Fish in/Fish out Monitoring - exploring funding options DRAFT WRIA 8 Salmon Recovery Council October 18, 2007.

Slides:



Advertisements
Similar presentations
Collaborative, Systemwide Monitoring and Evaluation Program
Advertisements

King Conservation District Grants 2007 Allocation Guidance WRIA 8 Salmon Recovery Council March 15, 2007.
RTT Analysis Workshop Species Status and Trend (Chapter 1) Casey Baldwin RTT Chairperson WDFW Research Scientist.
Salmonid Natural Production Monitoring & Evaluation Project Confederated Tribes of the Umatilla Indian Reservation BPA Project #
Annual Stock Assessment – Coded Wire Tag Program (ODFW & WDFW) BPA Project Numbers: and
Bull Trout Population and Habitat Surveys in the McKenzie and Middle Fork Willamette Presented by: Oregon Department of Fish and Wildlife February 22,
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Project No Tara White, Shannon Jewett, Josh Hanson,
Assessment of A-run Steelhead population in the Clearwater Nez Perce Tribe Department of Fisheries Resources Management.
Chinook Salmon Adult Abundance Monitoring Project Dave Faurot Nez Perce Tribe Pacific Northwest National Laboratory.
A forum for coordinating state, federal, and tribal watershed and salmon monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring.
Monitoring and Evaluation of Yearling Fall Chinook Salmon Released Upstream of Lower Granite Dam Nez Perce Tribe Department of Fisheries Resources Management.
Fluvial Bull Trout Migration and Life History Investigations, Upper Salmon River Subbasin New Project Proposal, No Sponsored by: Shoshone-Bannock.
Lower Snake River Compensation Plan Hatchery Evaluations – Salmon River Project No Nez Perce Tribe Department of Fisheries Resources Management.
Assessment of Bull Trout Populations in the Yakima River Watershed.
Information Needs for the Integrated F&W Program (ESA and Power Act) Jim Geiselman - BPA.
Salmonid Population and Habitat Monitoring in the Lower Columbia/Columbia Estuary Provinces Oregon Department of Fish and Wildlife.
SRFB Round VIII & WRIA 8 Three Year Work Plan WRIA 8 Salmon Recovery Council March 15, 2007.
King Conservation District Grants Allocation Guidance WRIA 8 Salmon Recovery Council March 20, 2008.
WRIA 8 Plan Updates 3-Year Work Plan and 10-Year Start List WRIA 8 Salmon Recovery Council March 18, 2010.
King Conservation District Grants Allocation Guidance WRIA 8 Salmon Recovery Council March 19, 2009.
King Conservation District Grants 2010 Allocation Guidance WRIA 8 Salmon Recovery Council March 18, 2010.
Salmon Recovery Funding Board (SRFB) 2008 & WRIA 8 Three Year Work Plan WRIA 8 Salmon Recovery Council March 20, 2008.
WRIA 8 Fish in/Fish out Monitoring Summary
Comprehensive Management Plan for Puget Sound Chinook Harvest.
1 Briefing for WRIA 8 – Lake Washington/Cedar/Sammamish Watershed July 17, 2008.
Lake Washington General Investigation Julie Hall, Seattle Public Utilities.
An Overview of the 2007 WRIA 8 Implementation Survey Presented to the WRIA 8 Salmon Recovery Council January 17, 2007.
Frank Leonetti, Snohomish County
1 Measuring Progress: Monitoring and Evaluation in WRIA 8 WRIA 8 Salmon Recovery Council November 19, 2009 Scott Stolnack WRIA 8 Technical Coordinator.
WRIA 8 Salmon Recovery Council 2007 SRFB & PSAR Grants Project Subcommittee Report & Recommendations July 19, 2007.
CSMEP Goal: Improve the quality and consistency of fish monitoring data, and the methods used to evaluate these data, to answer key questions relevant.
1 Bonneville 2 nd Powerhouse Corner Collector PIT Tag Detection System Project Bonneville Power Administration and U.S. Army Corps of Engineers – Portland.
Fish and Wildlife Program’s Columbia River Basin High Level Indicators Tracking Progress in the Council Fish and Wildlife Program October 2009 Ketchum,
Spatial and Temporal Distribution of Adult Summer Steelhead in Asotin Creek, Washington Ethan Crawford and Michael Herr Washington Department of Fish &
