Projects. Intelligent Data Sets Project 3 year project ending December 31 2008 with a total budget of 2.7 mill USD –Funded by Research Council of Norway.

Slides:



Advertisements
Similar presentations
Major Influences on the Design of ODM Dan Chang (IBM) Elisa Kendall (Sandpiper) MDSW 2004.
Advertisements

The iRING Matthew West Information Junction R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y ids-adi.org.
United Nations Spatial Data Infrastructure Dr Kristin Stock Social Change Online and Centre for Geospatial Science, University of Nottingham.
Database Planning, Design, and Administration
Applying the Human Views for MODAF to the conception of energy-saving work solutions Dr Anne Bruseberg Systems Engineering & Assessment Ltd, UK on behalf.
OVERVIEW OF Ian Glendinning Target Training Room Target Plaza South 1000 Nicollet Mall Minneapolis, MN September 20-21, 2007 ISO Training -
Applying the SOA RA Utah Public Safety ESB Project Utah Department of Technology Services April 10, 2008 Prepared by Robert Woolley.
Virtual University - Human Computer Interaction 1 © Imran Hussain | UMT Imran Hussain University of Management and Technology (UMT) Lecture 16 HCI PROCESS.
Unit 2. Software Lifecycle
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Data Integration and ISO at Bechtel
AceMedia Personal content management in a mobile environment Jonathan Teh Motorola Labs.
DECISION SUPPORT SYSTEM DEVELOPMENT
A Framework for Distributed Preservation Workflows Rainer Schmidt AIT Austrian Institute of Technology iPres 2009, Oct. 5, San.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Community Manager A Dynamic Collaboration Solution on Heterogeneous Environment Hyeonsook Kim  2006 CUS. All rights reserved.
Integrated Information Platform for reservoir and subsea production systems The Integrated Information Platform (IIP) project IIP Chairman Svein Omdal,
3rd Annual Energistics Standards Summit Standards – Benefits across Industries Michael Strathman Aspen Technology, Inc 23 October 2008.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 18 Slide 1 Software Reuse 2.
FIATECH FIATECH ADI Programmers Circle 2006 Onno Paap, Fluor Corporation.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 18 Slide 1 Software Reuse.
EOSC Generic Application Security Framework
1 Proposed PLCS TC Organization and Functional Responsibilities Revision
Chapter 9 Database Planning, Design, and Administration Sungchul Hong.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Overview of the Database Development Process
Ontology Development Kenneth Baclawski Northeastern University Harvard Medical School.
Copyright © 2004 TietoEnator Corporation Production data reporting - standardisation Regional SIG Meeting – May 12 - Houston, Texas.
1 Implementing ISO and iRING at Bechtel The Power of Collaboration Digital Plant 2010 Houston March 1-3, 2010 Robin Benjamins.
Brussels, 1 June 2005 WP Strategic Objective Embedded Systems Tom Bo Clausen.
PCA and ISO are true! Welcome! Thore Langeland, Ph. D. Chairman of PCA Americas PCA Forum and Member Meeting Hosted by Bechtel, Houston.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
Templates. The Problem Supplier X A range on the data sheet.
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
Integrated Information Platform for reservoir and subsea production systems Stavanger April 6th 2005.
1 Our Open Standards Community Jerry Hubbard Executive Vice President, Business Development Petrotechnical Open Standards Consortium North America Region.
1 Synchronize work on DEXs and reference data between PLCS pilots and OASIS/PLCS - Proposed PLCS TC Organization and Functional Responsibilities.
Ontology for Federation and Integration of Systems Cross-track A2 Summary Anatoly Levenchuk & Cory Casanave Co-chairs 1 Ontology Summit 2012
EU Project proposal. Andrei S. Lopatenko 1 EU Project Proposal CERIF-SW Andrei S. Lopatenko Vienna University of Technology
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
Thore Langeland, Ph.D. Manager IO, OLF Information sharing in the Norwegian offshore industry Hilton Americas Hotel, Houston, March.
ISA Setting the Standard for Automation ™ Automation Standards Compliance Institute ISA Security Compliance Institute (ISCI) Prepared by: Andre Ristaino,
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
Software Engineering - I
Visual Studio 2005 Team Edition for Software Architects: Developing Service-Oriented Systems Bill Gibson Senior Program Manager Enterprise Tools Microsoft.
Creating a European entity Management Architecture for eGovernment CUB - corvinus.hu Id Réka Vas
SOA-25: Data Distribution Solutions Using DataXtend ® Semantic Integrator for Sonic ™ ESB Users Jim Barton Solution Architect.
Strategies for Realizing the Semantic Web Ian Horrocks.
FDT Foil no 1 On Methodology from Domain to System Descriptions by Rolv Bræk NTNU Workshop on Philosophy and Applicablitiy of Formal Languages Geneve 15.
Building a Permanent Infrastruture including in e-field operations Real Time Operations.
PLCS DEXs Trine Hansen DNV 20 April Content OASIS / PLCS Organization PLCS DEXs DEX architecture Process – define and verify capabilities Way forward.
MODEL-BASED SOFTWARE ARCHITECTURES.  Models of software are used in an increasing number of projects to handle the complexity of application domains.
International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Model-based Systems Engineering (MBSE) Initiative Slides by Henson Graves Presented by Matthew.
Eurostat SDMX and Global Standardisation Marco Pellegrino Eurostat, Statistical Office of the European Union Bangkok,
A Mediated Approach towards Web Service Choreography Michael Stollberg, Dumitru Roman, Juan Miguel Gomez DERI – Digital Enterprise Research Institute
Requirements Engineering Processes. Syllabus l Definition of Requirement engineering process (REP) l Phases of Requirements Engineering Process: Requirements.
Onno Paap Integration manager Fluor Corporation Radisson Plaza Hotel Minneapolis, MN September 17-19, 2007 Progress of project: Acceleration Deployment.
WonderWeb. Ontology Infrastructure for the Semantic Web. IST Project Review Meeting, 11 th March, WP2: Tools Raphael Volz Universität.
From Camelot to Avalon - the knights of ISO make progress R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y ids-adi.org.
1 4th of October, 2006 © ATHENA Consortium 2006 B5 EADS CCR piloting Nicolas Figay, EADS Flora Robin, EADS ATHENA Intermediate Review October 2006.
STENE NO ALPHA 4 – Block 1 – Question 4 Barcelona May Flexible metering of domestic and small industrial consumers The metering process.
Application of the ISO for BIM Xenia Fiorentini, Engisis.
Connect communicate collaborate Bringing Governance into Distributed R&D Software Development – GÉANT Case Study Branko Marović
Technical Operations 12 th July 2010 Dr Phil Spiby Eurostep Limited Integrating Systems Engineering Information with AP233.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
ITEA3 Project: ACOSAR Advanced Co-Simulation Open System Architecture
An ETP Studentship with University of Strathclyde and TNO (NL)
Production data reporting - standardisation
Presentation transcript:

Projects

Intelligent Data Sets Project 3 year project ending December with a total budget of 2.7 mill USD –Funded by Research Council of Norway (NRC) and participants Participants –Operator –Solution Providers –Consultants –Associations Collaborating associations and projects –Accelerating Deployment of ISO (ADI) and FIATECH (US initiatives)

Intelligent Data Sets Project Objective The objective of the project is to –Develop a methodology for mapping existing proprietary data representations to/from an ISO representation to support data exchange and integration using “Intelligent Data Sets” –This provides data separated from presentations, which again allows assembly of data in new formats targeted at new work processes –To study how this support new collaborative work processes within and between organizations is a research topic at the UiS. One neutral, extendable description, supporting multiple views across phases and applications Many different, view dependant descriptions - business - company - phase (lifecycle) - application (DS/2D/3D) - etc

Examples Of Inconsistent Representations

Daily Challenges For Data Sheet Mapping In order to resolve this, a neutral, system independent representation that can map to any proprietary representation is required. Need to recognise which representation is used by which proprietary representation SHARECAT M45, M46, M47NORSOK B37 14 Conn. Size/Type Proc. : 1/4"-18 NPT (F) Connection design. : NPT Size : 1/4” Thread pitch : 18 thr/in ANSI/ASME B / NPT-F Representation 1, Context 1 Representation 2, Context 2

Context Of Codes I

Context Of Codes II T5: t5.no-thobben på nett Sony tilbakekaller Cyber-shot DSC-T5 Volvo T5 IP66: IP66 APPARATUS IEC EEx ia:EX IA APPARATUS IEC IIC here:GROUP IIC APPARATUS IEC T5 here:T5 APPARATUS IEC IIC:International Institute for Conservation of Historic and Artistic Works Local Name Class Name Local Name Class Name

IDS Intelligent Data Sets Support mapping and exchange between proprietary data sheet formats using templates and RDL RDL/ontology development for Oil & Gas Template development –Generic basic templates –Assembly into molecular templates –Represent complex data sheets using templates Template application –Implement template definitions as instantiation scripts in (e.g.) SWRL –Rules generate rich structures for standardized storage –Common representation of data supports exchange –Validation and quality checks on data

