There are a number of different ways of managing transboundary river systems, and different institutional responses to these challenges.

Slides:



Advertisements
Similar presentations
Guidance Note on Joint Programming
Advertisements

Financing of OAS Activities Sources of cooperation Cooperation modalities Cooperation actors Specific Funds management models and resources mobilization.
EURADWASTE 29 March 2004 LOCAL COMMUNITIES IN NUCLEAR WASTE MANAGEMENT THE COWAM EUROPEAN PROJECT EURADWASTE, 29 March 2004.
Thailand water management policy: Case of the Mekong River Basin
The governance of metadata management in the S-DWH
International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
Role of RAS in the Agricultural Innovation System Rasheed Sulaiman V
Relevance and effectiveness Regional Good Standardization Practice Course July, Bangkok, Thailand Good Standardization Practice 2012.
Sharing Benefits of Transboundary Waters through Cooperation David Grey The World Bank International Conference on Freshwater Bonn, 2001.
An Effective Global Statistical System A Pre-requisite for Consistency in Global Measurement Dennis Trewin, Statistical Consultant.
Integrated Flood Management : the way to Harmonious coexistence with floods Avinash C Tyagi World Meteorological Organisation Geneve, Switzerland A contribution.
The SEEAW in the context of Integrated Water Resource Management Roberto Lenton Chair, Technical Committee Global Water Partnership.
Nuclear Energy in the 21 st Century BEIJING 2009 International Ministerial Conference April 2009.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Survey on Institutional Arrangements for NMHSs.
Critical Role of ICT in Parliament Fulfill legislative, oversight, and representative responsibilities Achieve the goals of transparency, openness, accessibility,
Introduction A GENERAL OVERVIEW OF THE WCD FINDINGS, RECOMMENDATIONS & APPLICATION Alex Muhweezi & Chihenyo Mvoyi IUCN Uganda Country Office.
Sound Management of Chemicals Executive Director’s Overview Commission for Environmental Cooperation Sound Management of Chemicals Working Group and Stakeholders.
Integrated Growth Pillar 1 of the SEE 2020 Strategy SEEIC Meeting Sarajevo, 19 June 2013.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
World Meteorological Organization Working together in weather, climate and water EC WG-CD Terms of Reference and Review of Cg-XVI and EC-LXIII
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Guidance for AONB Partnership Members Welsh Member Training January 26/
EQARF Applying EQARF Framework and Guidelines to the Development and Testing of Eduplan.
Ensuring Food Safety in Europe through Scientific Cooperation and Networking The Role of EFSA Carola Sondermann EFSA Polish Focal Point – Annual Experts.
Adaptation knowledge needs and response under the UNFCCC process Adaptation Knowledge Day V Session 1: Knowledge Gaps Bonn, Germany 09 June 2014 Rojina.
Commissioning Self Analysis and Planning Exercise activity sheets.
Green Paper on National Strategic Planning The Presidency November 2009.
Institutional Arrangements for Adaptation Achala Chandani Researcher International Institute for Environment and Development european capacity building.
Transboundary Water Cooperation & Climate change Some important points.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
Ministry of the Environment and Territory Directorate for Development and Environmental Research Ministry of Economy and Finance Department for Development.
The Multilateral Fund and its Management Structure UNFCCC Workshop on the Adaptation Fund 3-5 May 2006 Alberta, Canada Maria Nolan Chief Officer - Multilateral.
Canada’s Federal Environmental Assessment Regime Presentation to the Forum of Federations Environmental Assessment Conference Ottawa, Canada September.
1 Basin Development Plan BDP : Planning process & tools to identify, categorise & prioritise joint or basin-wide projects and programs VISION : Contribute.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
STAKE HOLDER INVOLVEMENT in Water Resources Management Case Study in Indonesia Dr. Mochammad Amron First of Advisor to Minister of Public Works, Republic.
Overview of the Situation and Challenges for Water Quality Monitoring and Reporting in South Africa Wandile Nomquphu Department of Water Affairs and Forestry.
1 st Workshop on issues and trends arising from the European IRRS missions Findings and Conclusions A.Munuera Brussels, 22 nd and 23 rd January 2014.
Saghit Ibatullin - Chairman of the EC IFAS "Strengthening regional cooperation on water: role of the Executive Committee of the International Fund for.
River Basin Management in Southern Africa Barbara Schreiner.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
1 Voluntary and Community Sector Review Voluntary & Community Sector Review Grants Strategy Working Party Participative Session 28 September 2006 Appendix.
Group Work IWRM Integrated River Basin Management.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
Joint bodies according to the UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes Francesca Bernardini United.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Evaluation of Structural Fund Programmes – the Swedish experience Implementation of the mid term evaluation - lessons for the future Maria Eriksson NUTEK.
-0- June 2006 Roles & Responsibilities vs. STAP Implementation.
WATER SECTOR PLANNING TOOLS Proposals for improving sectoral & inter-sectoral planning.
International Network Of Basin Organizations topic 3.1: “Basin Management and Transboundary Cooperation”. Operational tools  Long term basin management.
(I)WRM indicators A GWP PERSPECTIVE Water Country Briefs Project Diagnostic Workshop, Geneva, December 2010 Mike Muller : GWP-TEC.
Joint basin management institutions as articulation of international water law - a selection of African cases Anton Earle Stockholm International Water.
Challenges of Statistical Capacity Development Statistical, Economic and Social Research and Training Centre for Islamic Countries (SESRIC) V Astana Economic.
Capacity-building from the perspective of the ECE Industrial Accidents Convention Virginia Fusé, UNECE secretariatIspra26/03/2015.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
UNGGIM – PRIVATE SECTOR NETWORK. AGENDA > OVERVIEW OF PRIVATE SECTOR >PURPOSE AND VISION OF PRIVATE SECTOR NETWORK > STRUCTURE AND TERMS OF REFERENCE.
Monitoring Forest Resources for SFM in the UNECE Region
Roles and Functions of Basin & sub-basin organizations
Mackenzie River Basin Board 2016 – 2019 Business Plan
Overview Rationale Context and Linkages Objectives Commitments
The SWA Collaborative Behaviors
The ERA.Net instrument Aims and benefits
« WFD contributions to water management
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Statistics beyond the National Level –Regional Experiences
Overview Rationale Context and Linkages Objectives Commitments
Building Statistical Capacity UNSD perspective
GENERAL PRINCIPLES Equitable and Reasonable Utilization and Participation The parties shall participate in the use, development and protection of the River.
Governance: principles, context and agencies
Presentation transcript:

