Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

York Viva Bus Rapid Transit (BRT) Concept image along Davis Drive.
1 Update on Bicyclist & Pedestrian Data Collection and Modeling Efforts Transportation Research Board January 2010 Charlie Denney, Associate Michael Jones,
DART Orange Line Project Update and Development Opportunities
County of Fairfax, Virginia Department of Transportation Regional Bus Rapid Transit Efforts Board Transportation Committee October 20, 2009.
Tysons Circulator Study: Process and Preliminary Results Summary March 2012.
County of Fairfax, Virginia Department of Transportation Tysons Transportation: Planning, Analysis, and Design Projects Presented to: Transportation Committee,
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
County of Fairfax, Virginia Department of Transportation Fairfax Connector Bus Service Plans HOT Lanes and Dulles Rail Phase I Fairfax County Board of.
Tysons Corner Consolidated Transportation Impact Analyses (CTIAs)
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
Regional Routing Model Review: C) Model Formulation and Scenario Analysis Frank Southworth Oak Ridge National Laboratory Oak Ridge, TN NETS Program.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
1 Innovative Tools October 27, 2011 Chi Mai. 2 Presentation Overview VISSIM Corridors VISSIM Protocol Hours of Congestion.
0 - 0.
Addition Facts
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Monterey Branch Line Association of Environmental Professionals and American Planning Association July 28, 2010.
Using the Parkride2.mac Macro to Model Park and Ride Demand in the Puget Sound Region 22 nd International Emme Users Conference September 15-16, 2011,
Parsons Brinckerhoff Chicago, Illinois GIS Estimation of Transit Access Parameters for Mode Choice Models GIS in Transit Conference October 16-17, 2013.
TRB National Transportation Planning Applications Conference Columbus, OH May 2013 Estimating Bus and Rail Travel Times For Transit Corridor Studies Presented.
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
West Michigan Transit Linkages Study Wednesday, June 4 th, :00 a.m. Grand Valley State University Kirkhof Center Conference Room 2266.
Los Angeles Bus Rapid Transit Tour Lessons Learned.
Division Avenue Bus Rapid Transit Project August 2012.
Integrated Approach to Area Master Planning in Jubail Industrial City
Greater Minnesota Transit Investment Plan PAC December 14, 2010.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
VARIABLE SPEED LIMIT DEPLOYMENT EVALUATION I-270/I-255 Traffic and Safety Conference May 12, 2010 Missouri University of Science and Technology and HDR.
1 presented to Policy Steering Committee presented by AC Transit May 15, 2009 East Bay Bus Rapid Transit.
Addition 1’s to 20.
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
Week 1.
1 Unit 1 Kinematics Chapter 1 Day
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
UATS Director’s Workshop Agenda April 30, 2001  Introduction (12:30 – 12:35)  Development Review and Mitigation (12:35 – 2:10) Break (2:10 – 2:15) 
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
GREATER NEW YORK A GREENER Travel Demand Modeling for analysis of Congestion Mitigation policies October 24, 2007.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
Norman W. Garrick Transportation Forecasting What is it? Transportation Forecasting is used to estimate the number of travelers or vehicles that will use.
May 2009 Evaluation of Time-of- Day Fare Changes for Washington State Ferries Prepared for: TRB Transportation Planning Applications Conference.
Miao(Mia) Gao, Travel Demand Modeler, HDR Engineering Santanu Roy, Transportation Planning Manager, HDR Engineering Ridership Forecasting for Central Corridor.
1 Using Transit Market Analysis Tools to Evaluate Transit Service Improvements for a Regional Transportation Plan TRB Transportation Applications May 20,
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
Rapid Transit System Steering Committee Meeting December 4, 2012.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Service Planning & Standards Unit 4: Service Planning & Network Design.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
Regional Priority Bus Transit Conference June 24, 2009.
Purpose To develop and evaluate a range of transit and transportation alternatives throughout the MPO area, considering: u Regional Goals and Objectives.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
FlexBRT Project Briefing. Background Feasibility Study began in – $750,000 TEA-21 Grant to study an ITS Circulator in North Orange County/South.
1 Presentation to TAC May 20, 2009 Priority Corridor Network (PCN) Evaluation Project Introduction.
TPB CLRP Aspirations Scenario 2012 CLRP and Version 2.3 Travel Forecasting Model Update Initial Results Ron Kirby Department of Transportation Planning.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
Integrating Transit and Highway Solutions In High Volume Corridors
Finance Committee & City Council October 10, 2016
Bus Rapid Transit Study
Capital Trade-Offs Evaluated three major capital expenditure scenarios
Presentation transcript:

Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012

Tysons Tysons Circulator Study 1. The Comprehensive Plan for the Tysons Corner Urban Center calls for a System of Circulators in Tysons Corner to: A.Provide quick and convenient access for Metrorail passengers to and from locations within Tysons but beyond walking distance from the Metrorail Stations, and B.To provide a quick and convenient way to travel within Tysons. Background:

Tysons Tysons Circulator Study 2. Follow-on motion 11 specifically pertains to the Circulator Study and directs staff to issue an RFP for the circulator study and to bring the results of that study to a future Board Transportation Committee Meeting for discussion. 3. An RFP for the Circulator Study was issued in December of 2010 and the contract was awarded to a team lead by AECOM in March of Background:

Tysons Study Purpose LONG RANGE (2050) Planning study to support Tysons Corner redevelopment and rezoning process – Design circulator system to support goal of maximizing transit trips/minimizing auto trips Identify needed transit preferential treatments – Support a reliable and effective circulator system – Identify required expansion of right of way – may require additional adjacent land 4 Tysons Circulator Study

Tysons Planning Process Peer analysis of circulator systems in other cities Project goals and objectives Network development process Long range ridership forecasts Transit preferential treatments Mode options Operating and capital costs Finalize recommendations 5

Tysons Network Development Process Five preliminary networks developed initially – Based on sound route design principles – Long range design based on 2050 forecasted conditions – Evaluated based on number and percentage of trips beginning/ending within ¼ mile of each network – Network #1 and Network #2 selected for more detailed evaluation 6

Tysons 7 Network #1: Three Route Network

Tysons 8 Network #2: Four Route Network

Tysons Ridership Forecasts Utilize regional forecasting model – reflect 2050 conditions Four key variables impact ridership – Service frequency – Circulator fare – Parking cost – Travel time (speeds) 9

Tysons Ridership Forecasts Two ridership scenarios 10 Scenario #1Scenario #2 Frequency6 minutes peak, 10 minutes off-peak 4 minutes peak, 6 minutes off-peak Fare$1.00No fare Parking CostsHigher than Tysons currently – reflects costs in Wilson Boulevard Corridor Travel SpeedsBased on Lower Level of Dedicated Transit Lanes Based on Higher Level of Dedicated Transit Lanes

Tysons Ridership Forecasts Scenario #1 (Mid-range variables) Scenario #2 (Aggressive variables) 11 NetworkTotal RidershipTransfer from Metrorail Non-Metrorail Riders Network #117,6006,20011,400 Network #216,6007,4009,100 NetworkTotal RidershipTransfer from Metrorail Non-Metrorail Riders Network #133,70012,30019,400 Network #233,30014,40018,900

Tysons Detailed Network Evaluation Evaluation criteria – Daily ridership – Boardings per revenue hour – Operating cost per rider – Capital cost per rider – Circulator travel time between select origins/destinations – Change in transit mode share 12

Tysons Detailed Network Evaluation The three route network performed better than then four route network on most of the key evaluation results. Ridership estimates were close between the two options. Preliminary Staff Recommended Network – Three Route Network 13 Three Route Network Four Route Network Ridership X ProductivityX Operating Cost per RiderX Capital Cost Per RiderX

Tysons Mode Evaluation Purpose: 14 To identify the most appropriate transit mode for each route within the selected circulator network.

Tysons Mode Evaluation Based on: 15 Projected ridership, Capacity of Mode, Headway requirements, Right of way requirements, Roadway congestion levels along each route, Constructability of required, infrastructure to support each mode, Impacts of selected mode on other modes sharing the roadway network, and Maintenance facility requirements

Tysons Mode Evaluation Modes evaluated: 16 Streetcar Bus (40 and 60 lengths) Driverless Personal Rapid Transit

Tysons Mode Evaluation Mode Recommended: 40 and/or 60 Bus 17 Sufficient capacity to meet ridership demand can be achieved on all routes, under both networks, through the use of a 40 or 60 bus. Lower capital and operating costs. Greater flexibility to be re-routed as required.

Tysons Transit Preferential Treatments Types – Dedicated transit lanes – Queue jumps – Transit signal priority Factors considered – Level of congestion (speed) – Queue length at intersections – Transit vehicle volumes – Person carrying capacity 18

Tysons Identified Areas for Exclusivity 19

Tysons Next Steps Select final network Finalize transit preferential treatment recommendations, as appropriate Calculate costs Refine ridership forecasts – final network Complete final report in July 2012 Recommend Relevant Changes to Comprehensive Plan Begin process to secure funding 20

Tysons Questions 21