Laboratoire Commun CEA/DSM-CNRS/IN2P3 Orsay June 4 th 2004 M-H MoscatelloHigh Intensity Stable Beams HIGH INTENSITY STABLE BEAMS -Available beams at GANIL.

Slides:



Advertisements
Similar presentations
? Nuclear Reactions Categorization of Nuclear Reactions
Advertisements

(not visible on the picture)
FAIR accelerator R&D Oliver Kester GSI Helmholtzzentrum für Schwerionenforschung Darmstadt and IAP Goethe-Universität Frankfurt.
Paris, November 2004 M. Lewitowicz NuPECC meeting Physics case of SPIRAL 2 and EURISOL SPIRAL2 and EURISOL facilities Available Beams Physics Case Conclusions.
The High Intensity Stable Ion Beams Working Group HISIB-WG
Report from: the High Intensity Stable Beam Working Group HISB-WG Marie-Helene Moscatello (GANIL) Annamaria Porcellato (Legnaro) Uli Ratzinger (GSI) Faical.
Dominique Guillemaud Mueller
NuPECC meeting, Orsay, March 12, Researchers Engineers, Technicians, Administrative IN2P3INSUSPMSPISTICSCSDVSHS Nuclear Particle Universe.
JYFL-Jyväskylä K=130 AVF Cyclotron. JYFL Ion Sources 6.4 GHz ECR 14 GHz ECR Multicusp H - source.
EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study OUTCOME FROM THE PROJECT ACTIVITY in the period 20 March- 8.
Future prospects and needs for nuclear structure studies with high intensity stable beams.
Towards a neutron target and Measuring (n, ɣ) cross sections of the r-process Lothar Buchmann TRIUMF.
1 IUPAP-WG.9 Symposium at TRIUMF on N.P. Nuclear Physics Long Range Plan in CAS I.Introduction II.Plan of Big Scientific Facilities 1.Heavy Ion Advanced.
Institut für Angewandte Physik LINAC AG H. Podlech 1 MYRRHA Injector Design and Related R&D 2 nd Open Collaboration Meeting on Superconducting Linacs for.
RFQ development for high power beams
MYRRHA Injector at UCL Dirk Vandeplassche Luis Medeiros Romão SCK CEN MAX International Design Review Brussels, November 2012 Dirk Vandeplassche,
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Development of the FLNR Cyclotron Complex /2009 Priority 1 Dubna,
Cyclotron Refurbishing & Development Meeting March 6, 2008.
1 Project X Proton Driver David Neuffer September 2011.
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
SYNTHESIS OF SUPER HEAVY ELEMENTS
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
A proposal for a polarized 3 He ++ ion source with the EBIS ionizer for RHIC. A.Zelenski, J,Alessi, E.Beebe, A.Pikin BNL M.Farkhondeh, W.Franklin, A. Kocoloski,
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
ISIS Accelerator Division
CW neutron source Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus Alonso, Lali Tchelidze 6/30/11 Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus.
Ion Accelerator Complex for MEIC January 28, 2010.
IWAA R. BEUNARD – September 13-17, 2010 – DESY, Hamburg, Germany 1  20m Rémy Beunard A. Lefevre, F. Legruel GANIL, CAEN, FRANCE The 11th INTERNATIONAL.
Accelerator technique FYSN 430 Fall Syllabus Task: determine all possible parameters for a new accelerator project Known: Scope of physics done.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Page 1 Rencontre de Moriond, March RIB production with SPIRAL 2 1.Versatile and evolutive 2.Fission fragments with D beamGoal > fissions/s.
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
A facility for Nuclear, Atomic, Material and Radiobiology Sciences. Delivering stable (from C to U) and radioactive ions (from He to Xe) in the energy.
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
JINR PAC, Dubna, G. Gulbekian Status of the DRIBs III Project cyclotron DC280 new experimental hall (SHE factory) cyclotron U400R reconstruction.
February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.
F Project X Overview Dave McGinnis October 12, 2007.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Radioactive ion beam production at other facilities
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Coseners meeting Sept Future of European ISOL Peter Butler.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Jean-Luc Biarrotte, SPL HOM Workshop, CERN, June 25-26, A few longitudinal BBU simulations (in the SPL case) J-Luc Biarrotte CNRS, IPN Orsay.
Warm and Cold Ion Linac: Comparison and Optimization March 30, 2015.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
Laboratoire commun CEA/DSM - CNRS/IN2P3 M. Di Giacomo – CWRF10 1 CWRF th of Mai Barcelona SPIRAL 2 RF SYSTEMS Status report Marco DI GIACOMO.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
Superconducting Magnet, SCRF and Cryogenics Activities at VECC *, Kolkata Shekhar Mishra Rakesh Bhandari *Department of Atomic Energy, Government of India.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
Ion Accelerator Activities at VECC
MLL Workshop on Future Science 2019 and beyond, 16.Dec.2015 The accelerator, as seen by.. 1 From LBNL Image Library Collection by Dave Judd and Ronn MacKenzie.
Status of SCRF Accelerator Activities at CEA-Saclay
Hosting Orsay Walid KAABI
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Nuclear Physics in France
ADS Accelerator Program in China
Progress towards Pulsed Multi-MW CERN Proton Drivers
Z6 experiments and necessary beam parameters
Pulsed Ion Linac for EIC
Rare Isotope Spectroscopic INvestigation at GSI
DESIGN OF THE HWR CAVITIES FOR SARAF
Physics Design on Injector I
Rare Isotope Spectroscopic INvestigation at GSI
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
Rare Isotope Spectroscopic INvestigation at GSI
Presentation transcript:

Laboratoire Commun CEA/DSM-CNRS/IN2P3 Orsay June 4 th 2004 M-H MoscatelloHigh Intensity Stable Beams HIGH INTENSITY STABLE BEAMS -Available beams at GANIL -Ongoing R&D -Needed R&D -Spiral2 project

Laboratoire Commun CEA/DSM-CNRS/IN2P3 Orsay June 4 th 2004 M-H MoscatelloHigh Intensity Stable Beams Towards experimental areas Available stable beams at Ganil CSS1 beams: from 12 C (4 to 13.5 A.MeV) to 238 U (4 to 8 A.MeV) intensities: several p A for light ions 40 possibility of simultaneous beams in SME and HE experimental areas (using a stripper) CIME beams: from He to Xe a few pnA between 2 and 25 A.MeV depending on q/A

Laboratoire Commun CEA/DSM-CNRS/IN2P3 Orsay June 4 th 2004 M-H MoscatelloHigh Intensity Stable Beams Ongoing R&D: Ion production methods: development of Ni, Ca, Ge… Needed R&D: If necessary, possibility of increasing the intensity of light ions, by adding a rebuncher at the entrance of the C01 injector cyclotron (the light ion intensity limitation is due to space charge effects near the cyclotron injection) Targer development needed for low energy ion beams (Coulomb barrier) and several kWatts thermal power

Laboratoire Commun CEA/DSM-CNRS/IN2P3 Orsay June 4 th 2004 M-H MoscatelloHigh Intensity Stable Beams Spiral2 project

Laboratoire Commun CEA/DSM-CNRS/IN2P3 Orsay June 4 th 2004 M-H MoscatelloHigh Intensity Stable Beams Spiral2 project Spiral2: q/A=1/3 ions 1mA (Ar) from 0.75 to 14.5 A.MeV able to accelerate 5mA D + beam up to 20 A.MeV lower intensities avalaible (Cr, Ni,…) 2 nd step: q/A=1/6 ions 1mA (Xe) from 0.75 to 6.5 MeV/A

Laboratoire Commun CEA/DSM-CNRS/IN2P3 Orsay June 4 th 2004 M-H MoscatelloHigh Intensity Stable Beams Spiral2 project Associated R&D: The accelerator is based on almost known technology (normal conducting RFQ, quarter-wave SC cavities for the SC linac, the couplers have to be developed for 10 to 20 kW/cavity (under design). The challenge is mainly the high intensity to be accelerated, without any losses -during the construction phase, development of high intensity q/A=1/3 beams like Cr, Ni with the GTS source (ex. SBT/CEA source) at Ganil -during the APD and construction phase, development of a new source (APHOENIX) that will produce 1mA beams with A as high as possible Needed R&D but not really identified yet in the frame of Spiral2: development of adapted targets, able to handle these beams (up to 40 kW beams)