Hislop LCLS Construction Safety Coordinator.
Bureau of Workers’ Comp PA Training for Health & Safety (PATHS)
Supplier ESH Management Process Jose Valdez, CHST Benchmark Consulting Group, LLC.
Occupational Health and Safety Program Management Based on OSHA’s Four Point Workplace Safety Program Management Guidelines.
Safety and Health Programs
RESEARCH DEMONSTRATES CONSTRUCTION WORKER HEALTH PROTECTION IS LINKED TO SPECIFIC SAFETY MANAGEMENT ELEMENTS The University of Tennessee UT Safety Center.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
The BIM Project Execution Planning Procedure
Risk Assessment – An Essential Standard
High Potential Incident Intervention. Background 2 The principle policy of Downer Blasting Services regarding to our staff is “Zero Harm” The success.
Deloitte Consulting SCOOPS Session September 2003.
2005 Engineering & Operations Technical Conference – April Memphis, TN Kerry Bruce Manager, Safety & Health Services Safety Programs That Work Kerry.
9 Closing the Project Teaching Strategies
CPI Conference 2001 Education Tools and How to Access Them Education Committee Chris Hyvonen Kiewit Chris Hyvonen Kiewit.
Introduction & Implementation of TQM Introduction & Implementation of TQM By -Fuad Al- Ruhaili -Mohammed Al-hosawi -Talal Al-Hawsawi -Mohammed Al-Otaibi.
VPPPA Mentoring Program. The VPPPA Mentoring Program is a formal process to assist companies and facilities interested in participating in the Voluntary.
Software Quality Assurance Activities
EFFECTIVENESS OF TRAINING Group 5. Effectiveness of Training  What is “effectiveness of training”? Effectiveness means producing an intended result.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
1 Teichert’s Zero Injury Culture Program Overview Nancy Moorhouse, CSP, ARM, CMSP Presented for MSHA on Safety & Health Management Systems October 12,
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
AMERICAN SOCIETY OF SAFETY ENGINEERS – ENERGY CORRIDOR LEVERAGING LEADING INDICATOR DATA TO TRANSFORM EH&S PERFORMANCE SEPTEMBER 10, Quincey Jones.
32 nd National Energy & Environmental Conference September 19, 2005 Benchmarking the Engineering & Construction Industry.
SAFETY MANAGEMENT PROCESS Anne M. Bevington, Coors Brewing Company Safety Management Process – Proactive safety metrics that drive.
A Survey of Safety Culture DOE ISM Best Practices Workshop Lettie Chilson, West Valley Nuclear Services Company DOE ISM Best Practices Workshop Lettie.
EvergreenEcon.com ESA 2011 Impact Evaluation Research Plan Public Workshop #1 February 20, 2013 Presented By: Steve Grover, President.
VPP - The Indiana Model Becoming Friends with Indiana OSHA April 2015.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Quality Concepts within CMM and PMI G.C.Reddy
Elements of Effective Behavior Based Safety Programs
Georgia Institute of Technology CS 4320 Fall 2003.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Responsible Care® Health & Safety Task Force – 06 H&S.
Safety Culture and Empowering Safety Robby Jones, Supervisor NC Department of Labor, OSHA.
Private and Confidential 23 rd Annual Safety Excellence Award Best Practice Presentation.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Impact Assessment Indicators for Administration of Public Transportation Grants NCHRP Task 49 Viktor Zhong Scott Baker Dec 3, 2015.
1 David S.W. Tjong Report from Workshop 2 Benchmarking in OSH Ideal Standard International.
Establishing and Maintaining Effective Safety Committees.
Fidelity of Implementation A tool designed to provide descriptions of facets of a coherent whole school literacy initiative. A tool designed to provide.
Hans VanWinkle CII Director Austin Renaissance Hotel Austin, Texas September 11-13, 2005 CPI Conference Leadership of Tomorrow: Bridging the Gap.
Click to edit Master title style Click to edit Master title 1 1 ISM Best Practices Workshop September 12, 2006 David Smith Office of Corporate Safety Analysis.
How to write… Effective Safety Plans (c) Geigle Communications, LLC - Developing Effective Written Safety Plans This material is for training use.
Safety and Health Program Don Ebert- Risk Manager (509)
LESSONS LEARNED FROM RECENT PIPELINE INCIDENTS FLORIDA NATURAL GAS ASSOCIATION (FNGA) OPERATING & MARKETING CONFERENCE ROD WALKER PRINCIPAL CONSULTANT.
Safety Leadership Defining a World Class Safety and Health Program – An Industry Perspective* *Special thanks to GE Global Nuclear Fuels – for the use.
Building A Successful Worksite Wellness Program from Scratch William McPeck, MSW, CWWPC, WLCP Consultive Coach St. Albans, Maine Nationally Certified Worksite.
Accident analysis One-hour training.
1. Stephen R. Thomas Candace L. Macken Tae Hwan Chung Inho Kim Construction Industry Institute Funded by NIST 2.
Making Zero Accidents A Reality
Benchmarking as a Best Practice
Are Government Alliances a Threat to Workplace Safety
Continuing the journey of…
Overview – Guide to Developing Safety Improvement Plan
Overview – Guide to Developing Safety Improvement Plan
Breakout Session Summary Construction
Presentation transcript:

