World Class Standards TC SCP TEC Status Report to TC SCP Plenary #55 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)000095.

Slides:



Advertisements
Similar presentations
SARQA/DKG Conference 3-4 October SARQA/DKG Conference 3-4 OCTOBER 2002 Annex 13 Update An Industry Perspective Michael J Cooke Director, Global.
Advertisements

Slide 1 FastFacts Feature Presentation October 15, 2013 To dial in, use this phone number and participant code… Phone number: Participant.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Business Practices Subcommittee Update October 23, 2012 DRAFT.
Business Practices Subcommittee Update October 26, 2010.
Business Practices Subcommittee Update April 30, 2012.
NANPA Oversight Working Group Status Report to the NANC November 27, 2001 Chair Pat Caldwell.
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #49 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(11)0177.
World Class Standards 1 SCP(11)0001 SCP Plenary #47 January 12-14, 2011 Title*: Update on TC M2M activities (and Smart Metering Mandate) Submitted by:
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #54 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)
ETSI TC SCP WG TEST Status Report to TC SCP Plenary #49
World Class Standards Recommended Improvements to The ETSI Standards Engineering Process Hans van der Veer Chair OCG-IOP & Steve Randall STF308 OCG#32,
GSMP Local Community Network Enhanced Process Meeting Sept. 13, 2007.
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
1 ABCs of PKI TAG Presentation 18 th May 2004 Paul Butler.
Foreign Air Operator Validation & Surveillance
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
1 1  1 =.
Blanket Purchase Orders Training Presentation for Supply Chain Platform: BAE Systems July 2012.
Course Objectives After completing this course, you should be able to:
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
8 th Global Conference on Health Promotion June 2013 Helsinki.
Port Authority Update March 15, 2012 Ryan Wolfe Director of Campus Services.
Management Plans: A Roadmap to Successful Implementation
1 Service Level Agreement Service Level Agreement Based on Lines of Business Payroll Processing EmpowHR Pay Tech DPRS CLER.
Page 1 of 30 To the Create Assignment Request Online Training Course An assignment request is created by an assignor to initiate the electronic assignment.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Multiplication Tables Test 3 and 5 Times Tables 3 and 5 times tables There are 10 questions. Each one will stay on the screen for 15 seconds. Write down.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
Registered Nurse Education Programs Capitation & Special Programs Funding Webinar Presented by: Barbara Zendejas, Melissa Omand and Manuela Lachica,
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 3GPP TSGs SA Meeting #49, San Antonio, Texas, USA, September 2010 SP © 3GPP Organizational Partners Satisfaction survey results In.
Membership Survey Results Spray Beach Yacht Club General Membership Meeting June 30, 2012.
Senior Manager – Research Finance & Programmes
StudentsAchieve Admin Council April 27, Today’s Topics Review process – John 1. Academic Code Tables 2. PSD Rubric 3. Focus Area Weightings 4. Mark.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
GEtServices Services Training For Suppliers Requests/Proposals.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
3GPP TSG GERAN OUTCOME OF GERAN WG4#8 Radio Aspects 5-7, February Rome, Italy.
1 4CB Status report T2S Advisory Group 19&20 November 2013.
Addition 1’s to 20.
Januar MDMDFSSMDMDFSSS
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
Revision of WIPO Standard ST.14 Committee on WIPO Standards, third session Geneva 15 – 19 April 2013 Anna Graschenkova Standards Section.
SMG10 report to SMG#30 Tdoc SMG P
1 APCD Analytical Workgroup April 30,
Slide 1 One world. One name. Anritsu T Chairman’s Report for TSG-T1 SIG SWG T Dan Fox.
TC SCP REQ STATUS REPORT TO PLENARY #63 Davide Pratone, Chairman, Telecom Italia SCP(14)
PRESENTATION OF ETSI © ETSI All rights reserved Sophia Antipolis, 22 May 2014 Luis Jorge Romero Director General, ETSI.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Department of Commerce Bureau of Industry and Security “EAR Regulatory Update” Arlington, Virginia June 10, 2008 Timothy Mooney Export.
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
October 9, 2012 Commercial Operations Subcommittee RMS Update Kathy Scott RMS Vice Chair.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
CT WG6 status report to TSG CT #75
SA WG6 status report to TSG SA#77
July 2010 doc.: IEEE /0xxxr0 A summary of draft LS from 3GPP in response to IEEE 802 LS in March May 2017 Authors: Name Company Phone.
July 2010 doc.: IEEE /0xxxr0 A summary of draft LS from 3GPP in response to IEEE 802 LS in March May 2017 Authors: Name Company Phone.
Presentation transcript:

World Class Standards TC SCP TEC Status Report to TC SCP Plenary #55 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)000095

World Class Standards 2 Meetings Since Last TC SCP Plenary SCP TEC # April 2012 Sophia Antipolis, France, hosted by ETSI SCP TEC #43 bis 15 May 2012 Conference call / GoToMeeting

World Class Standards 3 Discussions, hot topics (1/3) General issues, meeting schedule An additional meeting on API was scheduled during TEC # June in Meudon, hosted by Gemalto Focussed on Contactless and API (parallel sessions) Dedicated time slots allocated to hot topics so that experts can organize their schedule, at this meeting, this time only 4FF TEC workload is currently not too heavy and (depending on the availability of new requirements), the meetings can be shorten a bit

World Class Standards 4 Discussions, hot topics (2/3) Contactless related topics SCP TEST requested some clarifications SCP TEC considered them and in some cases need some more time to address the issues A new version of the proposal related to P2P was presented and discussed, the WID roadmap remains valid at this stage Global Platform related topics SCP TEC considered a CR proposal on TS for Alignment of SCP80 OTA command processing with GlobalPlatform Card Specification Some companies have concerns as there were implementations on the field that would be pushed out of standard if this CR is accepted Issue postponed to the next meeting

World Class Standards 5 Discussions, hot topics (3/3) 4 th Form Factor The RIM/Nokia proposal has been updated in order to try and reach a compromise The proposed CR has been revised several times during the meeting to address the comments raised by smart card manufacturers Additional time was given to participants to check the feasibility of the compromise proposal; a bis meeting (conference call) was scheduled Main objections at the end of the meeting were From SC manufacturers: due to tolerances, position of the notch and contacts placed on top of the chip, the proposal would imply changes in the production line, i.e. impact on the cost and time to market From some Operators: time to market is not favorable to this proposal, although nobody has been able to provide a date for the expected implementation in terminals nor expected delay due to the change in the manufacturing process

World Class Standards 6 Request for advice 4 th Form Factor No agreement could be reached on a compromise even though proposal was reviewed and revised during the meeting SCP Plenary is requested to give guidance regarding the way forward, between the seek for compromise and the ongoing e-vote process

World Class Standards Outcome Documents – CRs List of TEC accepted CRs available in SCP(12) Change Requests 2 CRs to TS CR to TS CR to TS CRs to TS Statistics: 6 CRs Releases: 1 on Rel-8 1 on Rel-9 4 on Rel-11 Categories 1 Cat A 1 Cat B 2 Cat C 2 Cat F 7

World Class Standards 8 Outcome Documents – WIDs No input

World Class Standards 9 Outcome Documents – TSs No input

World Class Standards 10 Outcome Documents – LSs LS directed to SCP None LS copied to SCP Response to LS from SCP TEST - Clarification on SWP terminal requirement in ETSI TS (SCPTEC(12)000066)

World Class Standards Next Steps / Milestones Rel-11 (dates to be assessed in some cases): Encapsulated CAT (?) CAT over AT Security part Contactless P2P Secure Channel API (especially while M2M considered to adopt this concept from SCP) 4FF Other topics RFID support eUICC M2M 11

World Class Standards Meeting Schedule TC SCP TEC SCP TEC ad hoc #115 on Contactless and API June 2012 Meudon, France SCP TEC # September 2012 Sophia-Antipolis, France SCP TEC # November 2012 Sophia-Antipolis, France (TBC) 12