+ CE 3372 Water Systems Design Lecture 002: History of Water Systems; Land Development Vocabulary.

Slides:



Advertisements
Similar presentations
Proposed Des Moines Airport Authority Council Workshop – October 25, 2010.
Advertisements

Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Legal Descriptions and Site Plan Requirements
1. 2 Municipal Management Districts (MMD) are special districts that are: Self governed, but must be approved by the host municipality; and have the.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
BOARD OF COUNTY COMMISSIONERS DECEMBER 11, 2012 CELEBRATION POINTE COMMUNITY DEVELOPMENT DISTRICTS.
Land Subdivision and Zoning Unit: Owning Property Lesson: Land Subdivision and Zoning.
CE 3372 Water Systems Design Lecture 1. Outline Introduction(s) Syllabus History of Water Systems Design Principles.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
+ Proposed Lockwood Targeted Economic Development District 2015 Yellowstone County.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
Circular A-110 Everything You Didn’t Want to Know.
46 2. Describing and Mapping Land In this module, we will discuss: Three means of describing real estate Types of maps available to land-use professionals.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
1 Flood Insurance. 2 Flood - History History of the Law –National Flood Insurance Act of 1968 Federally subsidized insurance became available Voluntary.
Using Digital Flood Hazard Data in the National Flood Insurance Program FGDC Coordination Working Group Scott McAfee Paul Rooney April 5 th, 2005.
© 2008 Dearborn Real Estate Education CHAPTER 4 HOW TO READ TITLE WORK LIKE A PROFESSIONAL.
Real Estate Taxes and Other Liens LEARNING OBJECTIVES: Define the term lien and give examples of the following types of liens: voluntary, involuntary,
Municipal Tax Increment Financing
+ CE 3372 Water Systems Design Lecture Outline Development Vocabulary Municipal Utility Districts/ Bonds Design Guidelines Cost Estimation/Bids.
Statewide Community Infrastructure Program “SCIP”.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Intergovernmental Relations Presented By: J. Greg Hudson THOMAS, HUDSON & NELSON L.L.P. 114 West 7 th, Suite 900 Austin, Texas (512) Presented.
PUBLIC WORKS ORGANIZATION (S) by John Lisenko Definition: A public works organization is any organized system set up for the purpose of managing the physical.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Introduction to Public Hospital Districts April 25, 2002 Association of Washington Public Hospital Districts.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Agribusiness Library LESSON L060057: PROPERTY TAXES.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
IRSDA Conference What Do the Amendments to Indiana Code Section Mean to You? Kristina Kern Wheeler, General Counsel Ja-Deen L. Johnson, Consumer.
Budget Committee Workshop February16, Oregon’s local budget law is a group of statutes that require local governments to prepare and adopt annual.
PROPERTY INSPECTION AND ANALYSIS: THE SITE Chapter 6.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
County and City Government in Georgia March 17, 2014.
Presentation to the Placer LAFCO Commission September 10, 2014.
1 Riverwood Community Governance Forum March 7, 2011 Cal Teague Riverwood C.D.D. District Manager.
Proposed Modifications to the Gated Community Ordinance Board of County Commissioners April 8, 2008.
CE 3372 Water Systems Design Module 002 – Brief History of Water and Wastewater Needs.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
County and City Government in Georgia
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 10 July 2012 Lesson 2.
Leadership Training Unit 6: Navigation. 2  Shhh, don’t use that word!  I can’t do it.  I don’t know how to.  Other people do that.  It’s too hard,
HYDROLOGIC DATA. BACKGROUND Analysis and synthesis of data is required to perform any hydrologic computation. The engineer needs to: Identify and define.
©2011 Cengage Learning. Chapter 15 ©2011 Cengage Learning REQUIRED GOVERNMENT REPORTS.
County and City Government in Georgia
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Real Estate Investment Chapter 2 Land Use Controls © 2011 Cengage Learning.
Private Sector  Buildings and structures built for ordinary people.
Intro to Business, 7e © 2009 South-Western, Cengage Learning SLIDE1 CHAPTER Social Responsibility Government Protection Activities 4-3.
Regional Planning CCRPC Board Training March 21, 2012.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Mountain Regional Water Rules & Regulations Overview.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
ANNEXATION Statutory Overview July 19, 2011 David L. Yearout, AICP, CFM.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Lake Ashton and Lake Ashton II Community Development Districts CDD ORIENTATION CLASS February 28, 2011.
 Overview of Project  Economic Development Tools  Municipal Management Districts  Tax Increment Reinvestment Zones  Session Review, Q&A.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
SPECIAL DISTRICTS AVIK BONNERJEE, R.T.A. TOMMY LEE, R.T.A.
Process Economics Factors that affect profitability
Flood Damage Prevention Code Update
GOVT 2306, Module 11 Special Districts.
Common Surveys Used For Commercial Real Estate Transactions
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Presented by: Deborah Early Icenogle Seaver Pogue, P.C.
Financing Land Development Projects
Local Government Chapter 24
Presentation transcript:

+ CE 3372 Water Systems Design Lecture 002: History of Water Systems; Land Development Vocabulary

+ Outline A Brief History of Water Systems Development Vocabulary Municipal Utility Districts/ Bonds Design Guidelines Cost Estimation/Bids Basics to Land Development Process

+ Water Control Systems Spatial and temporal distribution of surface runoff from rainfall events (drainage engineering) Flood control Storm water harvesting Capacity is based on AREA served hydrology dominated designs

+ Water Use Systems Spatial and temporal distribution in support of human habitation Water supply/treatment/distribution Waste water collection/treatment/discharge Capacity is based on POPULATION served hydraulic dominated designs

+ Environmental Restoration Systems Systems to manage spatial and temporal distribution in support of non-human habitation Create “desirable” conditions “Desirable” <= Policy <= Value Judgment

+ Brief History of Water Systems This brief history is adapted from “Historical Urban Water Systems” by Dr. Robert Pitt, Department of Civil and Environmental Engineering, University of Alabama, Tuscaloosa, AL As we proceed through the history, consider whether the picture is a water control, water use, or environmental restoration system.

+ Brief History of Water Systems Drinking Water

+ Brief History of Water Systems Storm Water

+ Brief History of Water Systems Waste Water

+ Brief History of Water Systems Conduits

+ Brief History of Water Systems Pumps

+ Brief History of Water Systems Storage

+ VOCABULARY!!!!

+ Easement – An easement is a permanent right authorizing a person or party to use the land or property of another for a particular purpose. Right of Way (ROW) – Is the actual land area acquired for a specific purpose. Can be acquired by grants/long usage agreements. Most common for roads/paths. (example on board). Landowners paid a one-time payment based on fair market value for easement rights. Landowners continue to pay property tax on ROW. Utility Easement - Acquires certain rights to build and maintain power lines. Almost everyone’s backyard has a Utility Easement. Easements

+ Lots and Plats A lot is a tract or parcel of land owned or meant to be owned by some owner. Plat – Is a scaled map that shows the divisions of a piece of land. Done when landowner wants to divide land into smaller parcels (homes/apts/etc.) Designates roads/ROW Dedicates land for public uses Ensures compliance with zoning Done through Surveying – Metes and Bounds After plat is filed, reviewed and approved, legal descriptions can refer to block and lot-numbers.

+ Plat

+ Metes and Bounds Is a method for describing the lines which bound a parcel of real estate. Begins at a known landmark for a place of beginning (POB), then follows a line according to the compass-needle, and traces the boundary returning to POB Metes refers to a boundary defined by the measurement of each straight run, specified by a distance between the terminal points, with an orientation or direction. Bounds refers to a more general boundary Condition

+ Metes and Bounds

+ Topo and Key Maps Topographic map – is a type of map characterized by detailed, accurate graphic representations of features that appear on the Earth's surface showing quantitative representation of relief, using contour lines. Features include: cultural: roads, buildings, urban development, railways, airports, names of places and geographic features, administrative boundaries, state and international borders, reserves hydrography: lakes, rivers, streams, swamps, coastal flats relief: mountains, valleys, slopes, depressions vegetation: wooded/cleared areas, vineyards and orchards. Key Map – “Houston’s official atlas” Helps clarify project location

+ FEMA, FIRM, BFE FEMA – Federal Emergency Management Agency Under Department of Homeland Security Main focus is to coordinate response to a major disaster FIRM – Flood Insurance Rate Map The official map of a community on which FEMA has delineated both the special hazard areas and the risk premium zones applicable to the community. BFE – Base Flood Elevation Is the regulatory requirement for the elevation or floodproofing of structures. The relationship between the BFE and a structure's elevation determines the flood insurance premium.

