19 July 2005Sajjad Zohir//MDG-Plans-Budgets1 Politics and Processes of National Planning and Budgeting in Bangladesh How far are these tuned to realize.

Slides:



Advertisements
Similar presentations
1 A Framework for Common Action around shared goals Presentation by Harald Lossack, GTZ on Behalf of OECD/DAC ENVIRONET PEP Meeting 15 June 2006.
Advertisements

Mutual accountability and aid transparency Mutual accountability and aid transparency Republic of Moldova 1IATI meeting, OECD Conference center.
1 Outcome of Mutual Accountability & Aid Transparency Survey: Bangladesh Monowar Ahmed Joint Secretary Aid Effectiveness Unit, ERD.
UNDP RBA Workshop on MDG-Based National Development Strategies Module 2: Technical Issues UN Millennium Project February 27-March 3, 2006.
MDGs Needs Assessment in Kenya Process, Experiences and Challenges George Anyango Ministry of Planning & National Development.
MILLENNIUM DEVELOPMENT GOALS IN ETHIOPIA Briefing for the Millennium Task Force by Mr. Antonius Broek, UNDP Ethiopia New York, 19 January 2004.
UNDP Regional Bureau for Africa MDG-based national Development Planning Training Workshop HIV/AIDS Assessments Dar Es Salaam February 27 - March 3, 2006.
PRESENTATION ON THE ZIMBABWE NATIONAL DEVELOPMENT AND POVERTY REDUCTION STRATEGY.
MDG based national development strategies and plans in Africa: the role of the Integrated Package of Services Presentation by BDP/BRSP at RBA Workshop.
Feb 27 - Mar 3, 2006GOG/UNDP1 Ghanas GPRS II/MDGs Processes and Experiences MDG-Based Development Planning Training Workshop in Dar-es-Salaam.
MDG Based National Development Planning Workshop Mozambique Experience Dar es Salaam, 27 Feb-3 March 2006.
MDG Needs Assessments. 2 Overview of the Millennium Project Mission: –To develop an operational framework that will allow.
ACHIEVING THE MILLENNIUM DEVELOPMENT GOALS IN KENYA
Opportunities and challenges to preparing national plans and budgets to achieve the Millennium Development Goals (MDGs): A perspective from UNDP Ethiopia.
Politics and Processes of preparing National Plans and Budgets to achieve the MDGs Learning Event for members of the Policy Network on the MDGs July 19.
MTEF BUDGET PROCESS – A TOOL FOR MAINSTREAMING MDGS
UNCT Planning Process in post crisis context DOCO training November 2008.
1 MDG Needs Assessment Process in Tajikistan Temur Basilia MDG Team Leader UNDP Tajikistan July 2005.
Delivering as One UN Albania October 2009 – Kigali.
Poverty Reduction Strategies: A tool for implementing the BPOA Linda Van Gelder The World Bank.
KYRGYZ REPUBLIC Programmatic Public Expenditure Review Monitoring and Evaluation The MOF/Donor Workshop on PPER Bishkek, September 26, 2005.
Environment & national PRSs - directions and dilemmas EPD Seminar Series May 2002.
1 PRSp Alignment Finnish Aid in a PRS Context Helsinki Workshop May 2003.
Session 1 UK Department of International Development.
1 Civil society participation in the Ethiopian PRSP process Finnish Aid in a PRS Context Helsinki Workshop May 2003.
Commonwealth Secretariat PRSP Learning Event 9 July 2003.
Water Policy Programme 1 Kampala Workshop February Synthesis of emerging issues/themes 1.Coordination Donors and NGOs (shared objectives) appropriate.
1 Session 3: Aid instruments and the PRSP Finnish Aid in a PRS Context Helsinki Workshop May 2003.
Harmonized support to scaling up the national AIDS response Ini Huijts 7 th June 2006 ODI meeting, London.
J. Finnish Aid in a PRSP context Helsinki workshop 19 th – 21 st May 2003 Day 3: Consultants & Researchers.
1 Gender Mainstreaming and Realizing Womens Rights (Nigeria) Bola Fajemirokun.
Role of CSOs in monitoring Policies and Progress on MDGs.
FTI AS A CATALYST FOR REFORM: Madagascars Experience October 13, th Annual NETF Seminar.
Challenging the Budget Creating Incentives for Results Rwandas Experience Elias Baingana - Budget Director.
Linkages Between NPoA and MTEF
THE PERSPECTIVE FROM THE SECTORS What would Sectors/Line Ministries (LMs) want from an MTEF? What would Sectors/Line Ministries (LMs) want from an MTEF?