Coordination of Tag and Mark Recovery Programs Dan Rawding WDFW.
Resident Fish Above Chief Joseph and Grand Coulee Dams Project No Kalispel Tribe of Indians Washington Department of Fish and Wildlife Spokane.
Salmon recovery does not just mean more fish Management decisions are driven by politics & logistics—science can only contribute if we provide technically.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
Strategy Rationale Oregon Recovery Plan Washington Recovery Plan NOAA Monitoring Guidance (includes RPAs) Integrated Status & Trends Monitoring (ISTM)
WRIA 8 Status and Trends Monitoring ( ) Hans B. Berge, Dan Lantz, Scott Stolnack, and Curtis DeGasperi King County Department of Natural Resources.
Monitor and Evaluate Salmonid Production in the Asotin Creek Subbasin - LSRCP (ID #200116)
Washington State Steelhead Status Review PACIFIC COAST STEELHEAD MEETING JON ANDERSON WASHINGTON DEPARTMENT OF FISH & WILDLIFE MARCH 9-11, 2010.
Conservation of Lake Sammamish Kokanee A Briefing for the City of Bellevue Planning Commission David St. John – Lake Sammamish Kokanee Work Group
REGIONAL COORDINATION High Level Indicators Draft “white paper” to recommend a core set indicators that can be shared among all types of monitoring Protocol.
Management & Recovery Implications Of Wild/Hatchery Steelhead Interactions Within A Large, Complex Watershed Research Partners: WDFW Skagit River System.
Estimating integrative effects of the H’s on salmon populations.
The Status of Puget Sound Chinook Salmon What do we know? and How do we know it? Kit Rawson Tulalip Tribes.
Puget Sound Nearshore Partnership Puget Sound Partnership Leadership Council November 10, 2007.
Principal funding: Bonneville Power Administration, NOAA-Fisheries Principal Investigator: Dr. Chris Jordan, NOAA-Fisheries Actual work on the project.
Relationships between resident and anadromous O. mykiss in Cedar River, WA: Anne Marshall WA Dept of Fish and Wildlife improving the chances for steelhead.
03Nov2006 Revision11 Priority Questions of TID/MID/CCSF Regarding Tuolumne River Salmonids & Macroinvertebrates.
Status & Trend Monitoring Data End User Management Questions, Directives, Research & Monitoring Plans and Other Strategies 1.Federal Columbia River Estuary,
October 20 & 21, 2009 Stevenson, WA Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop Lower Columbia Sub-Basin.
Lake Sammamish Kokanee: Bringing Them Back from the Brink A Presentation for the Rotary Club of Issaquah David St. John – Government Relations Administrator.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
Ocean rivers SARs LGR-LGR SARs LGR-LGR Harvest Mouth of Columbia predicted returns Mouth of Columbia predicted returns Juvenile travel time and survival.
What do we have in common? Do more with less! PNAMP Integrated Status & Trend Monitoring Workgroup.
November 3-5, 2009 Stevenson, WA Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop Upper Columbia Sub-Region 2 Listed ESU/DPS Steelhead-
Photo courtesy of Michelle L. McConnell, Consultant Puget Sound Nearshore Ecosystem Restoration Partnership Puget Sound Nearshore Ecosystem Restoration.
Jeff Burkey King County Department of Natural Resources and Parks November 4, 2015.
Hood Canal Steelhead Acoustic Telemetry Studies Barry Berejikian and Skip Tezak NOAA Fisheries Northwest Fisheries Science Center Manchester Research Station.
Update on Lake Sammamish Kokanee Conservation Efforts A Presentation to for the WRIA 8 Salmon Recovery Council David St. John – Lake Sammamish Kokanee.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
Payette MPG Sockeye Adult Tributary Juvenile Data Tributary Data
Watershed Planning in the Pend Oreille River Basin in WA
MPG Spring-Summer Chinook
BPA Expectations for Regionally Coordinated RM&E Programs Jim Geiselman – BPA BPA Expectations on the Development of Standard.
Snake River MPG Fall Chinook Adult Tributary Juvenile Data Tributary
Dave Pflug & Ed Connor Seattle City Light
Presentation transcript:

Fish in/Fish out Monitoring - exploring funding options DRAFT WRIA 8 Salmon Recovery Council October 18, 2007

What Weve Heard Develop alternatives/options for funding fish in and fish out monitoring that is; Develop alternatives/options for funding fish in and fish out monitoring that is; Stable (not in jeopardy) Stable (not in jeopardy) Long-term Long-term Requires less staff/committee effort annually Requires less staff/committee effort annually KCD Board concerns regarding fit to fund KCD Board concerns regarding fit to fund WRIA 8 Project sub-committee feedback WRIA 8 Project sub-committee feedback

What is fish in/fish out monitoring? For our discussion, we are talking about monitoring Cedar River and Sammamish populations, specifically For our discussion, we are talking about monitoring Cedar River and Sammamish populations, specifically Spawner surveys – fish in Spawner surveys – fish in Outmigrant smolt trapping – fish out Outmigrant smolt trapping – fish out Juvenile behavior and survival to Locks – fish out Juvenile behavior and survival to Locks – fish out Does not include many other biological monitoring/studies/sampling that also occurs

Plan Recommends…..Chapter 6 Table Minimum Necessary Table Minimum Necessary Smolt trapping – Cedar and Bear Smolt trapping – Cedar and Bear Juvenile migration survival – to Locks – Cedar, Bear and Issaquah (hatchery) Juvenile migration survival – to Locks – Cedar, Bear and Issaquah (hatchery) Salmon spawner surveys – Cedar, Bear, Cottage and other tributaries Salmon spawner surveys – Cedar, Bear, Cottage and other tributaries

Biological Monitoring for VSP Since 1998, we have monitored; Since 1998, we have monitored; Relative spawner abundance (spawner surveys) Relative spawner abundance (spawner surveys) Redd location and number Redd location and number Fish characteristics (hatchery or natural; size, age, spawning success) – Carcass surveys Fish characteristics (hatchery or natural; size, age, spawning success) – Carcass surveys Juvenile production/survival to smolt traps Juvenile production/survival to smolt traps Juvenile behavior and survival to Locks (PIT tagging) Juvenile behavior and survival to Locks (PIT tagging)

2008 funding Type of Core Monitoring2008 costs 2008 Match 2008 WRIA 8 KCD Smolt Trapping and PIT tagging:Cedar and Bear $214,000$46,100$167,900 Spawner Surveys:Numerous locations $187,564$54,716$132,848 Total $401,000 Total $401,000 KCD funding $300,000 KCD funding $300,000 Match from Seattle Public Utilities, Bellevue, King County, MIT, ACOE and WDFW Match from Seattle Public Utilities, Bellevue, King County, MIT, ACOE and WDFW

Funding support historically Army Corps of Engineers Army Corps of Engineers King Conservation District King Conservation District WDFW WDFW King County (Wastewater and Water and Land) King County (Wastewater and Water and Land) Seattle Public Utilities Seattle Public Utilities City of Bellevue City of Bellevue Muckleshoot Indian Tribe Muckleshoot Indian Tribe WRIA 8 ILA (starting in 2007) WRIA 8 ILA (starting in 2007)

What is funding landscape? Need to identify support from potential existing or future fund sources Need to identify support from potential existing or future fund sources Fund SourceEstablishedFuture WRIA 8 KCDYESYES WRIA 8 ILAYESMaybe Co-ManagersYESYES Jurisdictional match YESYES Puget Sound Partnership, Lead Entity, Capacity Funding, or other State/Fed sources YES, but not specifically for monitoring Maybe Regional Funding SourceNOUnknown Other grants/ MitigationNOUnknown

Alternatives to investigate 1. Status quo – 1. Status quo – KCD project funding with annual Council/KCD allocation and review KCD project funding with annual Council/KCD allocation and review 2. Status quo + streamlined process – 2. Status quo + streamlined process – e.g., allocation and review is set as programmatic effort by Council and KCD Board. e.g., allocation and review is set as programmatic effort by Council and KCD Board. 3. Maximize match to KCD from existing sources – 3. Maximize match to KCD from existing sources – WRIA 8 ILA funding/Jurisdictional/Co-managers WRIA 8 ILA funding/Jurisdictional/Co-managers Backfill ILA staffing with existing and future lead entity grants Backfill ILA staffing with existing and future lead entity grants 4. Develop/lobby for other sources of funding – 4. Develop/lobby for other sources of funding – Puget Sound Partnership?, State (Lead entity or DOE grants), Federal funding through PCSRF?, NEW locally controlled WRIA funding solution Puget Sound Partnership?, State (Lead entity or DOE grants), Federal funding through PCSRF?, NEW locally controlled WRIA funding solution

Other Monitoring Other recommended monitoring 1. habitat status and trends monitoring 2. project effectiveness monitoring 3. watershed monitoring Funding for this work has not been identified may come from local grants, local in-kind match, and State-Fed funding

Next steps?