Making Zero Field Rework A Reality Workshop CII “Do It Right The First Time” Research Team CPI Conference Austin, Texas September 12, 2005

Self-Assessment Opportunity Checklist Q & A’s Agenda Introductions Research Overview Self-Assessment Opportunity Checklist Q & A’s

Research Gary Smith North Dakota State University for “Do It Right The First Time” Research Team CPI Conference Austin, Texas September 12, 2005

APPROACH Considering Significant research on the quantitative evaluation of rework has been done. Methods to measure rework have been defined. Significant research on safety has been done including measurements and safety management process improvements. Dramatic improvements in safety have been measured. Dramatic improvements in rework have not. What can be learned from safety implementation?

OBJECTIVES Identify and evaluate safety program components that may be convertible to quality processes Identify and evaluate error reduction processes Concurrently collect data on safety and quality processes. Formulate a comprehensive “zero-rework” management process

Safety Performance – TRIR 16.00 14.30 14.20 Industry* CII 14.00 13.00 13.10 12.20 11.80 12.00 10.60 9.90 9.50 10.00 8.80 8.60 8.30 7.90 Total Recordable Incidence Rate 7.19 8.00 7.10 6.80 6.12 5.32 6.00 4.31 3.44 4.00 3.00 2.66 2.30 1.60 1.59 1.67 2.00 1.03 1.02 1.23 1.18 0.00 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 325 413 477 497 527 613 644 770 518 765 995 936 1,117 1,073 1,140 Year and Work Hours (MM) * OSHA Construction Division, SIC 15-17 Reflects OSHA Reporting Change

Previous Rework Data CII Research Summary 10-2 (1989) 12% rework on 9 industrial projects CII Benchmarking & Metrics Data Report (1997) 3.4% for 19 industrial projects CII Field Rework (Rogge RT 153) (2001) 4.4% for 109 industrial projects Ranges between 0% and 25% CII Impacts of Delivery Systems (2002) 5.0% DB Contractors 3.0% DBB Contractors 326 Projects all types (Benchmarking Database) Field rework is additional work done in the field to rectify work done incorrectly no matter whether the incorrect work was originally done off site or onsite. Nor does it matter whether it was a design error, fabrication error, or construction error that caused the work to be done incorrectly in the first place.

Continuous improvement Basic Trends From Previous Studies: Continuous improvement CII Safety Limited data No recent improvement ??? Field Rework 1989 90 91 92 93 94 95 96 97 98 99 00 01 02 03

APPROACH “The Main Question” If effective safety management has been responsible for reduced total recordable incident rates, Then… what similarities would there be for quality management reducing field rework?

Making Zero Accidents a Reality Worker Involvement Evaluation and recognition/reward (incentives) Subcontract management Accident/Incident Investigations Drug and Alcohol testing Demonstrated management commitment Staffing for Safety Planning: Pre-project and pre-task Safety Education: orientation and specialized training

Research Approach Paired question survey Can we identify opportunities for rework reduction by examining safety and rework in the same cultural environment? Within the rework information collected can we identify specific field practices that can eliminate contractor errors?

