Maher Attal On behalf of SESAME Team Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East M. Attal, XXII ESLS.

Slides:



Advertisements
Similar presentations
Slide: 1 Welcome to the Non Linear Beam Dynamics Workshop P. Elleaume Non Linear Beam Dynamics Workshop, ESRF May 2008.
Advertisements

2002 November 16 CLS PROJECT STATUS M.S. de Jong Project Leader November 16, 2002 Annual Users’ Meeting.
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
SSRF Light Source Complex Zhao Zhentang for the SSRF Project Team Shanghai Symposium on Intermediate Energy Light Sources Shanghai China, September 24-26,2001.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
EMMA 24 th February 2009 ALICE Stakeholder Meeting.
ALPHA Storage Ring Indiana University Xiaoying Pang.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
G.N. Kulipanov, N.A.Mezentsev, A.V. Philipchenko, K.V. Zolotarev
SESAME Synchrotron Light for Experimental Science and Applications in the Middle East JSPS Asien Science Seminar Synchrotron Radiation Science Dieter Einfeld.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Studies on Lattice Calibration With Frequency Analysis of Betatron Motion R. Bartolini DIAMOND Light Source Ltd FMA workshop, Orsay, LURE, 1 st and 2 nd.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
Status of the Spanish Light Source David Beltrán.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
M. Attal, 10 th Technical Advisory Committee Meeting, May 10-11, 2010, Allan, Jordan Synchrotron-light for Experimental Science and Applications in the.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Turkish Accelerator and Radiation Laboratory at Ankara Suat ÖZKORUCUKLU İstanbul University.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Status of the Diamond Light Source upgrade EuCARD2 topical workshop Barcelona, 23 April 2015 R. Bartolini. A. Alekou, M. Apollonio, R. Fielder, I. Martin,
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
PETRA III, A New High Brilliant Light Source At DESY
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East SESAME, Allan, Jordan Maher Attal On behalf of SESAME Team.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
ESRF Operation and Upgrade Status Achievements and Perspectives J. L. Revol, L Farvacque On behalf of the Accelerator & Source Division European Synchrotron.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
SLS-2/Cosami meeting Mar. 16, 2016
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
Report Technical Director Storage-Ring-Installation Completed
Report Technical Director Storage-Ring-Installation Completed
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Diamond Light Source Status and Future Challanges
Low Emittance Rings 2014 Workshop
Coupling Correction at the Australian Synchrotron
SESAME-On The Way To Become Real
SOLEIL Fast Orbit Feedback System
An overview the ASTRID2 storage ring and its RF system
The new 7BA design of BAPS
LHC (SSC) Byung Yunn CASA.
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
SPEAR3 Lower Emittance & Nonlinear Dynamics
Status of the ASTRID2 RF systems
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

Maher Attal On behalf of SESAME Team Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East M. Attal, XXII ESLS Workshop, ESRF, Nov , 2014 Allan, Jordan 1

M. Attal, XXII ESLS Workshop, ESRF, Nov , 2014 Introduction SESAME is an interregional 3 rd generation light source being constructed in Jordan (in Allan, 30km west of Amman) and expected to serve the user community in the Middle East region. SESAME machine composes:  BESSY I injector (22 MeV classical Microtron MeV Booster)  completely new 2.5 GeV storage ring.  mixture of donated ( by SLS, HZDR, LURE, Daresbury) and new beamlines. 2

M. Attal, XXII ESLS Workshop, ESRF, Nov , 2014 Microtron + TL1 Commissioning Full energy beam at Microtron exit (~22MeV) Nov. 28, Full energy beam at end of Microtron-Booster transfer line (~22MeV) March 27, SESAME Microtron Main Parameters Extractable energy MeV Extractable turns 10 – 42 Energy gain / turn 535 keV Energy spread(FWHM) 35keV Magnetic field 0.112T Microwave frequency, power 3GHz, 2MW Pulse duration 2  s Beam power 400kW at 21MeV H-emittance 3.8   m.rad (100% of the 21MeV) V-emittance 12.8  µm.rad (100% of the 21MeV) 3 mm 4.4 mm 3

Booster Commissioning Results Booster Transfer line TL2 TL1 Microtron Main Booster parameters Injection energy 20MeV Extraction energy 800MeV Circumference 38.4m H-emittance 300 nm.rad V-emittance 30 nm.rad Mom. com. factor 0.18 RF frequency 500MHz RF max. power 2kW Operation freq. 1Hz Inj. kicker pulse ~ 4.5µs M. Attal, XXII ESLS Workshop, ESRF, Nov ,