+ MUDS and BONDS!

+ Municipal Utility Districts (Texas) MUD - Municipal Utility District (MUD) Is a political subdivision of the State of Texas authorized by the Texas Commission of Environmental Quality (TCEQ) to provide water, sewage, drainage and other services within the MUD boundaries. MUDs have authority to levy taxes within the MUD boundaries (and can even tax residents who do not receive any services)

+ How to Create a MUD (1) A majority of property owners in the proposed district petitions the Texas Commission of Environmental Quality to create a MUD. The TCEQ evaluates the petition, holds a public hearing, and grants or denies the petition. After approval, the TCEQ appoints five temporary members to the MUD's Board of Directors, until an election is called to elect permanent Board members, to confirm the MUD's creation, and to authorize bonds and taxing authority for bond repayment.

+ How to Create a MUD (2) Developers petition the Texas Commission of Environmental Quality to create a MUD. Developers are prohibited from serving or placing employees, business associates, or family members on the MUD Board of Directors. Developers must pay for or put up a letter of credit equal to 30% of the cost of subdivision utilities. This requirement ensures against "fly-by-night operators" who are not committed to the success of the MUD. The "30% rule" also offers protection to MUD residents in the event that a subdivision is not built according to schedule.

+ How to Create a MUD (2) After approval, the TCEQ appoints five temporary members to the MUD's Board of Directors, until an election is called to elect permanent Board members, to confirm the MUD's creation, and to authorize bonds and taxing authority for bond repayment. Unless they are voting residents within a MUD, developers have no authority or control over the MUD's Board of Directors. This “way of making MUD” is by far the most common in Texas. Developer creates the MUD, sells properties in the district, then when build out is complete, leaves MUD behind for the residents to operate.

+ MUD operations The publically elected Board of Directors manages and controls all of the affairs of the MUD subject to the continuing supervision of the Texas Commission of Environmental Quality. The Board establishes policies in the interest of its residents and utility customers. A MUD may adopt and enforce all necessary charges, fees and taxes in order to provide district facilities and services.

+ MUD operations If a MUD sells bonds (borrows money), those are repaid by charges, fees, and taxes. MUD tax rates, like all property tax rates, vary according to property values and debt requirements. MUD rates generally decline over time as the MUD is built out and operating and debt service costs are shared by more homeowners.

+ Bonds A municipal bond is a bond issued by a local government, or their agencies. Municipal bonds are securities that are issued for the purpose of financing the infrastructure needs of the issuing municipality. These needs vary greatly but can include schools, streets and highways, bridges, hospitals, public housing, sewer, water systems, power utilities, and various public projects.

+ Bonds Municipal bond holders may purchase bonds either directly from the issuer at the time of issuance (on the primary market), or from other bond holders at some time after issuance (on the secondary market). In exchange for an upfront investment of capital, the bond holder receives payments over time composed of interest on the invested principal, and a return of the invested principal itself (see bond).

+ Design Guidelines!

+ Design Design is the management of constraints Non-negotiable constraints are dictated by laws of physics, chemistry (and to some extent mankind). Negotiable constraints are the design variables that can be adjusted to satisfy the non-negotiable constraints. Negotiable Money Time Aesthetics (Pipe Alignment/Channel geometry) Performance Non-negotiable Physics (Water flows downhill, unless power & money are applied) Chemistry

+ Frequency Based Design Design to accommodate an event of some pre-determined probability (return frequency). Assume that more frequent events are also accommodated. You did frequency analysis in hydrology! T-year event

+ Risk Based Design Design to accommodate some pre-determined expected net loss. Expected loss is product of the probability of failure and the cost of that failure. Design to minimize the sum of initial cost and expected loss You did elements of risk analysis in hydrology, namely the probability portion.