SURVEY FORMAT Volunteer Projects Demographic Information Organized by key safety topics Matched questions created within topics Additional questions specific to topics also created Overall 103 Questions

Project Functional Description Project Type Project Functional Description No. of projects Manufacturing 9 Petrochemical 4 Pharmaceutical 3 Power 2 Telecommunication 1 Commercial/Pubic Buildings

Owner and Contractor Responses Respondent No. of Sites Owner 12 Contractor 10 Total 22 Average Field Rework Reported 3.13% Is Consistent With Other Studies Considering Blended Data

Comparative Analysis Findings KEY FINDINGS Comparative Analysis Findings Demonstrated Management Commitment for rework reduction was found in the research. Staffing for Quality Staffing levels for quality were generally lower than safety, given the requirement of discipline specific knowledge for quality Quality Pre Project and Pre Task Planning Pre-project planning (constructability analysis and project specific quality plans were consistent with safety planning Pre-mobilization quality analysis and pre-task quality analysis were lagging

Comparative Analysis Finding KEY FINDINGS Comparative Analysis Finding Quality Education Safety education more predominate and averaging 3 hours per month compared to quality/rework at 0.5 hrs per month A standard orientation for quality was implemented on less than ½ of the projects Worker Participation and Involvement The lower level of craft worker involvement and lack of incentives based on quality Subcontract Quality Management Subcontractors are more commonly required to submit safety plans than quality plans

Comparative Analysis Finding KEY FINDINGS Comparative Analysis Finding Quality- Rework Tracking Tracking rework was very common on the study projects Investigation of rework or defects was less common than for safety incidents Drug and Alcohol Testing Pre employment screening would be functional for both safety and quality programs For cause testing generally conducted more for safety than rework or defective work (20:6) Contract Type Lump sum contracts were shown to have less rework than reimbursable contracts which is opposite the relationship for safety

OPPORTUNITIES TO CONSIDER Staff for quality in appropriate manner – unlike safety, inspection requirements in rework and quality areas is based on discipline specific knowledge requirements Consider using subcontractor written quality plans Coordinate rework reduction training based on known factors contributing to rework problems

INFORMATION EXCHANGE Transfer of information to the field could take the form of rework reduction tool box talks or similar training opportunity Note: This figure was scanned from a handout provided to field personnel to reduce field rework.

Process Improvement – Data Analysis Evaluate rework causes in a consistent manner using Pareto Analysis

Thank You

Self-Assessment Opportunity Checklist Lew Coles DuPont Engineering for CII Do It Right The First Time Research Team CPI Conference Austin, Texas September 12, 2005

Quote from Our Pilot Interviews “It’s interesting that we always went back to the analogy of how we do our safety process so well.”

Zero Field Rework Self-Assessment Checklist What is it? What is it intended to do? What’s the value to my organization? How is it different from what I already do? When should I use it? How does it work?

What Is the Self-Assessment Checklist? A tool used by the project team to help identify areas for further improvement on the journey to zero field rework. Contains 8 elements and 117 questions.

Where can the Self-Assessment Checklist be used? Large Projects Sites with multitude of small projects Fab shops Any contracting strategy By owners and contractors…around the globe Backward integration into engineering design.

What the Self-Assessment Checklist Is Not It is not a tool to generate a lengthy list of administrative action items.

When Can It be Utilized? During project Front End Loading when the construction quality plan is being developed. During construction to audit against the plan. During the post-project review to help identify key learnings and improvements for future use.

The Self-Assessment Checklist Can Help To…. Improved employee morale: Reduced rework -- nobody likes rework Workers feel more highly valued Better communications Teamwork Reduced costs Improved project cycle time Improved safety performance

Self-Assessment Checklist Elements Primarily focused on People

Typical Quality Assessment Primarily focused on Things

Performance (Results) Element #1 -- Leadership by Example Percentage of workers on the team who understand how they contribute to quality and rework goals. Number of quality and rework related issues observed this period. Cost of rework activities by month. Cost of materials written off due to quality and rework issues by month. Hours written off due to quality and rework issues by month. Number of quality and rework toolbox talks completed this month. Visibility of site quality and rework Goals and Plan. Number of open and overdue quality and rework issues this period.

Thank You! Questions?