Overview of concept of scaling-up George Laryea-Adjei UNICEF 21 July 2005.
Overview of the Global Fund: Guiding Principles Grant Cycle / Processes & Role of Public Private Partnerships Johannesburg, South Africa Tatjana Peterson,
SSATP ANNUAL MEETING 2010 Kampala, UGANDA OCTOBER 18-21, 2010 TRANSPORT STRATEGY UPDATING PROCESS IN BURKINA FASO Sub-Saharan Africa Transport Policy Program.
BANGLADESH EXPERIENCE PUBLIC FINANCIAL MANAGEMENT AND PR OCUREMENT A presentation for Concurrent Session on Public Financial Management and Procurement.
Poverty Reduction Strategy Papers (PRSPs) Overview and Next Steps Expert Group Meeting on MDGs and PRSPs Egypt, December 2004.
Presentation title goes here this is dummy text Joint Office : -What have we learned?- “Delivering as One” through Joint Programming and Joint Programmes.
GHANA: NPOA MONITORING AND EVALUATION Presented by Samuel Cudjoe APRM Ghana Workshop on Monitoring and Harmonizing the Zambian APRM NPOA with NDP and MTEF,
1 M&E SUPPORT TO PLANNING & BUDGET IN GHANA Presentation by CAPT. P.I DONKOR (rtd) National Development Planning Commission, Ghana.
Page 0 Agency Approaches to Managing for Development Results Why Results? What Results? Key Challenges, lessons learnt Core principles and draft action.
AGHD PRSP Learning Event Africa Great Lakes and Horn Department January 2002.
Consultative Group Meeting Marrakech, Morocco 10 – 11 November 2005.
Session 6 Strategy formulation and climate change prioritizing areas for climate action and funding, linkages to development priorities including poverty.
PRSP Process in the Western Balkans ECSPE: Presentation at SIDA 1 PRSP Process in the Balkans Current Status, The World Bank Support and Future Work Program.
Caribbean Community Secretariat 2nd meeting of the Advisory Group on Statistics San Ignacio – Belize 25 June 2008 Introduction and Objectives of NSDS day.
February 21, JAS Consultation between the Government of Tanzania and Development Partners February 21, 2006 Courtyard Hotel, Dar es Salaam.
Building Consensus while assessing the needs and preparing the National Development Strategy for in order to ensure universal primary education.
Country Ownership of the Ghana Poverty Reduction Strategy Paper Joint Donor Staff Training Module 1 – Session 2 Zambia, September 2004 Federico Steinberg.
International Development on Aid Effectiveness Presenter Said Muhammed Jama Aid Coordination Expert Ministry of National Planning and Development.
BCO meeting, Lusaka, July 2005 Overview of PRSPs.
PROCUREMENT IN PRSCs – Case of Uganda March 24-28, 2008 Playing a Key Role in achieving the Development Results Playing a Key Role in achieving the Development.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
Vito Cistulli - FAO -1 Damascus, 2 July 2008 FAO Assistance to Member Countries and the Changing Aid Environment.
Achieving the MDGs: RBA Training Workshop Module 2: Managing an Effective Process May 9-12, 2005.
Joint Assistance Strategy for Tanzania (JAST) Poverty Policy Week Creative and Hard Work, the Key to Fighting Poverty Presentation by the Ministry of Finance.
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
Selected Issues in PRSP Implementation The World Bank and The IMF Thessaloniki May 28, 2005.
Towards a Sector Wide Approach (SWAp) for water sector in Lesotho Prepared by T.W. Sepamo Principal Engineer Water and Sanitation. Prepared for EUWI –
Bangladesh Joint Country Assistance Evaluation: Assessing Total ODA at the Country Level Presentation to OECD DAC November 2006 Bruce Murray Director General.
Country Ownership of PRSPs: Experience in 4 countries Bolivia (EBRP 3/01) Ghana (GPRS 2/03) Kyrgyz Republic (NPRS 1/03) Senegal (DSRP 4/02)
The Ugandan Budget Process A Presentation to the Association of Budget Offices Conference Montreal, Canada 17th -19th June 2013 by Hon. Okot.
Medium-Term Expenditure Framework: Lessons
Linkages Between NPoA and MTEF
The role of the Passport Indicators in Monitoring PFM Strategy
Budget Community of Practice (BCOP)
Presentation transcript:

19 July 2005Sajjad Zohir//MDG-Plans-Budgets1 Politics and Processes of National Planning and Budgeting in Bangladesh How far are these tuned to realize MDGs? Sajjad Zohir presented at the Learning Event, July 2005, Rome

19 July 2005Sajjad Zohir//MDG-Plans-Budgets2 Basics National Plans are normally of five years – the sixth one covers and the one with PRS is meant to be for The three years revolving investment plans are no more in vogue – while these are expected to be replaced by MTEF, the latter is yet to surface Annual budgets remain annual and are going through changes MDGs remain longer term goals to which political leaders expressed their commitments, and the countrys first MDG progress report came out in early 2005

19 July 2005Sajjad Zohir//MDG-Plans-Budgets3 MDGs, Plans and Budgets MDGs Goals and Strategies Monitoring Indicators Budgets ? Plan/PRSP ? Or, do plans and budgets remain invariant to MDGs, and simply provide ex-post linkages?

19 July 2005Sajjad Zohir//MDG-Plans-Budgets4 MDG Process in Bangladesh Goals Targets Indicators (data) - Workshop in February 2004 drawing up plan of action for preparing 1 st MDG progress report -13 Technical Working Groups, NGOs & CBOs were included - Facilitated by UN system, with ERD the focal point Targets Interventions Needs Assessment - BIDS supports to global MP initiative - Costing education using SHD model under the 1 st MDGR

19 July 2005Sajjad Zohir//MDG-Plans-Budgets5 Planning Process Perspective Plan – participatory (during early 1990s) IPRSP – October 2003 to January divisional consultations on 12 sectors, 13 groups at national level –BRAC (a large NGO) was the event manager – WB, DfID and ADB were the key actors with contributions from consultants - with GED as the intended focal point End December early January 2004: Steering Committee for formulation of PRSP formed with Principal Secretary at the Prime Ministers Office as the Chairperson and Member, GED, as the Member-Secretary - the process was funded by GoB (GED was also named the national poverty focal point) 19 Thematic groups for the 19 ministries – while consultations on prioritizing activities were undertaken by GOB, reports were prepared by consultants Unlocking the Potentials: Poverty Reduction Strategies for Bangladesh is nearing completion

19 July 2005Sajjad Zohir//MDG-Plans-Budgets6 The Annual Budget Responsibility of the Finance Division, Ministry of Finance – relies mostly on in-house capacity Redefined accounting categories – recurrent and capital expenditures – introduced since FY 2005 Budgets of 4 ministries brought under MTBF/MTEF since FY A total of 15 will be targeted in the next budget Revenue and Development wings merged so that a single person may look into all aspects of a ministry Budget accounts are now in the process of being poverty and gender sensitized – with supports from FMRP Currently the MoF is in the process of developing the monitoring indicators – intention is to have PC participate in outcome/output monitoring and leave input monitoring to the line ministries

19 July 2005Sajjad Zohir//MDG-Plans-Budgets7 A Framework to Understand the Political Undercurrents Outcomes/ impacts at aggregate levels Output - includes impacts of sector-specific programs as well as total services delivered (may be divided further) Inputs (may be further divided) Subset of MDGs Strategies (subset of MDGs and some of the missing ones) Sector Plans / interventions Assessing resource needs and their costing GOB Budget/ MTEF/Needs Assessment GOB Planning Process Ministry of Planning Ministry of Finance Multilateral and bilateral development partners External Resource Division (ERD)

19 July 2005Sajjad Zohir//MDG-Plans-Budgets8 Selected Observations on the Politics Multiple perspectives across development partners – Un and the non-UN The legacy of differences between the Ministry of Finance and the Ministry of Planning – the imposed harmony with a single minister may not last long! Shortage of in-house capacity – across agencies Partial progress made in ensuring ownership by political leaders – yet a long way to go Voices of the people heard through consultations – but sustaining these at upper tiers of decision process prove difficult

19 July 2005Sajjad Zohir//MDG-Plans-Budgets9 Concluding Observations Politics of numbers, stakeholders interests and possible degeneration of numerical exercises on monitoring Reform of the budgetary process will most likely get completed – but establishing transparency may remain elusive – there may be gains by introducing elements of the MDG Needs Assessments in the exercise MDGs have contributed towards giving focus to national as well as donor plans – these need to be formally institutionalized Joint initiative from the two ministries is critical and the role of ERD needs revisiting At conceptual levels, the positions of UN and the non-UN development partners need to be harmonized