+ Critical-Event Design Design to accommodate largest anticipated event. Applied for systems where consequences of failure are huge (economically and/or politically) Large dams, nuclear power plants Assumes the event is anticipated Earthquake + Tsunami + Pump Failure combined were not anticipated (actually they were, just no-one paid attention!)

+ Design Manuals Where do we get the guidance documents? Texas Administrative Code Part 1, Chapters 30 and 31 cover nearly all of what we might do as municipal water engineers Large diameter pipelines like the Lake Allen Henry to Lubbock are outside the scope of the code and are governed by broader guidance – these kinds of projects are uncommon and likely closely follow the intent of the TAC as appropriate.

+ Design Manuals Where do we get the guidance documents? Flood Control Districts

+ Design Manuals Where do we get the guidance documents? Local Jurisdictions

+ Design Manuals Where do we get the guidance documents? Professional Organizations Not everything is free – this MOP would be vital to a practicing engineer, but he/she would have to pay for it

+ Design Manuals Where do we get the guidance documents? Professional Publications – Often these publications are eventually integrated into jurisdictional design manuals. – The example shown is the source of minimum sewer velocity criteria in the USA

+ Design Manuals Where do we get the guidance documents? Vendor/Trade Organization Publications

+ Resources Design uses hydrologic and geologic data and various analysis tools USGS: topography, streamflow, computer programs NRCS: soil maps, land use, computer programs US EPA: rules, chemical properties, computer programs NCDC: rainfall, snowfall, solar radiation USBR: Western US water and energy supply USACOE: Navigable waterways, computer programs FHWA: design manuals, computer programs

+ Resources TWDB: Funding (for cities and water districts) TCEQ: Rules, guidelines, some data TNRIS: Evaporation estimates, digital elevation models, digital ortho-quadrant maps, false IR images, etc. TxDOT: Design manuals, some data, computer programs County: Rules, design manuals, some operate rainfall-stage networks Cities: Rules, design manuals

+ Resources Various analysis tools Google FEMA River authorities Drainage districts Flood control districts Irrigation districts Council of Governments (COGs)

+ Data Most data are NOT free Agencies charge a fee for data, usually pretty small. NCDC is worst offender of taking the fee, then providing the wrong data, so be sure you know what you want. A lot of useful data are currently free, but don’t get offended if in the future you expected to pay for it.

+ Cost Estimation

+ Cost Estimating Is the approximation of the cost of a program, project, or operation, estimated by the engineer. Includes: Planning and feasibility studies Engineering services (Design/Meetings/Reports etc.) Surveying Construction, including materials, equipment, and labor Field inspection To manage liability: Some firms avoid “estimate” and use “Opinion of Probable Cost” Recommend adding “Preliminary” to all estimates before final cost A contingency is usually included in an estimate to provide for unknown costs which are indicated as likely to occur by experience, but are not identifiable. Cost Estimate also pre-determines how much time and money you, the engineer, need to “finish” the project.

+ Cost Estimation A cost estimate is usually prepared to submit a bid or tender to compete for a contract award. How to build a cost estimate? Practice and research! (Previous awarded bids, manufacturers) We will give y’all a go by for the projects NOTE* Preliminary cost estimates are usually rounded to the nearest thousand. Gives developers a basic number. Final cost estimates for bids are exact and to the tee.

+ Bids What is a Bid? – A bid is an offer. Engineers design and produce bid documents (lawyer jargon), including construction drawings and technical specifications, more commonly called “bid and specs” Engineering firms are required to place an advertisement in the local paper two weeks before bid day Upon receiving info, general contractors (if interested) will bid to construct the project. Bidding Facts: Bidding can be open or closed (selected contractors). All bids must be turned in by time selected. Bids are opened with contractors in the selected room by a PE only AFTER selected time. Bids MUST be read aloud. Required Documentation and any discrepancy must be noted. Usually lowest bid is chosen or contractor based on history/preference Developer has the right to refuse all bids.

+ Basics to Land Development Process

+ Land Development Process Developer Engineering Firm Feasibility Analysis Preliminary Design/Report Final Design/Report Advertise Bid Construction