Parallel Flow Visualization/Mitigation Proposal

Slides:



Advertisements
Similar presentations
2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Advertisements

1 Market Flow Threshold Field Test NERC ORS Meeting November 14 th and 15 th.
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 20, 2013.
Parallel Flow Visualization and Flowgate Allocations Equity Concerns of Non-Market Transmission Owners Equity Concerns of Non-Market Transmission Owners.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair May 17 th, 2012.
Business Practices Subcommittee Update October 23, 2012 DRAFT.
Business Practices Subcommittee Update August 17, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair November 9 th, 2011.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
©2005 PJM 1 Redispatch Credit NERC/NAESB TLR Task Force Feb 2-3, 2005 Houston, Texas Operations Reliability Subcommittee Feb 8-9, 2005 Scottsdale, AZ.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
Business Practices Subcommittee Update October 26, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair April 4 th, 2012.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
Business Practices Subcommittee Update April 30, 2012.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
IDCWG Update. September 2013 December 2013 February 2014 April 2014 July 2014 Data Submission WEQ 008 Assessment CO 283 Report GTL CO’s Draft CO’s Development.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee
Peak RCCo Performance Metrics Draft –November 2013.
Business Practices Subcommittee Update May 4, 2010.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
Business Practices Subcommittee Update Executive Committee Meeting October 20, 2015.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Standards Review Subcommittee Update August 17, 2010.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update Yasser Bahbaz IDCWG Chair BPS Update September 13 th, 2011.
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Business Practices Subcommittee Update October 27, 2009.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
BPS First-To-Curtail/Last-To-Curtail Sub Team Conference Call October 05, 2011.
Business Practices Subcommittee Update August 16, 2011.
Business Practices Subcommittee Update Executive Committee Meeting February 23, 2016.
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Interchange Distribution Calculator Working Group (IDCWG) Update
Market Flow Threshold Field Test
Business Practices Subcommittee Update
Business Practices Subcommittee Update
Business Practices Subcommittee Update
Pseudo-tie business procedure
Mgr. Interconnection Reliability Initiatives
Market Flow Threshold Field Test
Exit Capacity Substitution and Revision
Two-Tier Firm Curtailment Overview
NERC Congestion Management
Assigned to the WEQ OASIS and BPS Subcommittees
Pseudo-tie business procedure
Presentation transcript:

Parallel Flow Visualization/Mitigation Proposal NERC OC Meeting June 9, 2009

Parallel Flow Proposal Major Topics Major issues being address by parallel flow proposal. Parallel flow proposal description. Parallel flow proposal business case. NERC involvement in parallel flow proposal. NAESB involvement in parallel flow proposal. Parallel flow proposal status report to NERC OC.

Major Issues Being Addressed by Parallel Flow Proposal This is a follow-up status report to the presentation given at the Sept 11, 2008 NERC OC meeting. Replacing the current native and network load (NNL) calculation made in the IDC with the reporting of near real-time flows addresses three major issues: NNL calculation made in IDC is used when TLR 5 is called (firm curtailments). Use of static data in NNL calculation produces questionable results, delays in calling TLR 5 and allows no after-the-fact reviews. RCs in EI lack visualization as to the source and magnitude of parallel flows when they experience congestion. IDC NNL calculation currently assumes all GTL impacts are firm and can only be curtailed on a pro-rata basis during TLR 5.

Parallel Flow Proposal Description RCs would report their GTL impacts to the IDC on a real-time basis or make arrangements to have someone report on their behalf. The IDC would indicate the source of all flows on a flowgate and the priority of these flows (tag impacts, GTL impacts and market flow impacts). An RC experiencing congestion would have visualization of the magnitude and source of all flows affecting their flowgate using information from the IDC. An RC experiencing congestion would request an amount of flow reduction that would be processed by the IDC. A relief obligation would be issued to all parties contributing to the loading. NAESB will establish methodology for assigning the GTL flows into the appropriate buckets.

Parallel Flow Proposal Business Case A parallel flow visualization/mitigation business case was requested during a July 9, 2008 NERC RCWG conference call: The RCWG would like the business case to include the IDC changes that are needed as well changes that the RCs would need to make to support the proposal. The RCWG would like the business case to quantify the monetary benefits of having improved reliability due to RC visualization and the monetary benefits of having more timely and improved NNL calculations from the IDC. Business case sent to NERC RCWG and IDCWG on Feb 9, 2009: Because it contains the details of vendors proposals, considered confidential information that cannot be shared with public. Midwest ISO, PJM and SPP do not consider the cost estimate to be excessive and have offered to pay the one-time cost of IDC CO 283 (below $100k) to move the proposal forward. An estimate of monetary benefits was not included in the business case due to the relatively low cost of the project and the difficulty of assigning a monetary value to the benefits of increased reliability, improved visualization and more timely TLR.

