Hall A Collaboration meeting January 5 th 2007 A. Camsonne Compton Polarimeter Status Report Alexandre Camsonne Hall A Collaboration Meeting January 4.

Slides:



Advertisements
Similar presentations
Bob MichaelsParity Collab. Mtg. May 17, `07 Integrating Compton DAQ and Analysis Bob Michaels with Reminder about Nov 2006 Results Specification of new.
Advertisements

Cavity Locking by Piezo-Driven Mirror Botao Jia Duke University Advisor: Dr. Nanda Sirish HAPPEX Collaboration Meeting Dec 1, 2006.
PPLN Frequency- Doubling Project Diana Parno Hall A Parity Collaboration Meeting May 17, 2007.
Green cavity progress Botao Jia May Advisors: Dr. Nanda Sirish, Dr. Wu Ying HAPPEX Collab. Mtg. May 17-18, 2007.
Polarized 3 He Target for A1n-A J. P. Chen, June 11, 2013, Hall A Meeting Overview Design Progress Progress in target lab Progress from users.
Thomas Jefferson National Accelerator Facility S. Nanda, July 28, Hall A Compton Polarimeter Upgrade Sirish Nanda Jefferson Laboratory PRex Collboration.
E status report Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting December 13 th 2007.
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
The High-finesse Fabry-Perot Cavity
Hall A Collaboration Meeting S. Nanda, June 23, 2005 Hall A Compton Polarimeter For Hall A Collaboration Meeting June 23 rd 2005 Sirish Nanda Thomas Jefferson.
May 17th 2007 Happex Collaboration Meeting 1 Compton polarimeter Electron detector upgrade and status PREX/Happex Collaboration Meeting May 17 th 2007.
Thomas Jefferson National Accelerator Facility S. Nanda, December 5, Hall A Compton Polarimeter Sirish Nanda Jefferson Laboratory Hall A Collboration.
Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Thomas Jefferson National Accelerator Facility S. Nanda, June 22, The Hall A Compton Polarimeter Sirish Nanda Jefferson Laboratory Hall A Collaboration.
Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise measurement of the density -dependence.
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
COMPTON POLARIMETRY Analysis status Scaling laws 3 GeV Toward 850 MeV.
CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine.
T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
Compton Laser and Systematics for PREx Abdurahim Rakhman Syracuse University PREx Collaboration Meeting, JLab January 30, 2011.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
A_RD_01 Applications of a high finesse Fabry Perot Cavity for the ILC ► Introduction ► Status of the cavity R&D – at ATF – at LAL/Orsay French Labs. :
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
Installation of a Four-mirror Fabry-Perot cavity at ATF 1.Our setup/goal 2.Why 4 mirrors ? 3.The ATF 4-mirror cavity 4.The optical scheme 5.The laser/cavity.
Proton Form Factor ratio GEp/GMp with polarization method --on behalf of Jefferson lab GEp3 collaboration Wei Luo Lanzhou University, China April
GWADW, May 2012, Hawaii D. Friedrich ICRR, The University of Tokyo K. Agatsuma, S. Sakata, T. Mori, S. Kawamura QRPN Experiment with Suspended 20mg Mirrors.
Thomas Jefferson National Accelerator Facility S. Nanda, July 22, The Hall A Compton Polarimeter Upgrade Sirish Nanda Jefferson Laboratory Parity.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
IPBSM status and plan ATF project meeting M.Oroku.
Diana Parno – July 22, 2008 January PREx Test Run: Compton Photon Analysis Diana Parno Carnegie Mellon University HAPPEX Collaboration Meeting.
LPOL-cavity Introduction Tests at Orsay Optics (laser polarisation) Calorimeter DAQ Mechanics & installation at DESY  Norbert’s talk.
A study of systematic uncertainties of Compton e-detector at JLab, Hall C and its cross calibration against Moller polarimeter APS April Meeting 2014 Amrendra.
COMPTON POLARIMETRY Collected data Cavity power Status on counting methods Systematic errors and hardware issues.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
LIGO-G0200XX-00-M LIGO Scientific Collaboration1 First Results from the Mesa Beam Profile Cavity Prototype Marco Tarallo 26 July 2005 Caltech – LIGO Laboratory.
Compton Experiment at ATF Tohru Takahashi Hiroshima University for Collaborators (particularly Omori san for slides)
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
Status of the Advanced LIGO PSL development LSC meeting, Baton Rouge March 2007 G Z Benno Willke for the PSL team.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Compton Experiment at ATF Compton Meeting at LAL Orsey 2-Dec-2008 Tsunehiko OMORI (KEK) with many thanks to Compton collaborators.
Diana Parno – 18 April 2009 Compton Photon Detector Upgrade Diana Parno 18 April 2009 HAPPEX Collaboration Meeting.
The Hall A Compton Polarimeter Upgrade
The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn,
GEp-III in Hall C Andrew Puckett, MIT On behalf of the Jefferson Lab Hall C GEp-III Collaboration April 15, 2008.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
1 A Proposal for Compton Electron Detector R&D Stephan Aune 9, Alexandre Camsonne 1*, Wouter Deconinck 8, Dipankgar Dutta 4, Gregg B. Franklin 7, David.
1 First Results of the SLD Cerenkov Polarimeter at the DESY test beam Oleg Eyser Daniela K äfer, Christian Helebrant, Jenny List, Ulrich Velte*
Thomas Jefferson National Accelerator Facility Page 1 John LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab September 22-24, 2009 Physics.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
25/05/2007POSIPOL FOUR MIRRORS Fabry Perot resonator at LAL-Orsay Y. Fedala With help of F. Zomer, R.Cizeron.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
for the HADES Collaboration
Upgrade activities at Clermont-Ferrand
Counting Mode DAQ for Compton
Data Taking and Samples
Introduction Present Status Idea of optimisation Cavity Lpol
Gingin Advisory Committee Meeting 08 Dec 2009
Hall A Compton Electron detector overview
Status of LIGO Installation and Commissioning
First Results from the Mesa Beam Profile Cavity Prototype
Presentation transcript:

