THE COMMONWEALTH MEDICAL COLLEGE (TCMC) SCRANTON, PAXIAO YE ZHENG | STRUCTURAL OPTIONSENIOR THESIS 2013 ADVISOR: HEATHER SUSTERSIC.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
University Health Building Thesis Final Presentation
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Hershey Academic Support Center Structural Option Shawn Jones Building Analysis of the Hershey Academic Support Center Hershey, PA Shawn Jones Structural.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Mathew Nirenberg AE Senior Thesis Structural Option.
1.  S.T.E.P.S.: Science, Technology, Environment, and Policy Building  Education, laboratory, and research  Owner: Lehigh University  Location: Bethlehem,
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Reinsurance Group of America (RGA) Global Headquarters Natasha Beck Structural Option Faculty Advisor: Heather Sustersic Images courtesy of Gensler & Tom.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
UNIVERSITY SCIENCES BUILDING Kathryn Gromowski | Structural Option Northeast USA Senior Thesis 2011Faculty Advisor: Andrés Lepage.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

THE COMMONWEALTH MEDICAL COLLEGE (TCMC) SCRANTON, PAXIAO YE ZHENG | STRUCTURAL OPTIONSENIOR THESIS 2013 ADVISOR: HEATHER SUSTERSIC

o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements THE COMMONWEALTH MEDICAL COLLEGE BUILDING INTRODUCTION SITE MAP o Medical College o 185,000 SF o 4 Story Building plus a Penthouse o Maximum Height at 102’ o Cost $120 Million o May 2009 to Oct 2011 o Design-Bid-Build o Seeking LEED Silver Photos From TCMC Image from Google Map, edited by Xiao