The first turn beam (July 15, 2014).  No correctors are used. Few turn beam (July 16, 2014).  No correctors are used.  using model values ( QF= 2.83A, QD= -2.18A, Dipole= 24.96A )  Varying injection angle.  optimizing amplitude and timing of injection kicker kick. Multi turn beam (thousands) (July 17, 2014).  Varying magnets current slightly from model values.  Modifying slightly injection angle.  0.2A in Corr. 3 enhanced the transmission substantially. Booster Commissioning Results M. Attal, XXII ESLS Workshop, ESRF, Nov ,

Characterizing the DC Mode  RF paramaters Varying RF phase had no noticeable effect on the beam current in the Booster. The theoretical RF frequency MHz showed almost the best performance.  Tune measurement Horizontal tune was measured easily using the beam injection oscillations. Vertical tune was measured by injecting the beam with vertical angle (shaker is not ready yet). Three working points have been found as a result of scanning: 1- (2.22, 1.31), a working point mentioned in BESSY documents. 2- (2.22, 1.40) 3- (2.28, 1.47) M. Attal, XXII ESLS Workshop, ESRF, Nov ,

1- The point (2.22, 1.31) obtained for (QF = 2.67A, QD = 2.14A) (corresponding model values are QF = 2.83A, QD = 2.18A). It has low beam current transmission & low beam lifetime as shown by DCCT. DCCT signal 2- The point (2.22, 1.4) obtained for (QF = 2.68A, QD = 2.27A). It realizes better transmission with beam lifetime ~ 100ms. Characterizing the DC Mode M. Attal, XXII ESLS Workshop, ESRF, Nov ,

Characterizing the DC Mode 3- The point (2.28, 1.47) for (QF = 2.77A, QD = 2.47A). It realizes good transmission with the best beam lifetime ~ 150ms. Theoretical beam is ~ 150ms if the Booster average pressure is 5e-7 mbar.  Betatron function measurement Measure  Q x versus  k QF and  k QD. use the formula, N: number of family quadrupoles, L q = 0.256m. = QF (theoretical value is 5.3m). = QD (theoretical value is 1.12m). M. Attal, XXII ESLS Workshop, ESRF, Nov ,

Characterizing the DC Mode  Dispersion function measurement Measure orbit position  x for RF frequency  f RF. BPM1 showed  x = 2.3 mm for  f RF = -100 kHz. using the formula, and theoretical  c =  x = 2.06m (theoretical dispersion = 1.6m) M. Attal, XXII ESLS Workshop, ESRF, Nov , The fluctuating beam was always a prominent source of measurement error.

Energy Ramping Mode Beam energy was ramped successfully to 800MeV (Sep. 17, 2014).  I beam = 1.3 mA (~ 1.7% injection efficiency)  Injection was done at 23.9 ms delay in a semi-flat top region in the dipole current ramping curve. M. Attal, XXII ESLS Workshop, ESRF, Nov , 2014 Injection moment RF voltageDipole current  The ramping curve started with the working point (2.22, 1.4). 10

Energy Ramping Mode I beam = 4 mA (~ 5% injection efficiency) was achieved (Oct. 29, 2014).  Another dipole current curve was used without a flat-top region (injection on the fly). M. Attal, XXII ESLS Workshop, ESRF, Nov , 2014 Injection moment  The RF voltage ramping curve started with 5kV and ended with 70 kV (injection voltage = 8kV). RF voltage ramping curve * Beam fluctuation due to instability in electrostatic injection septum. 11

Beam Images at Different Energies The electron beam was imaged at different energies (during the ramping) using the added Visible Light Diagnostic beam line. The beam size was roughly measured over the ramping time. 100ms (~120MeV) 300ms (~440MeV) 500ms (~735MeV) 640ms (~800MeV) M. Attal, XXII ESLS Workshop, ESRF, Nov ,

13 Booster Commissioning was done under Hard Conditions M. Attal, XXII ESLS Workshop, ESRF, Nov , December – April, 2014 November, 2014 The new roof is expected to be ready by Feb Tune measurement during ramping Although no impact was seen on the acceleration efficiency, nevertheless the tune drift can be easily corrected.

