ETSI TC SCP WG TEST Status Report to TC SCP Plenary #49

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
3rd Annual Plex/2E Worldwide Users Conference 13A Batch Processing in 2E Jeffrey A. Welsh, STAR BASE Consulting, Inc. September 20, 2007.
AP STUDY SESSION 2.
1
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Membership & Roster Maintenance September 2013 ASTM Officers.
NANPA Oversight Working Group Status Report to the NANC March 20, 2001 Chair Pat Caldwell.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
World Class Standards OGF20 OGF-ETSI MoU BoF and ETSI GRID STF 2007 call for expert Introduction to 11th May OGF-ETSI Grid testing workshop and ETSI TC.
SEM11-06 Committee procedures ETSI Seminar © ETSI All rights reserved.
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #49 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(11)0177.
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #55 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)
World Class Standards 1 SCP(11)0001 SCP Plenary #47 January 12-14, 2011 Title*: Update on TC M2M activities (and Smart Metering Mandate) Submitted by:
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #54 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)
TC INT #21 SUMMARY © ETSI All rights reserved.
World Class Standards Recommended Improvements to The ETSI Standards Engineering Process Hans van der Veer Chair OCG-IOP & Steve Randall STF308 OCG#32,
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
ZMQS ZMQS
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
AEMCPAGE Relaunch 1 June 2009.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 3GPP TSGs SA Meeting #49, San Antonio, Texas, USA, September 2010 SP © 3GPP Organizational Partners Satisfaction survey results In.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC-16 Closing Plenary Summary Report Jim MacFie, Chair Ed Juskevicius, Rapporteur Document No: GSC16-CL-39r1.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Location Services Overview Larry A. Young Chairman, OMA Location Working Group SDO Emergency Services Coordination Workshop 5 th and 6 th October, 2006.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
PSSA Preparation.
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Fourth Quarter Oklahoma Data (October-December 2011)
Weekly Attendance by Class w/e 6 th September 2013.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
TC SCP REQ STATUS REPORT TO PLENARY #63 Davide Pratone, Chairman, Telecom Italia SCP(14)
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
Presentation transcript:

ETSI TC SCP WG TEST Status Report to TC SCP Plenary #49 Andreas Bertling, Chairman SCP TEST, COMPRION Christophe Dubois, Vice Chairman SCP TEST, Gemalto SCP(11)0175

Meetings Since Last ETSI TC SCP Plenary No F2F meetings since ETSI SCP#48

General issues (1/3) UICC test specification according to TS 102 221 conformance requirements (SCP(10)0202r1) Work is on-going. First draft test specification will be expected for SCP TEST #18 (30th May – 1st June 2011)! The test specification will be presented during ETSI SCP#41 for information.

General issues (2/3) Test Specification for IP Connectivity (SCP-080245) A draft including all conformance requirements specified in TS 102 483 has been presented during SCP TEST #16 in document SCPTEST(10)0259 Test cases expected soon!

General issues (3/3) Discussion on different test method has been started! Conformance testing Interoperability testing Field testing Document SCPTEST(11)0010 ‘Different test methods !, has been postponed to SCP TEST #18.

Outcome Documents – CRs None

Outcome Documents – WIDs SCP(11)0176 - Secure Channel

Outcome Documents – TSs None

Outcome Documents – LSs None

Outcome Documents – Question for advice None

Next Steps / Milestones Verification of TS 102 230 for test cases verifying the interaction between TS 102 221 and TS 102 600 interface. Create draft of test specification to cover UICC conformance requirement specified in ETSI TS 102 221 Setup of Draft WI for the contactless API Maintenance of test specifications under ETSI TC SCP WG TEST responsibility

AOB Discussions on potential UICC certification at GCF (I) During GCF SG# 46 in Singapore (23 – 24 March 2011) the Global Certification Forum Steering Group (GCF SG) agreed to create an Ad Hoc Group to investigate the possible inclusion of UICC certification into the GCF Certification Scheme. The first meeting of this Ad Hoc Group (GCF UICC Ad hoc#01) took place in Düsseldorf, Germany on the 4th of May 2011, hosted by Vodafone. During the meeting an overview of ETSI TC SCP work in the area of test specifications has been given.

AOB Discussions on potential UICC certification at GCF (II) One key message of GCF UICC Ad hoc#01 is: Interested committees (SIMalliance, ETSI SCP, GSMA SCAG, 3GPP, 3GPP2 etc.) and individual companies (UICC and chipset vendor ) should be informed about this discussion started in GCF to Provide feedback about similar activities/discussions in other committees (if any) Actively contribute to the discussion in GCF. Companies or organisations who are not GCF members may be invited to participate in the discussion as guests of GCF. A status of the discussions at GCF UICC Ad hoc#01 will be provided to GCF SG#47 (14–16 June, 2011, Malta). GCF UICC Ad hoc#01 agreed to send some first informal information to ETSI TC SCP via this channel.

AOB Status of CR implementation SCP TEST CRs agreed during Plenary #48 (held first week of March) are not yet implemented in the corresponding specifications or at least, the corresponding specifications are still not published. This makes it quite difficult to prepare CRs for the coming meeting. It would be nice to get a release schedule for the specifications.

Meeting Schedule ETSI TC SCP WG TEST SCP TEST #18 30 May – 01 June 2011 Madrid, Spain Hosted by Valid SCP TEST #19 27 - 29 September 2011 TBD