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Compton Polarimeter Status Report Alexandre Camsonne Hall A Collaboration Meeting January 4 th 2007

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Status in 2006 Not very big year for Compton since most running was low energy Data taken at 2 GeV Gen He4 polarisation ( test data ) Current status Problem with electron detector seems to have been damaged Upgrade developments on going to allow low energy running and better systematics

Hall A Collaboration meeting January 5 th 2007 A. Camsonne The Hall A Compton Polarimeter Upgrade Motivation: 1.5kW Green Fabry-Perot Cavity Twice the Analyzing power of present IR cavity Four-fold increase in Figure-of-Merit Improve accuracy of experiments by providing 1% beam polarimetery down to 1 GeV. High precision Parity violating experiments are feasible with this upgrade New Electron Detector High resolution silicon microstrips to improve tracking resolution Integrating Photon Detector Improve systematic uncertainties experienced in the counting method Participating Institutions: Jefferson Lab, Saclay, Syracuse, Clermont-Ferrand, Uva, Duke Scope:

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Expected Performance Simulation by David Lhuillier < 1% GeV obtained in about 4 hrs with 50 uA beam

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Optical Setup Laser frequency is continuosly tuned to lock to Fabry-Perot Cavity

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Prometheus Green Laser W W Manufacturer: Innolight GmbH, Germany 708 nm Pump Diodes (2) 1064 nm Nd:YAG 532 nm SHG via PPKTP

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Green Fabry-Perot Cavity Fixed mirror distance 2 Axis adjustable mirror mount 2 Axis adjustable stands UHV compatible Intra-cavity power 1.5 kW The Mirrors (source Research Electo Optics) Dielectric super mirrors Reflectivity > % Finesse > 50,000 Loss < 20 ppm ROC 50 cm Design Goal: Improve upon Saclay IR cavity non-adjustable mirror design, while keeping mirror distance fixed.