There are a number of different ways of managing transboundary river systems, and different institutional responses to these challenges.

The costs of participating The costs of not participating are much smaller than 1.The Secretariat. 2.Staff time. 3.Hosting costs. 4.Monitoring / planning and implementation. 5.Lost sovereignty. 1.Increased conflict. 2.Lost opportunities for support (technical / financial). 3.Lost opportunities for benefit sharing. 4.Reduced water security. 5.Lost opportunities for regional integration/optimisation.

Grey et al (2009) indicate that; "Experience suggests, quite simply, that countries cooperate in the management of transboundary waters not when compelled by principles or an 'ethics of cooperation,' but when the net benefits of cooperation are perceived to be greater than the net benefits of non- cooperation, and the distribution of these net benefits is perceived to be fair." Sadoff and Gray (2005) have also suggested that; “A major challenge in each basin is to identify the right type of cooperative effort – one in which the benefits of cooperation outweigh the costs.”

JOINT TECHNICAL COMMITTEES Limited geographical scope, Technical people solving technical problems DEVELOPMENT AUTHORITIES Sometimes limited geographical scope. Infrastructure based – large agencies BASIN WIDE COMMISSIONS Basin wide improved management

The Bilateral Arrangements are inherently strong; -They deliver significant benefits -Have low operating costs, -Have a longer history and existing ‘trust profile’. -Still seem to be the ‘first port of call’ ORASECOM’s benefit is less clearly articulated, and it is getting expensive to participate.

The Delphi process is a systematic, interactive forecasting method which relies on a panel of experts. The value of the process is that it reduces the influence of ‘group think’ and other psychological factors. Its value in the ORASECOM context was that it polled opinion from all the Parties, and moved towards greater consensus or more common positions.

ORASECOM is an evolving organisation, still in its development stage The 2012 planning process should predominantly focus on aligning and coordinating the sub-basin plans. This ensures the reasonable and equitable use by making sure all the expressed water demands can be realised in the medium term. In the longer term a basin wide perspective support shifts away from infrastructure towards more multidisciplinary approaches towards water resources management. The planning process must include water resources quality monitoring and monitoring the implementation of operating rules. There is a water / energy nexus in the basin.

Annual operating plans; Agreed annually, at the start of the hydrological year. Agreement on curtailments and flood responses. Operational planning; Ensures that the current and planned infrastructure is operated to best effect, so that water can be supplied within penalty structures and assurance of supply appropriate to (and established by) each of the Parties. This would draw on existing obligations arising from the sub-basin arrangements as well as the country’s national planning processes. Strategic planning; Securing the medium to long term (10-40 year) water and energy needs of the Member States. The Parties develop, longer-term sustainable development scenarios and options to meet the collective water and energy needs of the Member States. More integrated approach based on the extent of economic dependency.

the Secretariat is largely functioning as originally designed. However the original design did not anticipate the volume of work that would be generated by the ICP supported projects. The following additional positions are recommended based on the role and function of the organisation as a whole;  A communications specialist:  A water quality / water environmental quality monitoring expert:

The Road-map recommended a Two-Tier Participation Process for ORASECOM National level in each Member State Basin level platform across Orange-Senqu Basin

May be done differently in each Member State. Discusses national issues (NAPs) and national development objectives. Funded by the Party.

1-3 Nominations from each Member State. Attendance is funded by Parties approx R 20, ,000/a. Stakeholders act as ‘observers’ but can discuss and participate openly. Attend ORASECOM Programme Committee – perhaps as separate meeting.

Bodies with ‘basin wide’ interests, eg WWF, GWP, WESSA, Benguela Commission are invited to participate. They fund their own participation. Governed by a “Memorandum of Understanding” GWP

Consistent with the recommendations from the Roadmap (in order of importance); Parties should, in their stakeholder interactions, start profiling ORASECOM. National forums should be established in each Member State – funded by the Parties. A basin wide platform should be created made up of representatives from each National Forum – funded by Parties ‘International / Regional’ stakeholders should be invited to participate at their cost and governed by an MoU. This should interact with the ORASECOM Programme Committee and/or working groups.

THANK YOU