Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair May 17 th, 2012.

Slides:



Advertisements
Similar presentations
NAESB BPS Yasser Bahbaz– IDCWG Chair June 20 th, 2013.
Advertisements

2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
1 Market Flow Threshold Field Test NERC ORS Meeting November 14 th and 15 th.
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
11 OASIS Subcommittee - Notification Task Force UPDATE May
Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 20, 2013.
Standards Review Subcommittee Update February 19, 2013.
Business Practices Subcommittee Update October 23, 2012 DRAFT.
Interchange Distribution Calculator Working Group (IDCWG) Update Jim Busbin IDCWG Chairman NAESB WEQ BPS Meeting Minneapolis, Minnesota November 10-11,
Standards Review Subcommittee Update April 30, 2013.
Parallel Flow Visualization/Mitigation Proposal
Business Practices Subcommittee Update August 17, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair November 9 th, 2011.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
©2005 PJM 1 Redispatch Credit NERC/NAESB TLR Task Force Feb 2-3, 2005 Houston, Texas Operations Reliability Subcommittee Feb 8-9, 2005 Scottsdale, AZ.
1 Credit for Redispatch Small Group Review of Unconstrained MFs NAESB BPS Meeting December 14-15, 2011.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
Business Practices Subcommittee Update October 26, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair April 4 th, 2012.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
Business Practices Subcommittee Update April 30, 2012.
North American Energy Standards Board Upadate Presented by Bob Harshbarger.
Interchange Scheduling and Accounting Subcommittee Update WECC OC Meeting June 2009 Salt Lake City, Utah Marilyn Franz ISAS Chair.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
FERC Order minute Scheduling.
Copyright © 2008 Cengage Learning Understanding Generalist Practice, 5e, Kirst-Ashman/Hull 316.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
IDCWG Update. September 2013 December 2013 February 2014 April 2014 July 2014 Data Submission WEQ 008 Assessment CO 283 Report GTL CO’s Draft CO’s Development.
UFMP methodology changes in the updated webSAS February 2015 A video presentation reviewing the webSAS UFMP methodology changes going into effect March.
Joint Electric Scheduling Subcommittee Update August 20, 2013.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee
Business Practices Subcommittee Update May 4, 2010.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Business Practices Subcommittee Update Executive Committee Meeting February 24, 2015.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
Business Practices Subcommittee Update Executive Committee Meeting October 20, 2015.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Standards Review Subcommittee Update August 17, 2010.
Joint Electric Scheduling Subcommittee Update February 18, 2014.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update Yasser Bahbaz IDCWG Chair BPS Update September 13 th, 2011.
Joint Electric Scheduling Subcommittee Update April 29, 2014.
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
BPS Two-Tier Curtailment Sub Team Sep 23, 2011 Conference Call Sub team members- – Chris Advena, Art Wolfe, Mike ColbyPJM – Nelson Muller, OATI – Steve.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Business Practices Subcommittee Update October 27, 2009.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
BPS First-To-Curtail/Last-To-Curtail Sub Team Conference Call October 05, 2011.
Business Practices Subcommittee Update August 16, 2011.
Business Practices Subcommittee Update Executive Committee Meeting February 23, 2016.
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update
Market Flow Threshold Field Test
Business Practices Subcommittee Update
Interchange Distribution Calculator Working Group (IDCWG) Update
Business Practices Subcommittee Update
Business Practices Subcommittee Update
Impact Calculation – BPS Issues
Market Flow Threshold Field Test
NERC Congestion Management
Standards Review Subcommittee Update
Presentation transcript:

Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair May 17 th, 2012

IDCWG Update Meetings/Conference Calls IDC Change Order Updates GTL Update

Meetings/Conf Calls March, CO 283/GTL Workshop– Not a formal IDCWG meeting – Calculation Testing Conference Calls – April 4 th, April 13 th. May 16 – 17 th Atlanta GA (NERC) - BPS Joint Meeting August 15 th – 16 th (MISO, St Paul) October 16 th (8 – 5) – 17 th (8 – 12), Las Vegas (Customer Meeting)

Implemented CO 317: Michigan PAR Status Change Switch. CO 331: IDC Interface to NAESB Web Registry CO 333: Include MF and NNL on TLR Event History Display CO 338: Default Timing for TLR Levels 1 and 0 CO 340: Effective Date on Market Coordinated Flowgates CO 341: MISO and PJM ED6/7FN Transfer to IDC SDX CO 08: Remaining GUI Changes SDX CO 10: Change Filtering Options on Displays

Development/Testing CO 322: PFV Generation Priority Submissions Will be moved to development once a final methodology is reached at BPS. Will be revised as needed. CO 330: Authorization of OATI Use of IDC Data for DOE Studies CO 332: Changes to Manitoba EAR Tag in IDC Approved for implementation - June 1 st CO 336: Changes to IDC Factor Calculation Timing This will be moved for development if deemed need after an evaluation on the behavior of status changes is completed by IESO and MISO - Cancelled

Development/Testing CO 346: TLR Auto Acknowledgment IDC will be modified in such a way that each sink impacted Reliability Coordinator can set up to automatically acknowledge the TLR actions based on configurable time intervals after a new TLR instance CO 347: IDC TLR Data Request for New York Transmission Owners

DRAFT/Evaluation CO 326: PFV Metrics Maybe revised after a final methodology is reached at BPS. CO 328: Intra Hour Tag Curtailment IDCWG has proposed and approved for evaluation a different solution than previously drafted and evaluated.

IDCWG Update GTL Update

IDCWG Update Change Order 283 Status

IDCWG Update During the GTL Workshop, OATI went over the calculation methodology of CO 283. Certain calculation inconsistencies were identified and OATI is working on a fix. Several GUI enhancements were identified and will be worked on once the final methodology is reached and work is resumed on IDCWG and OATI end on the project.

IDCWG Update IDCWG is awaiting the whitepaper (methodology) to be made final, after which development of GTL Change Orders and the GTL application.

IDCWG Update