Crown Castle Proposed DAS System

Slides:



Advertisements
Similar presentations
Orinthology Mill Creek Middle School Science Olympiad 2010.
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Terms. 1. Globalization 2. Financing 3. Inputs.
After Baptism, What Then?. Things To Remember... You are a new creature 2Co 5:17; Ro 6:3-4 You are a babe in Christ 1Co 3:1-2; He 5:12-14 You are in a.
DART Orange Line Project Update and Development Opportunities
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
State Policy Initiatives Financing Wind Power: The Future of Energy May 7-9, 2008 Richard Cogen.
Mourad Loulou, Tunisia Section Chair 1 Mourad Loulou Tunisia Section Chair IEEE Tunisia Section.
11 Inova Fair Oaks Hospital Master Facility Plan Zoning Applications Presentation March 2011.
K A I S E R C O M M I S S I O N O N Medicaid and the Uninsured Figure 0 Medicaid: The Essentials Diane Rowland, Sc.D. Executive Vice President, Henry J.
K A I S E R C O M M I S S I O N O N Medicaid and the Uninsured Figure 0 Health Reform Primer: Who are the Uninsured? Diane Rowland, Sc.D. Executive Vice.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Nairobi, Kenya, 26 – 27July 2010 EMF MEASURING IN KENYA Derick simiyu khamali Compliance and Enforcement Officer Communications Commission of Kenya ITU-T.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Human Performance Improvement Process
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
European Commission Directorate-General Employment, Social Affairs and Equal Opportunities New Skills for New Jobs Annual Northern Ireland Skills Conference.
ZMQS ZMQS
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
1 Incorporating Extreme Weather Risks in Asset Management Planning Lynn Clarkowski.
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Water Utility Business Applications. 2 Agenda Industry overview and trends Our application visionary solution Business values Wireless network components.
2009 Strategic Planning playbook
ABC Technology Project
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Storm Center ® Online Outage Map Tim Prince, Emergency Operations Bob Williamson, GIS Support
VOORBLAD.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Chapter 5 Microsoft Excel 2007 Window
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Exploring Nuclear Energy. Nuclear Fusion and Fission  Nuclear Fusion Small nuclei into large Immense temperature and pressure Core of stars Iron is the.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
City Council Meeting Agenda Items October 28, 2013.
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
OHT 5.1 © Marketing Insights Limited 2004 Chapter 5 E-business Strategy.
1 Tracking Innovation in NC Patterns and Implications for NC's Eastern Region John Hardin, Executive Director NC Board of Science & Technology
Addition 1’s to 20.
25 seconds left…...
Rural Broadband, LLC Henry County Fiber Network Initiative Rural Broadband, LLC 15 Lake Street, Suite 270 Savannah, GA Contact: Allen Davis
Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
Immunobiology: The Immune System in Health & Disease Sixth Edition
How Cells Obtain Energy from Food
Immunobiology: The Immune System in Health & Disease Sixth Edition
Introduction to Crown Castle When coverage or capacity gaps are identified by the wireless carriers, Crown Castle will either: – Provide a fix by easily.
Presentation transcript:

Crown Castle Proposed DAS System Introduction & Overview Newpath Penderbrook ODAS Project – 2232-MD10-14 March 23, 2011

Introduction to Crown Castle Our Mission is to deliver the highest level of service to our customers at all times – striving to be their critical partner as we assist them in growing efficient, ubiquitous wireless networks. When coverage or capacity gaps are identified by the wireless carriers, Crown Castle will either: Provide a fix by easily & simply collocating on one of our towers, rooftops or DAS systems If we do not have a suitable Crown asset, we will identify another structure that will solve the problem If there are no towers or other suitable structures, we will build a tower If a tower is not appropriate for the location, we will build a distributed antenna system

Crown Castle DAS Operations Somerset/Newport Hills WA Seattle WA Includes systems under development Seven Hills NV South Anthem NV Green Mountain I & II CO Clear Creek CO O’Hara Twp PA CONSOL Energy Center PA Cherry Hills CO Xcel Energy Center MN Burnside OR Lake Oswego OR Highway 50 CA Davis CA Hutchinson River Pkwy NY North Shore Long Island NY McLaren Park CA Webster Tunnel CA Stanford University CA Monte Sereno CA Muddy Branch MD Norbeck MD Penderbrook VA Silver Lake CA Turtle Rock CA Redlands CA Temecula CA SoCal Phase 5.0 CA Major Amusement Park, Anaheim CA Pelican Hill CA Hunter Mill VA Hilton Head Plantation SC Madeira VA Great Falls I & II VA Yakey Lane VA ADD - Colonial Williamsburg VA Major Amusement Park & Resort, Lake Buena Vista FL Amway Arena FL Blood Mtn GA Fountain Hills AZ Glendale AZ University of Phoenix Stadium AZ Jobing.com Arena AZ North Scottsdale AZ French Quarter LA South Scottsdale AZ Pinecrest FL Paradise Valley AZ Texas Medical Center TX

