Regulatory Information Management System in support of the Mackenzie Gas Project February 3, 2010.

Slides:



Advertisements
Similar presentations
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Advertisements

Violet Camsell-Blondin Chair, Wekèezhìi Land and Water Board Zabey Nevitt Executive Director, Wekèezhìi Land and Water Board Aboriginal Consultation for.
Rebuild Massachusetts and PHEEP Energy Information Services Project Presentation to DCAM, EOEA, HUD January 4, 2006.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Iowa Code and Rules Easy Navigation and Search Scope Analysis &Planning Phases Completed Request for Execution Funding.
Workflow Basics Tommy Parker Sr. Systems Analyst & Team Leader Mississippi State University 1 MBUG – September 17, 2012.
Mark Cliffe-Phillips Chairperson Update to the MVLWB- Working Group 4- Terms and Conditions –Yellowknife Dec 11, 2008.
AFISS Prospectus of Services AFISS offers HACCP food safety and food quality systems development and management services including preparation for regulatory.
Online Postgraduate Admissions Project Kate Ward – Project Manager.
Supplier Ethics: Program Checklist
MVLWB’s vision for itself is to be A forum for regional decision making, ensuring effective participation of residents in the use, protection.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
April 6, 2009 Ted Lesher - NexPrise, Inc..  Introduction/NexPrise Background  What is Software as a Service and how can it benefit my school?  Data.
Release & Deployment ITIL Version 3
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
Electronic Permitting Initiative Update Alan Doniger, Energistics CTO 2 nd Annual Standards Summit & Reception 6 November 2007 Houston, Texas.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application EE Potential Summary Study Overview CALMAC Meeting.
Systems Analysis and Design: The Big Picture
United States Army Freedom of Information Act (Freedom of Information Act Managerial Training)
NCSA Project Management Committee Meeting Yasmine Abdel Aziz Deputy Project Director 21 st January, 2006.
INFO425: Systems Design INFORMATION X Finalizing Scope (functions/level of automation)  Finalizing scope in terms of functions and level of.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Ohio DOT’s Online CE System Presented by Kevin E. Davis Environmental Supervisor Office of Environmental Services.
Michigan’s E-Grants Project Presented by: C. Douglass Couto Agency Services Information Officer Department of Information.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
IANA Department Activities, RIPE 66, Dublin, Ireland May 2013 Elise Gerich.
FORMAL CONSULTATION ON CHILDREN’S SERVICE BUDGET 2012/13.
The California Health Benefit Exchange: Design Options HBEX Board Meeting Tuesday, September 27, 2011.
Migrating Library Systems Migrating Data Dianne Schaefer Social Law Library American Association of Law Libraries Minneapolis, Minnesota July 15, 2001.
Working Group 5 Data Sharing and Standards Update for Full Board Meeting September 9-10, 2009.
Disclosure of Preliminary Screening Staff package provided to MVEIRB prior to Board meeting MVEIRB informed of Board decision Decision issued three (working)
D1.HGE.CL7.01 D1.HGA.CL6.08 Slide 1. Introduction Design, prepare and present reports  Classroom schedule  Trainer contact details  Assessments  Resources:
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
Montserrat -.MS Presentation Given at: ccTLD Workshop Feburary Georgtown, Guyana Montserrat is a British Overseas Territory located in the Eastern.
CIP Quality System for Genebank ISO 17025
Mackenzie Valley Standard Procedures & Consistency Working Groups Plan Review Process and Guidelines (PRPG working group)
The County of Fresno eContracts System Tracking your contracts is just a few clicks away!
Doing Things Right: Implementing and Improving Co-Management in the NWT Willard Hagen Chair, Mackenzie Valley Land and Water Board Inuvik Petroleum Show.
The Impact of Evolving IT Security Concerns On Cornell Information Technology Policy.
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
ISO Environmental Management Systems 1 ISO LEGAL AND OTHER REQUIREMENTS.
Draft Needs Assessment Identifying the Spatial Location of Land Use Permit & Water License Applications in the NWT Colin Daniel & Philip Bailey.
SWIS Digital Inspections Project Chris Allen, Information Management Branch California Integrated Waste Management Board August 22, 2008.
Implementation: Results from the Using Your Regional ITS Architecture Peer Exchange Network Workshop Mac Lister FHWA Resource Center ITS America Annual.
Smart Schools Bond Act Investment Plan Submission Information and Review Process Presentation to Regional Partners Hosted By: Capital Region BOCES October.
Effectively Integrating Information Technology (IT) Security into the Acquisition Process A course for the Department of Commerce contracting and contracting.
Drinking Water Source Protection Ministry of the Environment Source Protection Programs Branch March 2010.
Group Members Rob Dobson MVLWB Mark Cliffe-PhillipsWLWB Tyree MullaneyMVLWB Leonard DeBastienGLWB Ryan FequetWLWB Rhianna LeightonSLWB Jenna GrandjambeSLWB.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
DEVELOPING THE WORK PLAN
1 Application Process Gwich’in Land & Water Board WG 6 Document Review Prepared by Johnny Edwards.
WG5 – Data Sharing and Standards Full Board Meeting December,
TOWARDS A COMMON GOAL Coordinating actions under the Clean Water Act (FWPCA) and the Endangered Species Act (ESA)
National Interoperability Information eXchange – – National Public Safety Telecommunications.
Indian & Northern Affairs Canada March 10, 2010 On-Site Water and Wastewater Systems - First Nations Water Symposium Matthew Hough, P.Eng. Infrastructure.
Accurate  Consistent  Compliant Contact: i4i the structured content company the structured content company.
Developing National Capability for Integrated Border Management (IBM) in Lebanon IBM Equipment Handover & Visibility Event.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
CAPITAL FACILITIES PROGRAM UPDATE BOARD OF EDUCATION FEBRUARY 8, 2016 FACILITIES SERVE EDUCATION.
Public Purchasing in Florida MyFloridaMarketPlace Brief September 16, 2005.
Working Group 5 Data Standards and Sharing. WG5 Data Standards and Sharing To develop and promote clear and consistent standards, guidelines and procedures.
Interagency Coordination in Long Range Transportation Planning
Lecture 9 - Business Information Systems: Electronic Business Systems
Feasibility Analysis for Multi-Agency Fire Services provided through a Joint Powers Authority and Related Ambulance Study.
Enterprise Content Management Owners Representative Contract Approval
Business Case Development Key Components :
New Mexico Department of Health Immunization Program
Hiring for Youth Programs
Centralization of Texas State Contract Compliance Functions
Section 3 FOR HUD USE ONLY.
Presentation transcript:

Regulatory Information Management System in support of the Mackenzie Gas Project February 3, 2010

Background Agreement for Coordination of the Regulatory Review of the Mackenzie Gas Project

Background cont’d Process Mapping Exercise ◦2yr exercise to formalize and standardize process maps for 70? anticipated MGP regulatory approval types ◦MVLWB LUP and WL application process maps were approved by full Board MVLWB Pilot Project  $120,000 INAC funding to develop pilot system for processing of MVLWB LUP and WL applications, as our electronic systems were among the most complete (Terriplan Consultants as contractor)  $45k additional funding mostly used  Rob expects $50k more required for polished product  NWT Water Board  Leveraged investments made in MVLWB pilot program, customized to their own needs  Actively testing  WLWB – Online Commenting component  Leveraged investments in MV and NWTWB systems to customize an Online Commenting component (Live Comment Summary Table)  Testing mock live reviews  Providing input / testing into additional components along with MVLWB

Background cont’d Conceived as a one-window online regulatory information management system housed by NGPS for all MGP-related authorizations This main goal has been mainly abandoned in favor of standalone systems customized to the specific procedural requirements of each organization.

Key Features of Final MVLWB Project Online Application forms (LUP and WL) Upload of supporting documents Tracks application through process map Automated notifications Contact / Distribution List management User management / security Online reviews (live comment summary table) MVLWB registry integration (loose)

MVLWB Design Considerations Integrate with MVLWB work processes Integrate with MVLWB online registry Extendable outside of MGP context and outside of application process only ◦( post approval processes ) Integrate with other agencies (may not be feasible given standalone nature of systems)

Policy and Procedural Implications

Rob’s Review Polished product is probably $50,000 away Be aware of policy and procedure implications In-house system guarantees continuity post MGP but makes inter-agency coordination an issue Be aware of ongoing support and maintenance costs (system must be maintained by outside contract) System does not offer much new information vs the online registry. What it can offer, if well designed, is important procedural efficiencies and consistencies (in application, distribution and review processes). If poorly designed, we will complicate procedures for staff and outside users. Has been a driver for other MVLWB goals ( distributions, document uploads, live commenting) Potential integration with Water Withdrawals db