ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 Short Information on ITER Design Review and Issue Cards: (an outsider view,

Slides:



Advertisements
Similar presentations
Linear Equation in One Variable
Advertisements

nucleus 1 st shell (max. 2 e - ) 2 nd shell (max. 8 e - ) 3 rd shell (max. 8 e - )
Slide 1 Insert your own content. Slide 2 Insert your own content.
Growing Every Child! The following slides are examples of questions your child will use in the classroom throughout the year. The questions progress from.
Beat the Computer Drill Multiply 7s Becky Afghani, LBUSD Math Curriculum Office, 2004.
Antonella Fresa Vilnius, 4th October 2007 Antonella Fresa Technical Coordinator MinervaEC MInisterial NEtwoRk for Valorising Activities in digitisation,
Doc.: IEEE Submission March 2006 Robert F. HeileSlide st Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE xxx-00 Submission July 2006 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
Report IPP Garching EU Task Force PWI Meeting, Cadarache Oct Max-Planck-Institut für Plasmaphysik compiled by Arne Kallenbach (IPP - EU-PWI.
EFDA during FP7 and the PWI TF J.Pamela EFDA Leader PWI Task Force meeting 13 November 2006.
R.Zagórski, SEWG Meeting, Culham, July New EFDA and PWI Work Programme R.Zagórski EFDA CSU Garching Acknowledgements: J.Pamela, J.Roth, E.Tsitrone.
1. Qualifying carbon as PFC Erosion (see report S. Brezinsek ) along plasma wetted areas, effect of substrate Local C migration to gaps Fuel retention.
1E. Tsitrone PWI TF meeting, 27-29/10/2008, Frascati Euratom International context : ITPA (International Tokamak Physics Activity) Changes in the ITPA.
J. Roth, EU PWI TF, SEWG Fuel Retention, Garching, July 19, 2010 Report on: WP10-PWI /IPP/PS Multi machine scaling of fuel retention for ITER Validation.
Jerome Pamela PWI meeting, 31 October New Horizons for EFDA PWI meeting, October 2007 Jerome Pamela EFDA Leader.
F. Le Guern Dust&Tritium PWI AM Frascati Oct 2008 DUST AND TRITIUM MANAGEMENT.
Max-Planck-Institut für Plasmaphysik
6 th EU PWI TF Meeting Madrid, Oct Tritium Inventory in ITER: Laboratory data and extrapolation from tokamaks Th Loarer, J Roth, S Brezinsek, A.
SEM08-14 SPECIALIST TASK FORCES (STFS) ETSI Seminar SEM08-14.
TRDTF Transmission Reliability Database Task Force Update & Approval Vote Brian Keel SRP
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
Planning and use of funding instruments
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
European Commission Directorate General Economic and Financial Affairs New question on capacity utilisation in services - state of play and way forward.
4QC – Tampere September QC Common Assessment Framework CAF self-assessment eTool.
1 American Community Survey: Update New Jersey State Data Center Meeting June 11, 2008 Nancy Torrieri American Community Survey Office.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
FCMAT Response & Preparation: Process Outline October 25, 2006.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
EXAMPLE 1 Factor when b is negative and c is positive
How does the FAT Procedure work? A Guide to Arbitration Procedures before the FIBA Arbitration Tribunal (FAT)
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Unclassified Performance Management Process For Unclassified Administrative and Professional (Non-Teaching) Employees Summer 2011.
Flashcards? Lets Get Started. Question 1 Get Answer.
Room Scribe Orientation ATE Birds of a Feather Sessions October 2010 FOR AUDIO, PLEASE CALL: Passcode: #
Room Facilitator Orientation ATE Birds of a Feather Sessions October 2010 FOR AUDIO, PLEASE CALL: Passcode: #
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
Objectives The student will be able to:
Objectives The student will be able to:
main idea and supporting details
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
Jeopardy Review VocabularyPrime factorizationMultiplication/ division Final Jeopardy.
Factoring ax2+bx +c ax2+bx +c
1 Task Force (TF) on Inter-Modal Transport Statistics (IMTS) presentation for ETIS+ Seminar 27 May 2011, Brussels Giuliano AMERINI (Eurostat)
25 seconds left…...
God’s Sustaining Grace God’s sustaining grace is giving us what we need when we need it.
Week 1.
Oregon Department of Education 2006 School Health Profiles Report Weighted Lead Health Education Teacher Survey Results *Among those schools that require.
Jeopardy Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
The Victorian Teaching Profession Code of Conduct Group Activity 1.
1 FUTURE STESEG WORK - CURRENT AND NEW PROJECTS - FUTURE STESEG WORK - CURRENT AND NEW PROJECTS - SHORT-TERM ECONOMIC STATISTICS EXPERT GROUP (STESEG)
Learning Outcomes Assessment Learning Outcomes Committee Co-Chairs - David Steer: Stephane Booth:
Steps in the Process Candidate applies to Chair of Dept. APC by Sept 15. [cc the Dean] Dept. APC meet and recommends to SPAT SPAT meets and recommends.
Oct 2004 Jon Edney, Nokia Slide 1 doc.: IEEE /1176r0 Submission AP Function Capture Call for input Jon Edney, Nokia.
Read “Failure Is Always An Option,” a short essay by civil engineer Henry Petroski. Draft and revise your own essay on a structural failure (buildings,
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Guidance document for national employment flash estimates
#1 #2 #3 Solve: 21 ÷ Solve: Solve: 3 (7 + 4) 12 ÷ 3 – 2 + 1
Advanced Financial Accounting
Task Force GDP flash at T+30 Kick-off meeting June 2013
Passenger Mobility Statistics 11 October 2018
Question.
I have… I have… Who has 3:40? Who has 12:20? I have… I have…
Paolo Valente UNECE Statistical Division
Presentation transcript:

ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 Short Information on ITER Design Review and Issue Cards: (an outsider view, better ask Franco Federici or Arne Kallenbach) as answer to the growing request for an ITER design review the possibility to submit issue cards appeared on Sept. 12, 2006 evidently, issue cards existed before for internal ITER use

ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006

ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 Arne Kallenbach and Peter Stangeby were appointed to lead the collection and consolidation process of issue cards drom the ITPA SOL/DIV on Sept. 21, by Oct. 11, 2006 the number of issue cards issued by the ITPA had increased to 46 a first compilations of issue cards from the ITPA SOL/DIV shows inconsistencies and contradictions

ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006

ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 between Oct. 11 and and Nov. 7, 2006 the issue cards were combined, consolidated, edited and reduced to 14 at the ITPA SOL/DIV meeting on Nov. 7, 2006 all issue cards were discussed, and a final list was compiled. For each card a group of scientists were identified responsible for final editing.

ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006

ITER Issue Cards Joachim Roth, Issue Cards, EU PWI TF Meeting, Ljubljana 2006 other organisations and associations, such as IPP, are compiling issue cards, partly on identical issues Can the EU PWI Task Force contribute to the ongoing design review? What PWI issues of high priority, requiring ITER design changes, remain unconsidered and need to be formulated in issue cards?