Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.

Slides:



Advertisements
Similar presentations
2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Advertisements

1 Market Flow Threshold Field Test NERC ORS Meeting November 14 th and 15 th.
Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 20, 2013.
Parallel Flow Visualization and Flowgate Allocations Equity Concerns of Non-Market Transmission Owners Equity Concerns of Non-Market Transmission Owners.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair May 17 th, 2012.
Business Practices Subcommittee Update October 23, 2012 DRAFT.
Interchange Distribution Calculator Working Group (IDCWG) Update Jim Busbin IDCWG Chairman NAESB WEQ BPS Meeting Minneapolis, Minnesota November 10-11,
Parallel Flow Visualization/Mitigation Proposal
Business Practices Subcommittee Update August 17, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair November 9 th, 2011.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
NAESB Coordinate Interchange
1 Credit for Redispatch Small Group Review of Unconstrained MFs NAESB BPS Meeting December 14-15, 2011.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
Business Practices Subcommittee Update October 26, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair April 4 th, 2012.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
Business Practices Subcommittee Update April 30, 2012.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Operating Reserves --- Again A Discussion Primer
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Pseudo-Tie Reservations
NERC LTRA Update / CDR Capacity Counting Issues
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Joint Electric Scheduling Subcommittee Update August 20, 2013.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee
Peak RCCo Performance Metrics Draft –November 2013.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
Business Practices Subcommittee Update May 4, 2010.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Standards Review Subcommittee Update August 17, 2010.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update Yasser Bahbaz IDCWG Chair BPS Update September 13 th, 2011.
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Business Practices Subcommittee Update October 27, 2009.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
Standards Review Subcommittee Update August 18, 2015 Chair Rebecca Berdahl, BPA.
1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Interchange Distribution Calculator Working Group (IDCWG) Update
Interchange Distribution Calculator Working Group (IDCWG) Update
Business Practices Subcommittee Update
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Business Practices Subcommittee Update
Pseudo-tie business procedure
Standard Review Subcommittee Update
Two-Tier Firm Curtailment Overview
NERC Congestion Management
Assigned to the WEQ OASIS and BPS Subcommittees
Pseudo-tie business procedure
Presentation transcript:

Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim Busbin Chairman, IDC Working Group

Parallel Flow Visualization Presentation Topics Presentation Topics PurposeBackground Data Requirements Data Archive IDC Change Order 283, Revision 2

Parallel Flow Visualization Purpose

Parallel Flow Visualization Purpose The Purpose Statement from the Parallel Flow Visualization SAR states: The requested enhancements to the TLR procedure in the Eastern Interconnection will improve the wide-area view of Reliability Coordinators (RCs) such that they better understand the current operating state of the bulk electric system and will result in the assignment of relief obligations during periods of congestion that are more representative of those actually contributing to the congestion.

Parallel Flow Visualization Background

Parallel Flow Visualization Background May 6 NERC ORS Meeting in Indianapolis, IN. IDCWG was directed to: Identify the minimum data set required to achieve the required calculations by the September 2009 ORS meeting Identify the required changes to the IDC to identify the GTL impacts Recommend a vendor to perform the GTL calculations for all EI RCs Determine, in cooperation with the vendor, the GTL calculation methodology Identify to the ORS any additional items that are required to incorporate GTL impacts The IDCWG should target having proposed recommendations to the ORS for the November 2009 meeting

Parallel Flow Visualization Background IDCWG has discussed and identified requirements to support Parallel Flow Visualization – we continue to evaluate these requirements June 3-4 IDCWG Meeting: Discussed charge given by ORS Initiated identification of requirements July 8-9 IDCWG Meeting: Meeting held to discuss Parallel Flow Visualization Identification of requirements continued August IDCWG Meeting OATI asked to revise Change Order 283 to include requirements identified in July meeting – this modification will become Revision 2

Parallel Flow Visualization Data Requirements

Parallel Flow Visualization Data Requirements Introductory Notes Reference: Generation-to-Load Reporting Requirements whitepaper, January 2, 2009 Generation-to-load flows will be calculated by one vendor. Raw data used in the calculation will be submitted to the vendor Frequency of all data submission will be every fifteen minutes unless otherwise noted by (). Data will be submitted to reflect current-hour conditions and a projection of peak next hour conditions. To be clear, each data submission will contain data for the present hour and also for the next hour