Why DAS? THERE IS EXPLOSIVE GROWTH IN THE USE OF WIRELESS DEVICES, PARTICULARLY THOSE ACCESSING THE INTERNET AT BROADBAND SPEEDS: From 3.1 Million in 2005, to 21.9 Million 1 year later in 2006.

Proposed DAS network: Penderbrook Fourteen (14) total outdoor DAS nodes connected to hub location Eleven (11) outdoor DAS nodes located in Sully District, three (3) located in Providence District AT&T Wireless as anchor tenant Neutral host platform to be marketed to all Wireless Service Providers

Proposed DAS network: Network Design – Sully District Nodes

Fairfax County Process For DAS Permitted use under Section 2-514 of the Fairfax County, VA Zoning Ordinance Subject to Comprehensive Plan Review (2232 Review) with one (1) public hearing before Fairfax County Planning Commission Planning Commission hearing date TBD

Fairfax County Comprehensive Plan - DAS Objective 42, a) – Avoid construction of new structures by locating telecommunication facilities on available structures such as electric utility poles Objective 42, b) – Consider public lands as the preferred location Objective 42, j) - Mitigate the visual impact…using effective design options such as…increasing the height of or replacing existing structures to reduce the need for another structure when such height increases…are appropriate

Newpath Penderbrook – Photo-Simulations Node Photo-Simulations – Sully Nodes

Penderbrook– Node 1 – Photo Simulation Before After

Penderbrook– Node 2 – Photo Simulation Before After

Penderbrook– Node 3 – Photo Simulation Before After

Penderbrook– Node 4 – Photo Simulation Before After

Penderbrook– Node 5 – Photo Simulation Before After

Penderbrook– Node 6 – Photo Simulation Before After

Penderbrook– Node 7 – Photo Simulation Before After

Penderbrook– Node 8 – Photo Simulation Before After

Penderbrook– Node 9 – Photo Simulation Before After

Penderbrook– Node 12 – Photo Simulation Before After

Penderbrook– Node 13 – Photo Simulation Before After

NewPath ODAS Development History – Fairfax County, VA 2007 – Hunter Mill Project (Phase I) – Four (4) outdoor DAS nodes plus hub location approved via 2232 process and constructed on Hunter Mill Road. Two tenants on system: Sprint, AT&T. 2008, 2009 – Great Falls Project (Phases I and II) – Forty-eight (48) outdoor DAS nodes plus hub location approved via 2232 process and constructed in Great Falls, VA. One tenant on system: AT&T. 2011 – Hunter Mill Phase II – Five (5) additional outdoor DAS nodes proposed on Hunter Mill Road and in 2232 process. System proposed for AT&T.

Example Outdoor DAS Nodes Existing Node on Hunter Mill Road

Hunter Mill Node 2 – Pole QD58 – Hunter Mill Road & Vale Road – 42 feet

NewPath Penderbrook – RF Data – Existing

NewPath Penderbrook – RF Data - Proposed

DAS Safety Basics The Federal Communications Commission (FCC) established RF Standards for wireless transmission facilities based on a three year rulemaking process Process included evaluation of the two most widely recognized standards of ANSI (American National Standards Institute) and NCRP (National Council on Radiation Protection) Input received from the public, academia, scientists, the telecommunications industry and federal health & safety agencies The maximum standards adopted were recommended by both the EPA and FDA The FCC standard is 50 times below a level that the majority of the scientific community believes may pose a potential health risk

DAS Safety Basics FCC Maximum Exposure Limits PCS (1900 MHz) 1.00 Milliwatts per cm2 Cell (800MHz) .533 Milliwatts per cm2 DAS General Population Exposure Example Case (person standing at base of pole) % of FCC Wireless Operators Exposure Limit 4 PCS Operators 0.6% 3 Cell/SMR , 1 PCS 0.2% Exposure standing at base of standard 42’ pole is less than exposure sitting next to someone on a cell phone.

Thank you for your consideration Questions and Additional Information: Robert L. Ritter Manager, Land Use - DAS Crown Castle 2000 Corporate Drive Canonsburg, PA 15317 (724) 416-2417 bob.ritter@crowncastle.com