NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at 757-824-7450 or 7451 Contact Phil Whaley at (757) 824-7331 or Al McMath at.

Slides:



Advertisements
Similar presentations
EUMETSAT Data Collection System
Advertisements

Alert radio repeater automated backup, failover, recovery David Leader HydroLynx Systems.
Skyward Disaster Recovery Options
Spacecraft Constellation GOES-12 scheduled for de-commissioning in Dec 2013 –GOES-12 still supporting South American mission –GOES-12 DCS is turned on.
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
NOAA COMMAND AND DATA ACQUISITION STATION
GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010 Vanessa Griffin Project Manager,
Himawari-8 Project Plans and Status. Background 2 NESDIS is implementing a capability to ingest Advanced Himawari Imager data from JMA, process and generate.
1 Configuring Web services (Week 15, Monday 4/17/2006) © Abdou Illia, Spring 2006.
Implementing Native Mode and Internet Based Client Management.
Installing and Maintaining ISA Server. Planning an ISA Server Deployment Understand the current network infrastructure Review company security policies.
Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility.
DCS Alternate Data Distribution System (DADDS) Database Development Status Presentation to the STIWG/TWG July 9, 2008.
WebCCTV 1 Contents Introduction Getting Started Connecting the WebCCTV NVR to a local network Connecting the WebCCTV NVR to the Internet Restoring the.
Implementing High Availability
1 GOES DCS Status and Information Dan Schwitalla – th Meeting of the STIWG– 18 – 20 May 2009.
1 EDDN Status and Information Dan Schwitalla – 2009 USGS STIWG/TWG – 6-8 May 2014.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
IT Business Continuity Briefing March 3,  Incident Overview  Improving the power posture of the Primary Data Center  STAGEnet Redundancy  Telephone.
DEDS Migration to a New Architecture. Impact for Openreach CPs Guide for CPs using DEDS for downloading/uploading files.
All Experimenters Meetings Windows 7 Migration 1 April 18, 2011 W7 AEM Presentation.
PPD Computing “Business Continuity” Windows and Mac Kevin Dunford May 17 th 2012.
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
LRGS Enhancements for LRIT NOAA TWG Meeting May 12, 2011 Sutron Corporation Davis Drive, Sterling VA Tel: (703)
2014 TWG USACE Field Report LySanias Broyles Rock Island District
Tuesday, October 06, 2015 Santos Rodriguez NWS EMWIN HRIT/EMWIN.
1 DCPR Power Ranges Proposed for CS v.2.0 DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
SSEC Data Center Data 2010 MUG Meeting Jerrold Robaidek.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012.
Upcoming Frequency Topics: Future GOES-R Concerns
Gene Legg Office of Satellite Data Processing and Distribution Asia Pacific Satellite Data Exchange and Utilization Meeting Honolulu, HI, September 20-22,
Kay Metcalf NOAA GOES DCS Program Manager Office of Satellite Data Processing and Distribution NOAA’s Satellite and Information Service GOES DCS: NOAA.
Framework & Requirements for an Access Node Control Mechanism in Broadband Multi-Service Networks ANCP WG IETF 71 – Philadelphia draft-ietf-ancp-framework-05.txt.
Ilya Slutsker Data Base Development, Processing and Data Archive Data Collection Archives Processing Data Access Delivery and Distribution.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or is with copies to
LRIT Testing at NOAA/CO-OPS STIWG Oct CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS operates a DOMSAT system at its two regional.
TL101A – Introduction To OA LodgeMaster. Learning Objectives Become familiar with the capabilities of the OA LodgeMaster system. Learn how to use the.
A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
DEC.10,20061 Santos Rodriguez, NWS EMWIN CURRENT EMWIN OVERVIEW.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451  Contact Phil Whaley at (757) or Al McMath.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
LRIT Project Status Update STIWG/TWG, Boise, ID Mark Bushnell NOAA/NOS/CO-OPS May 02, 2012 Definitions LRIT – Low Rate Information Transmission LRGS –
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
1 © 2005 Cisco Systems, Inc. All rights reserved. 111 © 2004, Cisco Systems, Inc. All rights reserved. CNIT 221 Security 2 ver.2 Module 8 City College.
Geostationary Operational Environmental Satellite (GOES) User’s Conference Current Status of the NOAA GOES Direct Services Paul Seymour – Broadcast Services.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
GOES Data Collection System Status of Version II Transmitter Implementation Information Brief for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
NERC Lessons Learned Summary LLs Published in September 2015.
Business Continuity Planning for OPEN OPEN Development Conference September 18, 2008 Ravi Rajaram IT Development Manager.
DADDS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 6, 2014.
TRUE CANADIAN CLOUD Cloud Experts since The ORION Nebula Ecosystem.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
Virtual Machine Movement and Hyper-V Replica
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager November 17, 2010.
DADDS New Features Tuesday, May 3, 2016Sioux Falls, SD Letecia Reeves, GOES DCS Customer Service Specialist NOAA/NESDIS/OSPO/SPSD.
Overview.  Next Generation of I-Suite  Browser Based Application  Accessed From:  Incident Command Post – Internet Optional  Agency Offices  Wherever.
EMOSS-V Pre-Proposal Brief 19 May 2015, Room 2007.
DCS & LRIT LTE In-Band Interference Study Microcom Design, Inc. April 2016.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
© 2002, Cisco Systems, Inc. All rights reserved..
HEPiX Fall 2017 CERN project Follow-up
CAC Spectrum Monitoring Program Status 6 April, 2016
DCS Alternate Data Distribution System (DADDS)
GOES DCS Customer Interaction/Access Training
Presentation transcript:

NOAA COMMAND AND DATA ACQUISITION STATION

WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at (757)

Wallops LRGS Configuration No real changes to the LRGS We continue to use version 7.0 as the standard The cdadata server is consider the primary LRGS The cdabackup server is considered the secondary LRGS which mirrors EDDN The drot should be considered a troubleshooting tool to verify the DOMSAT downlink. Wallops with the ability to simultaneously stream the DCS data to the NSOF primary, backup, and the OSDPD Backup Facility (OBF) LRIT servers (Oct 09) Accounts are built through NOAA and shared with USGS

Wallops LRGS Configuration Analysis by Microcom showed that EDDN and NSOF were receiving 99.5% of the data that is received at Wallops. No real changes to the LRGS configuration since the last meeting Sites and IPs: – ( ) – ( ) – ( )

LRIT Status Files built and transmitted every 30 seconds Wallops is working with OSDPD to use the backup at Wallops during periods of outages. The OSDPD failover would be manual – not automatic The fix for the “flooding” issue has been installed and is working properly. The DCS component of LRIT is transferred from Wallops to Suitland (via Internet) and then back to Wallops (via T-1). 1 meter antenna receives full LRIT stream There are no re-occurring costs associated with LRIT reception. LRIT issues in Mar 10 –Mar 19 – 22 replication down due to account problems –Mar 24 - Five minute outage due to socket problems –Mar 26 - four hour outage due to T-1 failure –Mar 28 - five hour outage due to T-1 failure (Verizon frame problem)

Spacecraft Status GOES-11 is the primary West (135W) spacecraft and it will remain so. Batteries on GOES-11 look OK. We did not have to use GOES-13 for DCS/LRIT/EMWIN during Spring eclipse. However, GOES-11 has only one command receiver that is functional GOES-14 is positioned (105W) and will remain active to support the XRS instrument

Spacecraft Status GOES-P (GOES-15) was launched successfully on March 4, 2010 Post Launch Testing successfully completed at Wallops during the Spring of 2010 GOES-P/15 will be placed in storage due to 5 year warranty of the instruments. No plans to activate S/C at this point.

Spacecraft Constellation GOES-10 was de-commissioned in Dec 2009 GOES-13 is now prime East S/C (as of Apr 26) GOES-13 will be first spacecraft to support 750Hz channelization (function of S/C power) GOES-11 remains prime West S/C GOES-12 started its drift (27 Apr) to support the South Americans (May 2010) GOES-14 will be in “storage” but still support XRS (X-Ray Sensor) GOES-15 will be in storage (T&C only)

Certification October’s slide Phil needs to speak to this one Version 2 (channel splitting & tighter receive filtering) of Cert Standards ratified by OSD in Oct 2009 Three certification test sets to support the new standards have been upgraded and are being deployed to vendors upon request It is not expected that 100bps will not be supported for certification after ver 2 standards are adopted (this is policy, only 4 years left on 100bps support). It has been proposed that the Wallops 300 & 1200bps test channels, for East and West, be upgraded to be compliant with the ver 2 certification standard.

Wallops Backup A second pilot remains active (channel 0) at the WBU. The frequency is 401.7MHz. Wallops Backup has been re-positioned to support GOES-13 as the prime East S/C LRIT and EMWIN equipment is at WBU & FCDAS still waiting for connectivity to OSDPD – multicast issue.

DAPS/DADDS IT team is working security –later slide DADDS on-line as the primary DCS processing system in Jan 2010 Transition began on Oct 5 DAPS/DADDS operations were in parallel until Jan. All services are now through DADDS Three test transmitters installed, tested, and accepted during the week of Apr 26. Three pilot transmitters installed, tested, and accepted during the week of Apr 26. Wallops Operations verifies and reports the DCS pilot levels daily.

DADDS A complete backup resides at NSOF. This includes the RF front end (demods) and the associated demodulators. GOES Incident Reports have been generated Software release in Apr 2010 addressed many of these issues

DCS - Security Certification and Accreditation efforts began on Oct 1. C&A was completed on Mar 31 We now have a 3 year Authority To Operate This includes the WCDAS and the NSOF Boundaries include Wallops and NSOF All of DADDS security H/W in place HTTPS on Wallops and the NSOF systems is now in place

DOMSAT Aug 31, 2010 marks the end of Option Period-8 The current contract with Americom Government Services (AGS) expires September 2011 (Option period-9 the final option). Wallops in discussion with DOMSAT provider to identify modem options for consideration in follow- on DOMSAT contract discussions (x25 and 56k bandwidth may not be practical after FY12)