ADI Accelerating Deployment of ISO (ADI) –Bechtel –Bentley –Fluor Daniel The ADI project defines Part 7: Templates –Implementation methods for the integration of distributed systems –Develops SW for the RDS/WIP “inbox” POSC Caesar provides –Methodology for Part 7 template specification, using First-order logic –Initial set of template definitions –Validation of templates using automated reasoning Part 2 in OWL format Longhand template definitions expressed as SWRL rules –Hosting ADI software to access POSC Caesar Reference Data System (RDS)

Aramco Services Company Atomic Energy Canada Ltd AVEVA Barton Consulting Bechtel Corporation Bentley Systems COADE ConocoPhillips Consolidated Contractors Company DNV Dow Chemical DuPont Fluor Corporation Georgia Institute of Technology Hatch Intergraph KBR National Institute of Standards & Technology (NIST) Noumenon Consulting NRX Global OntoConsult POSC Caesar Association Procter & Gamble Software Innovation USPI VTT ADI Sponsors

Need a neutral representation, independent of –Application –System –Lifecycle stage An integration model –Conceptual model Needed to be concerned with “what things are” as opposed to their representation –Need for semantics How things are related –Need for a rich ontology Lessons Learned From Developing ISO (I)

The obvious choice for us was set theory and first order logic (FOL) –All specifications used in the industry are by nature about class membership –Developing a specification is adding constraints, i.e. defining subclasses Later we ran into the problem “What is information about a class member as opposed to information about the class itself?” Led to the identification of the need for Second Order Classes –The classes had to be dealt with as object –We have later discovered that we also have Third Order Classes –Will probably later need even higher level classes Note that this is observations discovered from industrial needs. We were introduced to OWL in 2003, and decided to test this to see if this was the way forward We ran into lengthy discussions of OWL Full vs. DL –The current state of development indicates both, Full to support lifecycle data, DL for reasoning. POSC Caesar, which is a Norwegian based industry association, and one of the organisations behind ISO has become W3C member, and is participating in the establishment of a W3C O&G Incubator Group. Lessons Learned From Developing ISO (II)

Most systems used in the industry are “proprietary” systems and will probably be in use for a long time to come They all use their internal representations, and will continue to do so Systems can be interfaced, but at a considerable cost. Resource restrictions. They have to be interfaced to new systems whenever project participants change If an ontology is not interfaced to existing systems it will only be useful for new developments, systems etc., not for use with existing systems Tool support to map between standardised and proprietary representations. Templates (ISO ) and IDS tools are means to achieve this An ontology will never be completed, a system must be in place to handle extensions Capability to handle lifecycle data Reasoning over data quality Interfacing the ISO ontology to existing systems and setting up a system to handle extensions is what the IDS project is about Lessons Learned From Developing ISO (III)

Integrated Operations in the High North Project Outline May 2008

Main Objectives The primary objective of the project is to develop:  A demonstrated reliable digital platform for Integrated Operation Generation 2 (IO G2) in the High North  IO G2 pilots within drilling, R&P, O&M in the High North  Decision Support for drilling, R&P, O&M IO G2 for the High North shall facilitate operations in remote and hazardous conditions, the use of limited operational personnel and “zero footprint” solutions

Project Architecture – Technical view Business processes Digital platform Unmanned Drilling rig Improved production Sub-ice operation Semantic oil and gas platform and information assurance Networks, infrastructure and web services Autonomous and failsafe subsea control systems Risk management for reliable information & IT Activity 1 Activity 2 Activity 3 Activity 4 Activity 5Activity 6Activity 7

Semantic Oil & Gas Platform Objectives: To extend and improve the content and quality of the ISO based oil and gas ontology To develop a prototype information validation service

Semantic Oil & Gas Platform Main deliverables: 1.Ontology building methodology from the IDS project adapted to the addressed domains 2.Extended and improved Oil & Gas ontology with  Oil & Gas production ontology including relevant parts of PRODML, Daily Production Report and Monthly Production Report  ISO Product Life Cycle Support (PLCS)  Operation & Maintenance ontology including relevant parts of IBM’s RSM, ISA95 and ISA88 and ISO 13375/Mimosa  Drilling ontology 3.A prototype information validation service based on semantic web technology, IDS-templates and the oil & gas ontology

Committed Participants and Funding Committed to join:  StatoilHydro, Norwegian Defence, IBM, DNV, National Oilwell Varco, Invenia, Computas, Epsis, TietoEnator, FMC, SAS Institute, Kongsberg, PSA Centre of Integrated Operations, IRIS, NTNU, UiO, UiS, POSC Caesar, OLF, Abelia and FSi  Representing a total committed funding of 70 MNOK (RCN 17 MNOK) Project will start as described with activity 2,3,4,5 and 7 Activities 1 and 6 will start as soon as funding is secured Start-up Duration 4 years Target total budget 90 MNOK