PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 9/13/2007 Don Lynch. 9/13/2007 Weekly Planning Meeting 2007 PHENIX Shutdown April-June 2007: Complete run, De-mount HBD West, Begin.
Advertisements

PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 9/6/2007 Don Lynch. 9/6/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upin progress.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 7/19/2007 Don Lynch. 7/19/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 8/9/2007 Don Lynch. 9/9/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
PHENIX WEEKLY PLANNING 10/18/2007 Don Lynch. 10/18/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 7/26/2007 Don Lynch. 7/26/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch

6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove HBD East 7/19/07 Start Shutdown /2/07 [this space available] x/xx/xx Open Shield Wall 6/28 MPC South remove for upgrade7/20/07 Yasyuki converter test6/13/07? End of Physics 6/26 Flammable Gas Purge 6/26-6/27

6/7/2007 Weekly Planning Meeting 3 Mixing House Flammable Gas Head Malfunction C-A recalibrated twice before the failure. Head failed ~ 11:00 PM. Cut power to mixing house putting detectors in purge mode. Power recovered ~12:15 AM. Systems running ~3:00 AM but full recovery took until ~12:00 NOON. Failed head was replaced, but does this solve anything?

6/7/2007 Weekly Planning Meeting 4 Yesterday’s Access: Limited work doneby: MuTr MuID TOFW HBD No problems encountered No more resticted accesses planned until end of Run 7

6/7/2007 Weekly Planning Meeting 5 Next Access Day: June brief access Converter test: place thin copper strips near beampipe on west side.

6/7/2007 Weekly Planning Meeting 6 RPC Factory Tent, lots of tables, jib crane and shelves from 832 are available and ready to be moved.-> List given to C. Pearson to arrange for riggers. PHENIX techs and students will sort and prep tent parts. C. Pearson/D. Lynch to arrange for carpenters to erect tent. Minutes & Action Items from Yousef rec’d. R. Towell now at BNL to run factory.

6/7/2007 Weekly Planning Meeting 7 RPC Assembly “Factory” at BNL

6/7/2007 Weekly Planning Meeting 8 Equipment Tent (Gap Testing, Module Assembly, Cosmic Ray Test), (existing from PHENIX PC w/ sealed lights and HEPA filters) 2 ~9000 btu/hr AC’s (portable or window type) 1 Gap Check Table ~5’ x 8.5’ 2 Staging Tables ~5’ x 8.5’ 2 optical Tables ~5’ x 8.5’ for module assembly HV/LV Crate & Electronics DAQ Table ~3.5’ x 5’ holds DAQ Computer, CAMMAC & NIM Crate 2 Cosmic Ray Test stands ~6’ x 9’ 1 Computer Desk for data analysis computer ~3’ x4’ 2 Phone/ethernet connections for DAQ and computer desks V duplex outlets on amp circuits (4-15 amp, 2-20 amp?) 1 Rolling transport table ~5’x8’ to move gaps & modules in tent & to storage ~ 4 chairs, 2 for each desk Book shelf

6/7/2007 Weekly Planning Meeting 9 Equipment Outside of Tent –Storage racks for gaps, modules, raw materials & fabricated frame details –Interior racks for test gases (near tent 2 R-134A, 1 SF6, 1 isopropane) –Half octant assembly table –½ ton-1 ton jib crane/A-Frame hoist for half octant ass’y area –Tech area: Desk & chairs Hardware & tool cabinets (lockable) Phone & internet (shared with tent computer) Book shelf File cabinet (lockable) Outside of Building 912 –Storage racks for spare and empy gas bottles –Area for N2 buggy Utilities –Electric, phone and internet –N2 gas lines from buggy to gap & module storage areas

6/7/2007 Weekly Planning Meeting 10 Equipment (Not in Layout) Security & Safety –Barriers (To Be Defined) –SF6/R134A detector Housekeeping & Misc. –Trash cans (2) –Water (Drinking) –Vacuum –Printer –Webcam (2?) –Weather station? –Portable ladder –Hand tools, portable electronic tools, etc.