NERC Involvement in Parallel Flow Proposal NERC ORS held a dedicated meeting on April 2, 2009 to review the parallel flow proposal. Instances where a lack of visualization has created reliability problems in the past were presented, the details of the vendor proposals included in the business case were discussed and issues/concerns raised by the NERC ORS were addressed. At the May 6, 2009 NERC ORS meeting, a comprehensive parallel flow motion was approved (see attached motion). It provided directions to the IDCWG to develop a final set of requirements, to seek revised vendor cost estimates and to prepare a recommendation that will be reviewed at the NERC ORS Nov 2009 meeting. The NERC IDCWG met on June 3rd – 4th where they reviewed the parallel flow proposal. They will have a separate meeting on July 9th to develop technical requirements.

NAESB Involvement in Parallel Flow Proposal NAESB 2008 Annual Plan included a line item on Future Path of TLR. Part of this line item is to address the priority of GTL impacts reported to the IDC. This line item was carried forward to the 2009 Annual Plan. Before the NAESB BPS will move forward on this initiative, they wanted an indication that the NERC ORS supported this proposal as an IDC tool enhancement. The NAESB BPS has an agenda item at their June 16th meeting where they will develop a project plan that will address the annual plan item.

Parallel Flow Proposal Status Report to NERC OC This is an information only report and there is no action being requested of the NERC OC at this time. The NERC ORS will have a recommendation for the NERC OC to act on following the Nov 2009 NERC ORS meeting. Expect that the NERC IDCWG will respond to the NERC ORS directive to have a vendor recommendation that will be reviewed at the Nov 2009 NERC ORS meeting. Expect that the NAESB BPS will address the line item in the 2009 Annual Plan by developing a method to prioritize GTL impacts that are reported to the IDC. Midwest ISO has been working with the NERC OC Chair and NERC staff to include proposal costs in NERC 2010 budget.

Parallel Flow Visualization/Mitigation Proposal Attachment

Parallel Flow Proposal Motion Approved on May 6, 2009 . . . moved that the ORS agrees that the future use of GTL impacts, as identified in the MISO, PJM, and SPP “Generation-to-Load Reporting Requirements” white paper, will improve visibility and as such will enhance reliability of the Eastern Interconnection.  The ORS believes the IDC should be modified to accept GTL calculations.  The GTL impact calculation should be consistent for all EI RCs and, as such, a single vendor should be selected to implement the methodology and to perform the actual calculations for all EI RCs.  These changes are intended to provide information only at this point (i.e. providing the calculated GTL impacts without changing the functionality of the tools) until the ORS agrees that it is appropriate to utilize the additional data to enhance tool processes or possible changes to TLR procedures.  It is recognized that any changes to the TLR process to utilize the additional data made available as a result of this initiative will be determined preferably by the existing joint NAESB/NERC TLR SDT.  Industry support will be critical to the success of this initiative and will be best achieved by ensuring appropriate industry input and transparency in the decisions taken.

Parallel Flow Proposal Motion Approved on May 6, 2009 The ORS directs the IDCWG to take the following actions: Identify the minimum data set required to achieve the required calculations by the September 2009 ORS meeting. Identify the required changes to the IDC to identify the GTL impacts Recommend a vendor to perform the GTL calculations for all EI RCs Determine, in cooperation with the vendor, the GTL calculation methodology. Identify to the ORS any additional items that are required to incorporate GTL impacts. The IDCWG should target having proposed recommendations to the ORS for the November 2009 meeting. The GTL impacts should be archived in the IDC for an initial period of 12 to 18 months to allow analysis to be performed to assess the potential impact of any proposed changes to the TLR process including the possible use of near real time data for NNL calculations and possible use of near real time data for other TLR calculations as determined by NAESB.  Process changes may be incorporated before the completion of the analysis period if the ORS determines it is appropriate.

Parallel Flow Proposal Motion Approved on May 6, 2009 In addition, the NERC ORS will develop reliability metrics to confirm that the Generation-to-Load calculation is an improvement in accuracy over the static NNL calculation which must be met before changing to using the Generation-to-Load calculated impacts for TLR.