Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction 1 2009.4.19AAP-SCRF-Introduction.

Slides:



Advertisements
Similar presentations
ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Advertisements

GDE-Tohoku Meeting WG-2 (SCRF) : Tasks and Goals Akira Yamamoto 1.SCRF efforts since Fermilab Meeting 2.Replan of SCRF R&D for TDP1 & 2 3.Tasks and Goals.
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 1 Barry Barish 2 nd Asian ILC R&D Seminar 29-September-08 Progress toward the ILC ATF-2.
Report of HLRF KOM S. Fukuda. Project Management Structure Area: Main Linac Technology (to be completed) Regional/Intsitutional Effort: - Director-US:
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Rev. Apr. 7, 2008 Preparing for SCRF Meeting to be held at Fermilab, April Report from Meetings at SLAC and Fermilab Akira Yamamoto April 6, 2008.
1 Global R&D Effort of Superconducting RF Technology for the International Linear Collider Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Summary and Discussion AAP-SCRF-Summary.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK,
Report of Visiting PKU, Tsinghua U. IHEP Dec. 9 and 10, 2009 Kaoru Yokoya, Marc Ross, and Akira Yamamoto Report to ILC-EC, Dec. 11, 2008.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Plan for SCRF BTR January , 2012 Akira Yamamoto, Marc Ross, and Nick Walker (PMs) Jim Kerby, and Tetsuo Shidara (SCRF-APMs) Presented and discussed.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
ILC-EDR Kick-off Meeting Cavities Organization and Charges Sept. 19, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Cavities Held at DESY, Sept ,
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
Main Linac (SCRF) Technology Area Guidelines for the Meeting Akira Yamamoto Parallel Session ILC-GDE Meeting, Fermilab, Oct , 2007.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-19 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
Saclay / Orsay visit – (GDE Project Managers) 1 R&D Plan: ‘Engineering Design’ Phase - presentation to Saclay / Orsay Marc Ross, Akira Yamamoto,
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
SCRF: Monthly WebEx Meeting Oct., 19, 2011
SCRF WebEx Monthly Meeting Agenda and Reports from PM
SCRF Monthly WebEx Meeting May 6, 2010
ILC Cryogenics Work Package Status and Plans
Meeting for S1-Global module design Cryomodule and Cryogenics
SCRF Monthly WebEx Meeting Sept. 22, 2010
WG-1 Session Cavity Performance Cryomodule Performance
ILC Project Management Status
SCRF Monthly WebEx Meeting Jan. 12, 2010
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
, A. Yamamoto SCRF WebEx Meeting.
WG3: Main Linac SCRF(cavity,cryomodule)
Presentation transcript:

Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction

2 SCRF Cavity Major Goals High-gradient cavity performance at 35 MV/m according to the specified chemical process with a yield of 50% in TDP1, and with a production yield of 90% in TDP Nominal Cryomodule design to be optimized: - plug-compatible design including tune-ability and maintainability - thermal balance and cryogenics operation - beam dynamics (addressing issues such as orientation and alignment) 2009 Cavity-string performance in one cryomodule with the average gradient 31.5 MV based on a global effort (S1 and S1-global) 2010 An ILC accelerator unit, consisting of three cryomodules powered by one RF unit, with achieving the average gradient 31.5 MV/m (S2) SCRF Cavity R&D for ILC

Technical Areas and Groups Engineering and Scientific Management 25 (16 below PM) –7 Asia –7 EU –11 Americas ILC Global Design Effort L.Lilje >> R. Geng Susanna Guiducci (infn)

Context Give by AAP AAP-SCRF-Introduction 4

AAP Review Context for SCRF ContextChargeNote What is the path to finalizing the gradient choice? - Current Experimental status - Established standards, and Extrapolation of results - Role of “plug-compatibility”, in R&D stage - Time (limitation) and Decision Process L. Lilje M. Champion H. Hayano R. Geng A. Yamamoto S0 What is the path toward industrialization? - Current experimental status - Established standards, and extrapolation of results - Internationalization of efforts, - Outline tendering process - Role of Plug-compatibility, in Production Stage N. Ohuchi P. Perini D. Mitchell H. Hayano C. Pagani J. Kerby A. Yamamoto S1/S 2 Lesson expected from system test - FLASH at DESY (operational limitation of ILC cavities) - STF at KEK, time-line and benefit - NMF at FNAL: time-line and benefit (J. Cawardine) H. Hayano M. Champion S AAP-SCRF-Introduction 5

Response from AAP for SCRF The SRF R&D started with a well-laid out international R&D plan, which required the intricate interaction of the participating laboratories already in the phase of the Reference Design Report. Goals defined during that phase have been elaborated in an often demanding decision process. Naturally, as time went on priorities shifted and so did the R&D activities. How did and does the process affect the readiness for the decision process of the gradient? What level of confidence can be reached in the various technical areas? It would be beneficial for the committee to have a short introductory review of the critical R&D gradient goals for TDP 1 and 2 and their timelines, with mention of targets for number of cycles/number of cavities, and number of cryomodules, as laid out in the TDP document. The status report should cover activities in both cavity and cryomodule gradients. On the continuing R&D Plan, there is a need to discuss fully how the gaps between the current status for cavity gradients and the goals for TDP phases 1 and 2 will be addressed. For example: AAP-SCRF-Introduction 6

Specific Questions by AAP AAP-SCRF-Introduction 7 Specific Questions To be reponded/answ ered by: What are the sources of present limitations in gradient yields due to preparation processes? L. Lilje What approaches are underway to increase the process yield? L. Lilje How will sufficient number of cycles be made available? L. Lilje/ A. Yamamoto What are the sources of present limitations in gradient yields from cavity to cavity? L. Lilje What approaches will be pursued to increase the cavity yield/vendor yield? L. Lilje/ A. Yamamoto How will sufficient number cavities/cycles be made available to 2012? A. Yamamoto

Questions Continued ; Plug-Compatibility AAP-SCRF-Introduction 8 Specific QuestionsTo be responded/an swered by: While the topic of “Plug compatibility” relates both to R&D and industrialization phases, it would be more suitable for the review goals to focus on the role for the R&D phase. Some of the related issues that would be helpful to address are: J. Kerby What are the expected cost/performance advantages of each of the options being considered (for cavities, couplers, tuners), especially relative to the XFEL choices? (To be discussed)

SCRF Session Agenda, April 19 TimeReportCharged byNote 09:30IntroductionA. Yamamoto 09:40 10:15 Path to finalizing cavity field gradient - R&Ds to improve the gradient - Decision process L. Lilje A. Yamamoto S0 10:30 11:00 11:30 12:00 12:20 -- Coffee Break -- Path towards industrialization - Cavity Integration - Cryomodule - Role of plugcompatibility (cavity/cryo) - Cryogenics H. Hayano N. Ohuchi J. Kerby (updated) T. Peterson S1 12:30 14:00 14:20 -- Lunch break -- - HLRF - MLI: beam dynamics and quadrupoles S. Fukuda C. Adolphsen 14:40 15:00 15:20 15:30 Lesson expected from system tests - STF at KEK - NML at FNAL Summary / Discussions Adjuorn H. Hayano M. Champion A. Yamamoto S AAP-SCRF-Introduction

backup AAP-SCRF-Introduction 10

AAP Review General Agenda AAP-SCRF-Introduction 11