6/7/2007 Weekly Planning Meeting 11 Procedures Review Latest Counts Last week there were 55 active procedures to be evaluated. Now we have 51 active, 76 inactive 9 evaluated and up to date 4 evaluated and need minor revisions/signatures 37 not yet evaluated: Gas System Procs(8)Rob to review Elect System Procs (21)Paul to review Mech System Procs (9)Don to review Efforts continue

6/7/2007 Weekly Planning Meeting 12 JTA Review All training records gathered for PHENIX technical staff techs and engineers. Cannot change JTA’s yet because of inconsistencies in JTA’s and Equivalencies. Visual Basic/Excel program written to evaluate individual records This effort continues....

6/7/2007 Weekly Planning Meeting Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ? HBD West repair4/269/14 End of Run 76/266/26 Flammable Gas Purge6/266/27 Open rolling wall, disassemble and store6/286/28 EOR Party 6/296/29 MuID collar removal, MMS move S.7/97/9 Disconnect EC and Move to AH7/107/16 RPC Engineers coordination visit7/167/26 Reconnect EC for maintenance in AH7/167/23 Move MuID collar to AH7/167/16 Install IR floor plates, rolling cart & move manlift to IR7/177/18 Install CM access ladder7/187/18 Remove HBD East7/197/19 Remove MPC South7/207/20 MPC South upgrade/ bench tests7/238/13 Move CM south7/237/23 Remove SouthEast Vertical Lampshade7/247/24 Remove MPC North7/257/30 MPC North upgrade/bench tests7/308/6 Note: C-A Cooling water improvements are planned for this summer. This may involve interuption of water cooling for most/all of the summer. Please let me know if water cooling is necessary for any subsystem operations this summer.

6/7/2007 Weekly Planning Meeting Summer Shutdown Schedule (cont’d) ItemStartComplete MuTr Capacitor Decapitation7/258/31 Reinstall MPC North8/68/13 Move CM North8/138/13 Reinstall MPC South8/138/20 Repair RXNP Phototube8/138/20 Install CM Crane8/209/3 C-A arc flash work (no power)8/238/24 Misc. Subsystem Maint./repair/Upgrade7/1610/1 Misc. Infrastructure Improvements7/1610/1 MuTr FEE Prototype (Sta. 2N lwr oct.)9/39/28 HBD West Mechanical/Gas Reinstall9/179/24 HBD EAST Mechanical/Gas Reinstall 9/2410/1 HBD Electrical Reinstall9/1710/8 EC Roll In10/810/10 DC East repair10/1110/12 HBD/MPC/Other TBD Commissioning10/110/31 Start of Run 811/111/1

6/7/2007 Weekly Planning Meeting 15 5 Year Plan 2007 HBD Repairs, DC (minor) repairs), MPC N&S upgrade,MuTr FEE upgrade prototype, infrastructure upgrades & repairs, misc. subsystem work 2008 MuTr FEE upgrades 1 octant 1&2 S, Cu absorber test, RPC3 S, infrastructure upgrades & repairs, misc. subsystem work 2009 Scaffolding in MMS and MMN, MuTr FEE N&S stn. 2 & 3, MuTr N&S stn. 2 & 3 repairs, RPC2 S&N, RPC3 N, Cu absorbers, infrastructure upgrades & repairs, misc. subsystem work 2010Remove HBD & RXNP, remove beampipe, DC West upgrade, VTX barrel, RPC1 N&S, MuTr FEE stn. 1 N&S, MuTr stn. 1 N&S repairs, infrastructure upgrades & repairs, misc. subsystem work 2011NCC S, FVTX, infrastructure upgrades & repairs, misc. subsystem work 2012NCC N, upgrades contingency & wishlist, infrastructure upgrades & repairs, misc. subsystem work * Years refer to the shutdown year and follow the run with the similar number (i.e. work in 2007 is to be done in the shutdown that follows run 7, and so on)

6/7/2007 Weekly Planning Meeting 16 Other Work Empty and discard old container VTX chiller test: Done New Crane: rec’d estimate ~$7K (1 ton) ~$9K (2 ton) Stairway to HBD rec’d estimate ~$ 2K NCC Electronics CM Extension Step

6/7/2007 Weekly Planning Meeting 17 Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Where To Find PHENIX Technical Info For the PHENIX Staff there is no problem that is too difficult