Parallel Flow Visualization Data Requirements Categories Load and Losses Real Time Load Magnitude and Distribution Real Time Load Magnitude and Distribution Generation Output Real-Time Output vs. Static Values Real-Time Output vs. Static Values Flowgate Flows Provides Error Checking Capability Provides Error Checking Capability Topology Updates Provides More Frequent Update of Topology and Provides More Frequent Update of Topology and Additional Data

Parallel Flow Visualization Data Requirements Load and Losses Load and Losses Total Real-Time BA Load Geographic Zones Geographic Zones Conforming / Non-Conforming Zones Conforming / Non-Conforming Zones Individual Bus Loads Individual Bus Loads and Total for BA and Total for BA Real-Time Losses for Total BA Projection of Next Hour Total Peak BA Load Geographic Zones Geographic Zones Conforming / Non-Conforming Zones Conforming / Non-Conforming Zones Individual Bus Loads Individual Bus Loads and Total for BA and Total for BA Projection of Next Hour Losses for Total BA

Parallel Flow Visualization Data Requirements Generation Output Generation Output Real-Time Generation Output Output for Each Generating Unit Shown in Model Output for Each Generating Unit Shown in Model Net of Auxiliary Equipment / As Modeled Net of Auxiliary Equipment / As Modeled Total Real-Time Generation Output for BA Projected Next Hour Generation Output Output for Each Generating Unit Shown in Model Output for Each Generating Unit Shown in Model Projected Maximum Output of Unit in Next Hour Projected Maximum Output of Unit in Next Hour Net of Auxiliary Equipment / As Modeled Net of Auxiliary Equipment / As Modeled Total Projected Next-Hour Generation Output for BA Generating Unit Real-Time Upper and Lower Normal Limits Joint Ownership Identification Joint Ownership Identification

Parallel Flow Visualization Data Requirements Flowgate Flows Flowgate Flows Actual real-time flow on each active flowgate monitored element shown in the Book of Flowgates Projection of next hour maximum flow on each active flowgate monitored element shown in the Book of Flowgates Projection of Next Hour Losses for Total BA Actual real-time flow on each active flowgate contingency element shown in the Book of Flowgates Projection of next hour maximum flow on each active flowgate contingency element shown in the Book of Flowgates Un-accounted for usage will be identified and calculated as the difference between real time flows and the summation of calculated tag impacts, market flows and generation-to-load flows

Parallel Flow Visualization Data Requirements Topology Updates Topology Updates Increase frequency of IDC update from SDX and matrix calculation to every fifteen minutes Outage updates submitted to SDX every fifteen minutes

Parallel Flow Visualization Data Requirements Additional Data Additional Data Control Device Data – Scheduled and Actual Flows, Real-Time and Projected Next Hour: Phase shifting transformers Phase shifting transformers DC lines DC lines Variable frequency transformers Variable frequency transformers Dynamic Schedules – Actual and projected next-hour flows Identification of pumped storage hydro units Identification of pumped storage hydro units

Parallel Flow Visualization Data Requirements Additional Data Additional Data (NAESB / United States) – Designated Network Resource (DNR) generating units/plants (NAESB / United States) – DNR capacity (NAESB) Assignment of priorities for generation-to-load (7-F versus 6-NN) Net scheduled interchange Net actual interchange Individual actual tie-line flows

Parallel Flow Visualization Data Archive

Parallel Flow Visualization Data Archive Impact archive will be added that saves Tag impacts Tag impacts Market flows Market flows Generation to load flows Generation to load flows Un-accounted for usage Un-accounted for usage Real-time flows by flowgate Real-time flows by flowgate Archive to run around the clock – not just when a flowgate is in TLR Suggest current calendar years and previous years data be available on line Suggest previous three years data be available off-line

Parallel Flow Visualization IDC Change Order 283, Revision 2

Parallel Flow Visualization