I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.

Slides:



Advertisements
Similar presentations
1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator October 5, 2010.
Advertisements

1 Fairfax County Base Realignment and Closure Laura Miller Fairfax County BRAC Coordinator October 18, 2011.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
County of Fairfax, Virginia Department of Transportation Regional Bus Rapid Transit Efforts Board Transportation Committee October 20, 2009.
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
1 TransAction 2040 NVTA Presentation 1 May 10, 2012.
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Update – January 2011 New Travel Choices Ahead.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level 495 EXPRESS LANES ITS TIME TO CHANGE.
County of Fairfax, Virginia Department of Transportation Fairfax Connector Bus Service Plans HOT Lanes and Dulles Rail Phase I Fairfax County Board of.
Fairfax County Transportation Committee November 29, 2011 Fairfax County Transportation Committee November 29, 2011 I 95 HOT Lanes Update.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
1 I-95/395 HOV/Bus/HOT Lanes April Current Status Project Sections Military Corridor Improving Transit & HOV Other Issues Agenda 2.
I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
I-66 Corridor Improvements Outside the Beltway CTB Briefing
Update on VDOT’s Northern Virginia ITS Architecture Plan and Integrated Corridor Management (ICM) Activities MANAGEMENT, OPERATIONS, AND INTELLIGENT TRANSPORTATION.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
1 The 2010 Financially Constrained Long-Range Transportation Plan And FY Transportation Improvement Program TPB Technical Committee November.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
WeGoMil - Real-Time Rideshare August 8, 2012 WeGoMil Real-Time Ridesharing Funded by FHWA & VDOT grants 6 month pilot Exclusively for military personnel.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
Urban Partnership Agreement Summary August 27, 2007.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan I-95 Corridor Stakeholder and Service Provider Meeting #2 June 13, 2011.
1 I-95/I-395 HOV/Bus/HOT Lanes Project update December
Business Logistics 420 Urban Transportation Fall 2000 Lectures 6: Coping with Edge City Transportation Problems: Livable Cities, Transit-Friendly Land.
Imagine the Possibilities… Vision from the 2002 Rail Plan.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study TPB Citizens Advisory Committee Public Forum in Oxon.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) December 19, 2012 (updated from November 28, 2012)
Interstate 95 Corridor Improvement Program June 20, 2012.
Regional Priority Bus Transit Conference June 24, 2009.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
1 What If… The Washington Region Grew Differently? February 2005 Public Meeting on Alternative Transportation and Land-Use Scenarios National Capital Region.
HOV Or HOT? Robert Lang 14 March 2005 Hello; I am Robert Lang. I take a moment to thank Delegate Jeff Frederick for the great.
Transportation leadership you can trust. presented to 12 th Annual TRB Transportation Planning Application Conference presented by Dan Goldfarb, P.E. Cambridge.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
County of Fairfax, Virginia Fairfax County Comprehensive Transit Plan and Transit Development Plan Board Transportation Committee December 1, 2015 Randy.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
The 2006 Constrained Long-Range Transportation Plan: Plan Performance Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item #7.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study Ronald F. Kirby Director, COG Department of Transportation.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
Beyond Oil Transforming Transportation: A National Demonstration Project Breakout Session: A New Paradigm - Future of Transportation, Funding, and Climate.
The Partnership between Transportation and Technology Jennifer Mitchell, Director Department of Rail and Public Transportation ITSVA Conference.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Integrating Transit and Highway Solutions In High Volume Corridors
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 15, 2016 Helen Cuervo VDOT District Administrator, Northern Virginia.
Slugging in the I-395 Corridor
Presentation transcript:

I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011

The Title Would be Placed Here Addressing critical need Washington DC Metro area has worst congestion in nation according to recent Texas Transportation Institute study Traffic conditions on I-95 are getting worse Five major military sites affected by BRAC, relocations begin this year Nearly half of all of Virginia's population growth in past decade has been in jurisdictions between Fredericksburg and the Beltway We can no longer wait to deliver congestion relief and new travel choices. The Capital Beltway and I-95 corridors are home to some of Virginias most important employment centers and military sites. –Sean T. Connaughton, Virginia Secretary of Transportation

