“Fix Tube Sheet” Heat Exchanger

Slides:



Advertisements
Similar presentations
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation Positive isolation of dangerous fluids is providing a safe environment during.
Advertisements

The idea evolved from two different contractor customers who shared with us a better way to perform hydrostatic testing of DWV piping system. Two different,
CHAPTER 45 Engine Lubrication.
REMOVE AND INSTALL THERMOSTAT AND TEST OPERATION CS4 A.1 D.6 P-5/6.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 >>
GNI0003H PP1 Loop Trainer. GNI0003H PP2 Reason for Study Because the Loop Trainer gives instructors the capability to control water flow, pressure and.
5/4/ Vacuum Regulator Gas Feed Systems: Theory and Maintenance Thom DiGeronimo OperatorSchool.Com.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Reservoirs Covered in Ch. 5 of Vickers Text
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
1B-1 Fire Engine Maintenance Unit 1B – Pump Inspections and Maintenance.
"AIR COOLER" Heat Exchanger
Suction Pumps.
994 RPDA 21/2”- 6”. Modification Overview  Production of the 994RPDA began in 1999 and is current.  The 994 RPDA currently utilizes the ¾” 009M3 for.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
Pump Installation Vigyan Ashram, Pabal.
PROJECT AND STUDY DRAWINGS & DIAGRAMS
FILTERING MDP. Safety and Safety Gear  When filtering from a fermentation vessel you should never use carbon dioxide to push the beer through the filter,
CARBURETED FUEL SYSTEM
Hydronic Mechanical Controls
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Griner Drilling Service
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
HVAC523 Circulator Pumps.
GIDC DEGREE ENGINEERING COLLEGE BRANCH- CIVIL ENROLLMENT NO PATEL SHARADKUMAR KIRITBHAI SHARMA TANISHQ SHAH ASHIT.
Floating Head Heat Exchanger
INTRODUCTION Definition:
Heat Exchangers This is session 19 in curriculum manual.
Vacuum system.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
Add plants to your garden
Spiral Heat Exchangers – “The Problem Solver”
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
1 Product Presentation January Normal BinROXELL Bin Old feed Normal bin: ‘centerflow’ feed flows first in center  bridging ‘mass flow’ feed.
AfterSalesTraining Welcome to AfterSalesTraining.
1 MICE Hydrogen system Working group mtg – 01/09/14.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
INSTALLATION MANUAL FATL Machine Installing: ACTIVITY CHECK POINT 1. Minimum two persons required for opening the Machine. 2. Cut the straps & tape. 3.
774X DCDA 21/2”, 6”, 8” 774X DCDA 21/2”, 6”, 8”. Modification Overview  Production began in  The 2 ½” 774X DCDA was discontinued in  The.
Temperature Test Allows monitoring of temperature changes.
Assembly of the doorknob
45 Chapter Exhaust System Technology and Repair.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
14 Refrigerant Recovery, Recycling, and Recharging.
Product Presentation January 2010.
Definition of work flow for string DESY Example on critical operation
774X 21/2”, 6”, 8”.
Integration issues at IHEP
Soxhlet Unit B Maintenance By: Shawna Brookes.
2000SS 2½”-12”.
SB Packing Automatic Downpuller Power Unit
Fuel Supply System Service
Horizontal Installation Overview
Floating Head Heat Exchanger
774 DCDA 21/2”-12”.
5000SS 21/2”- 6”.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
VG INSTALATION & MAINTENANCE.
2000SS 2½”-12”.
774 2½”-12”.
3000SE 21/2”, 6”, 8”.
Presentation transcript:

“Fix Tube Sheet” Heat Exchanger General Assembly view Shell side Outlet Shell side Inlet Tube side Inlet Tube side Outlet Shell Distributor Tube Sheet Gasket Saddle End Flange Cover

“Fix Tube Sheet” Heat Exchanger Cross Sectional View Assembly Baffle Shell Distributor Tube sheet Tube Cover Tube Sheet

“Fix Tube Sheet” Heat Exchanger Split view sectioned parts Gasket Distributor Gasket Shell-Tube sheet-Tubes Cover Gasket End Flange

“Fix Tube Sheet” Heat Exchanger Split View of Parts Gasket Gasket Tube Sheet Shell Saddle Cover Distributor End Flange Gasket

Do Not Start The Job Without a Safety Plan MAINTENANCE "Fix Tube Sheet" Heat Exchanger Safety First Plan Do Not Start The Job Without a Safety Plan

“Fix Tube Sheet” Heat Exchanger Maintenance Activity Description Blind Inlets-Outlets at plant area Install Blinds in-Out of shell Disconnect and remove Distributor with gasket Remove Cover with gasket Ground level

“Fix Tube Sheet” Heat Exchanger Shell Hydro-test Install pressure gauge Eliminate leaks if found Connect water pump Drain water from shell Fill the shell by water Remove PG & Water pump Raise the pressure at value indicated by Inspection Remove blinds, fix gaskets & tight bolts PG Drain Water Pump Ground level

Shell Side Hydro-test …Leak elimination from tubes [Details] “Fix tube sheet” Heat Exchanger Shell Side Hydro-test …Leak elimination from tubes [Details] Tube sheet Blind Tube sheet PG Shell Leak elimination by Plugs Water Plug Leak Plug Tube PG Leak elimination by Expansion Leak Water Expander

“Fix tube sheet” Heat Exchanger Tube Side Hydro-test [Details] Install distributor with new gasket Fill Water tube side Raise the pressure up to the value indicated by Inspection Install blinds at inlet-outlet Check sealing distributor to shell Install Pressure gauge & water pump Check sealing distributor to end flange Install cover with gasket Check sealing cover to Shell Discharge water remove PG & pump Remove blinds at distributor in-out PG Water Pump Ground level

“Fix Tube Sheet” Heat Exchanger Handover & Final House Keeping By Maintenance Remove tools and equipment Close Work permit Clean and wash the area Remove scaffold after unit start-up Ground level