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Assembled Cavity Photograh: Alan Gavalya

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Cavity Mirror Mount

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Optics Summary Laser The Prometheus laser lost power dramatically and developed large intensity noise within a few moths of operation Sent back to Innolight, Germany for repairs. 2 month down time and 9K$ After repairs (replacing the pump diodes and realignment) the power is back to over 100 mW exceeding specification. However, Botaos profiling finds that the beam is still 70% elliptic. We will try to solve it with optical circularization. Intensity noise suppression electronics now installed on the laser. 4k$ Polarization transfer function has been fully characterized (Xiaochao) Mode matching solution developed (Alex Jousse and Botao Jia) Alignment Cavity mirror alignment with red HeNe laser works nicely High resolution motorized mirror alignment and beam steering implemented (David Jacobs) EPICS interface under way (Sue Witherspoon) Position sensitive photo-detectors installed Cavity The cavity is mechanically stable and responsive to mirror alignment ( Joyce and Ravi) In Torr vacuum (Greg Marble and Ed Folts) The cavity demonstrates strong TEM 00 resonance However, laser-to-cavity coupling is poor (30%) -> improve mode matching

Hall A Collaboration meeting January 5 th 2007 A. Camsonne New Electron Detector Electron Detector (Bernard Michel) MOU with LPC Clermont-Ferrand LPC takes responsibility for a new high resolution electron detector Contribute 1 physicist, 1 engineer, 2 designer/techs The new detector will be compatible with 12 GeV machine upgrade Specification 768 ch 240 m pitch silicon strips 4 Planes, 192 strips/plane, 1 cm spacing between planes 120 mm Vertical motion to allow full coverage of Compton Edge from GeV New custom front-end, FPGA trigger module (ETROC) New DAQ and Analysis Software

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Electron Detector Status Silicon Microstrips (Michel Brossard) Silicon microsrtip final design completed Four planes have been ordered from Canberra-Eurisys system Delivery of first plane expected late December Mechanical (Francois Daudon, Alan Gavalya, Joyce Miller, Chris Curtis) Vacuum chamber final design completed, fabrication to begin soon Survey and alignment scheme finalized Vertical motion system design in progress Installation plan in development with AES (Tim Whitlatch) DAQ/Analysis (Alex Camsonne) Working on CODA interface for new ETROC Need new electron event analyzer Control System (Sue Witherspoon) Motion Control EPICS interface Beam shut-down safety interlock

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Silicon Microstrip Plane

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Electron Detector Assembly Drawing

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Silicon Microstrip Mount

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Compton photon integrating method A couple of shifts dedicated to the Compton tune during E ( Special thanks to S. Strauch and R. Ent ) Test Flash ADC integrating method Beam tuning to get a reasonable signal over background ratio First test with DC coupled base for the PMT of the central crystal Commissionning of the Flash ADC Production data ( invasive because of bad injector tune) Low current running First Compton events in FADC

Hall A Collaboration meeting January 5 th 2007 A. Camsonne PMT Fan in/out Amplifier Upstairs counting house Experimental hall FADC Amplifier Setup New base

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Signal from Flash ADC

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Signal from Flash ADC

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Compton events

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Compton signal

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Compton signal

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Measurement principle Compton asymmetry ?

Hall A Collaboration meeting January 5 th 2007 A. Camsonne Concluding Remarks The Hall A Green Compton Polarimeter Upgrade Project is on track to be operational in Issues and concerns: The Prometheus lasers short lifetime is a concern Alternative single pass PPLN based green laser is important backup to be studied Coupling efficiency of the laser to the cavity is rather low at 20%. More work is needed to improve coupling efficiency. Locking servo electronics needs more effort and interaction with the manufacturer. An electronics engineer/student is needed. - On going developments for 2007 : Electron detector Cavity Photon detector integrating method