The Title Would be Placed Here Relief & new choices on I-95 Concurrent package of improvements: I-95 HOV/HOT Lanes Provide new choices, add capacity, extend and improve performance of existing HOV VDOT Seminary HOV/Transit ramp Link HOV lanes on I-395 to growing Mark Center Department of Rail and Public Transportation Transit Improvements Maximize benefit of growing HOT Lanes network by expanding bus service, Park & Ride lots

The Title Would be Placed Here I-95 HOV/HOT Lanes Build 9-mile extension of existing HOV lanes from Dumfries to Garrisonville Rd in Stafford County Expand existing HOV lanes from 2 to 3 lanes for 14 miles between Prince William Parkway to vicinity of Edsall Road on I-395 Improve the existing two HOV lanes for six miles from Rt. 234 to Prince William Parkway Add new or improved access to and from HOV/HOT network at key interchanges

The Title Would be Placed Here Key benefits Added capacity to manage congestion Expanded, regional HOV/transit network New access points to serve Virginia- based destinations, including Tysons Corner and major military sites Improved performance of HOV system New option when travelers need to be somewhere on time Significant job creation

The Title Would be Placed Here New & improved access Garrisonville Road Joplin Road Prince William Parkway Fairfax County Parkway Franconia-Springfield Vicinity of Edsall Road I-495 Capital Beltway HOT Lanes Connects carpoolers, buses and motorists to Virginia-based employment centers

The Title Would be Placed Here Enhanced travel & safety Dynamic tolling based on real-time traffic conditions to manage traffic levels Improved incident response and traffic management State troopers Cameras Automatic incident detection technology HOT Operations Center Enhanced driver information Active traffic management will keep traffic moving, help travelers better predict travel times

The Title Would be Placed Here Improved service for existing carpoolers Added enforcement, troopers to force violators out of the HOV lanes HOV benefit all day, not just during rush hour Access to new destinations, including Tyson Corner, Ft. Belvoir HOV lanes on I-395 north of Edsall Road remain the same; continued incentive to pick up slugs Relief from Dumfries bottleneck More than 1-out-of-3 vehicles on todays I-95 HOV lanes are violators. HOT Lanes will keep those violators out.

The Title Would be Placed Here Bottleneck Fix 9-mile, two-lane extension addresses worst bottleneck in region, gets commuters home faster Flyovers at Joplin Road and Garrisonville Road Extension, two flyovers significantly improve transition from todays single, left-exit slip ramp Two-lane, reversible extension brings HOV to Stafford County

The Title Would be Placed Here Key Milestones Environmental assessment and related studies throughout 2011 Citizen information meetings anticipated Fall 2011 Construction as early as 2012 Construction anticipated 2-3 years

The Title Would be Placed Here Mark Center HOV/Transit Ramp Delivered concurrently with HOV/HOT Lanes Links Seminary Road to I-395 Ramp restricted to HOV/transit No anticipated impact on Winkler Nature Preserve Environmental, traffic studies begin 2011 Construction as early as 2013

The Title Would be Placed Here Transit improvements Park & Ride lots Expanded express bus service Scope and funding plan developed by DRPT in direct coordination with local jurisdictions Maximizing the new regional transit/HOV network provided by HOT Lanes

The Title Would be Placed Here Supports thousands of jobs and boosts local economy Creating jobs New business opportunities for disadvantaged, small, women, minority-owned businesses Maximizes Commonwealths previous investment in I-495 HOT Lanes by creating seamless HOT/HOV network Helps solve congestion issues to help Virginia remain an attractive place to do business – critical to Tysons/Merrifield redevelopment Construction will support over 8,000 jobs

The Title Would be Placed Here Regional Project and Traffic Information VIRGINIA.ORG Project Information Resources