Storage Ring Characteristics Main 2.5 GeV Ring parameters:  Simple DBA lattice (2 quadrupole families, 2 sextupole families) with dispersive sections.  C = m, Emitt. = 26 nm.rad.  (Q x, Q y ) = (7.23, 6.19).  Bending magnet: B 0 = 1.455T, g = -2.79T/m.  16 straight sections (8x 4.4m + 8x 2.4m).  Up to 25 beamlines ( 13 from dipoles + 12 from insertion devices). xx yy xx Super-period. The ring is composed of 8 super-periods. M. Attal, XXII ESLS Workshop, ESRF, Nov ,

Storage Ring Status: Magnets Storage ring magnets are constructed through CESSAMag project in the frame of SESAME-CERN/EU collaboration. Dipole (constructed by TESLA, UK) prototype is being magnetically measured at ALBA. All dipoles to be delivered by Sep Quadrupole prototype is being assembled (by Elytt-Spain, coils by STS-Turkey). First batch to be measured at CERN by March Sextupole prototype (by CNE-Cyprus & HMC-3-Pakistan, coils by SEF-France) has been magnetically measured at CERN. First batch to be measured at CERN by March M. Attal, XXII ESLS Workshop, ESRF, Nov ,

Storage Ring Status: RF System The 500MHz RF system is composed of 4 RF plants. Each plant composes: - 120kW Elettra cavity (detuned up to ±2MHz).  Collaboration agreement was signed with Elettra.  Delivery of 4 cavities foreseen by May kW solid state amplifier(the 1 st to be built by SOLEIL, the 3 others by Sigmaphi-SE).  Construction to start soon. - WR1800 waveguide (inkind contribution from DESY) - Digital LLRF (in the tendering process) M. Attal, XXII ESLS Workshop, ESRF, Nov , Courtesy of SOLEIL

Storage Ring Status: Vacuum Chamber The ring contains 16 valves, 64 bellows, 32 BPMs + 32 ID BPMs. Contract has been signed with FMB. Expected delivery date of prototype is Feb To be setup with magnets and prototype girder at CERN by March Valves, bellows, pumps injection section, RF section to be contracted. One cell vacuum chamber BPM M. Attal, XXII ESLS Workshop, ESRF, Nov ,

Storage Ring Status: Girders Flatness < ± 50 µm, Pin-positioning < ± 50 µm, Deflection under load < 50 µm. Contract has been signed with Nortemecanica, Spain. Prototype delivery expected by Feb To be setup with magnets & vacuum chamber at CERN by March 2015 (SAT). Last batch to SESAME by May m 0.9m 0.953m M. Attal, XXII ESLS Workshop, ESRF, Nov ,

SESAME Phase 1- Day 1 Beam Lines No.BeamlineEnergyPhoton SourceComment 1Protein Crystallography4 – 14 keVIV Undulator ?Under discussion 2 XAFS / XRF (BASEMA) 4.5 – 30 keVBending Magnet Helmholtz-Zentrum Dresden-Rossendorf/ESRF. New focusing components. New hutch 3 IR Spectromicroscopy (EMIRA) 0.01 – 1 eVBending MagnetCompletely new beam line 4Powder Diffraction5 – 25 keV2.1T WigglerSLS (with source) 5 Soft X-ray, Vacuum Ultraviolet (VUV) 0.05 – 2 keV Ellipt. Polarizing Undulator Completely new beam line 6SAXS / WAXS8 – 12 keVBending MagnetDaresbury 7 Extreme Ultraviolet (EUV) Spectroscopy 10 – 200 eVBending MagnetDaresbury & LURE M. Attal, XXII ESLS Workshop, ESRF, Nov ,

20 (BASEMA) XAFS/ XRF beam line:  CDR approved.  Manual user documentation finished.  Installation to be started in (EMIRA) IR beam line:  Collected from main and edge dipole field.  Tendering process is being processed.  Expected to be functional by mid SESAME Phase 1- Day 1 Beam Lines M. Attal, XXII ESLS Workshop, ESRF, Nov , 2014 Dipole chamber Protection wall Diamond window Experimental station Branch 1 Branch 2

Storage Ring Milestone Schedule DeliverablesContractedPrototy pe 1. BatchLast Batch Magnets (Dipole) Power-supplies Vacuum Chamber Girder Cavities RF-Amplifier (SOLEIL - Sigmaphi) (SOLEIL & Sigmaphi) (Sigmaphi) Storage ring commissioning expected by 1 st of M. Attal, XXII ESLS Workshop, ESRF, Nov ,

Thank you M. Attal, XXII ESLS Workshop, ESRF, Nov ,