THE COMMONWEALTH MEDICAL COLLEGEPROJECT TEAM Owner Architects Structural/M.E.P. Engineers Construction Management Landscape Architecture Interior Architecture TCMC Highland Associates & HOK Highland Associates Quandel Construction Group McLane Associates Highland Associates & HOK o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE EXISTING STRUCTURAL SYSTEM BAY SIZES o West Wing Foundation- mat slab, 4’-0” thick, 3000 psf bearing pressure Floor- composite steel deck, normal weight concrete topping, 7.5” thick o East Wing Foundation- drilled caissons, 36” to 60” in diameters, carry loads to bedrock. Floor- composite steel deck, lightweight concrete topping, 5.25” thick Image from Highland Associates, edited by Xiao o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE EXISTING STRUCTURAL SYSTEMMOMENT FRAMES o Framing System Composite steel frame W8x24 to W14x257, lightest to heaviest o Lateral System 15 moment frames (not including penthouse) Frame C Image from Highland Associates, edited by Xiao o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGEROOF HEIGHTS ROOF HEIGHTS PLAN Image from Highland Associates, edited by Xiao Image from Google Map o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE PROBLEM STATEMENTMIAMI, FL SITE o Interest in Wind Design o Interest in Steel Design o Scenario Created for Thesis  TCMC is to be designed on a site in Miami, FL  Hurricane Prone region, with wind speed up to 150 mph in building code.  Geotechnical report obtained from site in Miami- Dade County, Florida Image from Google Map, edited by Xiao o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE PROPOSED SOLUTION PROJECT GOALS o Two Lateral Systems Proposed Code Minimum Steel Moment Frames Code Minimum Chevron Braced Frames o Foundation MAT Foundation o Comparison Between Designs Moment Frames to Braced Frames New Systems to the Original System A Typical Braced Connection o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGENEW LOADSCOMPARISON Summary: Wind Loads on TCMC West WingEast Wing NS Base Shear560.0k296k NS Overturning Moment27,500.0k-ft14,500k-ft EW Base Shear731.0k960k EW Overturning Moment35,800.0k-ft47,220k-ft Comparison of Seismic and Wind Forces West WingEast Wing Miami, FLWind, N-SWind, E-WSeismicWind, N-SWind, E-WSeismic Base Shear (k) Overturning Moment (k-ft)27,50035,8007,95014,50047,3007,350 Scranton, PAWind, N-SWind, E-W Wind, N-SWind, E-WSeismic Base Shear (k) Overturning Moment (k-ft)10,00012,9007,6005,23017,1007,000 Wind Pressure and Wind Force acting on West Wing, EW Direction o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE LATERAL FRAME LAYOUTS Moment Frame LayoutBraced Frame Layout o Moment Frame o Braced Frame o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE MOMENT FRAME DESIGN STAAD Model for Frame A Etabs Models 1.2D + 1.6W + L + 0.5Lr ETABS Model AE 530 Computer Modeling o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE Frame A Sizes Moment Frame Drift MOMENT FRAME DESIGN o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE Frame A Sizes Original Frame A Sizes MOMENT FRAME DESIGN o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE ETABS Model AE 530 Computer Modeling 0.9D + 1.6W1.2D + 1.6L Lr1.2D + 1.6W + L + 0.5Lr BRACED FRAME DESIGN STAAD Model for Frame A Etabs Models o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE BRACED FRAME DESIGN Frame A SizesBraced Frame Drift o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGECOMPARISONS Estimated Cost Analysis For Frame A OriginalMomentBraced Cost $ 186, $ 567, $ 202, Percent100%304%109% Building Height Change OriginalMomentBraced Height93'98'92' DifferenceN/A5'-1' o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGECOMPARISONS Typical Member Size between 1 st and 2 nd Floor on Frame A OriginalMomentBraced Beam in NSW24x68W36x256W21x68 Beam in EWW30x99W40x372W24x76 ColumnW14x257W14x605W14x176 BracingN/A W14x90 Weight Comparison OriginalMomentBraced Lateral Resisting Members330 k1220 k256 k Total Building Weight18400 k19290 k18600 k Percentage100%105%101% Estimated Cost Analysis For Frame A OriginalMomentBraced Cost $ 186, $ 567, $ 202, Percent100%304%109% Building Height Change OriginalMomentBraced Height93'98'92' DifferenceN/A5'-1' o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGECOMPARISONS Typical Member Size between 1 st and 2 nd Floor on Frame A OriginalMomentBraced Beam in NSW24x68W36x256W21x68 Beam in EWW30x99W40x372W24x76 ColumnW14x257W14x605W14x176 BracingN/A W14x90 Weight Comparison OriginalMomentBraced Lateral Resisting Members330 k1220 k256 k Total Building Weight18400 k19290 k18600 k Percentage100%105%101% Estimated Cost Analysis For Frame A OriginalMomentBraced Cost $ 186, $ 567, $ 202, Percent100%304%109% Building Height Change OriginalMomentBraced Height93'98'92' DifferenceN/A5'-1' Moment Frames have more Architectural Freedom o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE FOUNDATION DESIGN MAT Foundation Design Great for Soil with Low Bearing Capacity Great for Large Column Loads Soil Bearing Capacity of 2500 psf Design is Very Complex Foundation Summary OriginalMomentBraced F.S. BearingN/A2.8 F.S. UpliftN/ANot an issue4.4 F.S. StrengthN/A2.5 Depth into Earth8'-8"10'11'-6" Thickness of MAT4'6'7'-6" o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE MAE REQUIREMENT ETABS Model AE 530, Computer Modeling Typical 2 nd Floor Brace Connection AE 534, Steel Connections Façade Breadth AE 542, Building Enclosures CONNECTIONS o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE FAÇADE DESIGNTerraClad RAIN SCREEN Rain Screen Wall Cladding System  TerraClad Rain Screen manufactured by Boston Valley Terra Cotta Simple to Install Shield from wind driven rain LEED credit opportunities Abundant colors and sizes, match original 6” additional thickness to exterior wall o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE FAÇADE DESIGNTerraClad RAIN SCREEN The Colburn School of Performing Arts The Bechtler Museum of Modern Arts Rain Screen Wall Cladding System  TerraClad Rain Screen manufactured by Boston Valley Terra Cotta Simple to Install Shield from wind driven rain LEED credit opportunities Abundant colors and sizes, match original 6” additional thickness to exterior wall o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE FAÇADE DESIGN Windows/Glazing LGUs with the concept of Sacrificial Ply Typical Window Design WidthHeight Outer Ply Thickness Inner Ply Thickness 2'x4'2'4'1/8"3/16" 6'x10'6'10'1/8"5/8" o Building Introduction o Existing Structural System o Problem Statement o Proposed Solution o New Lateral Loads o Lateral Frame Designs o Façade Design Breadth o Acknowledgements

THE COMMONWEALTH MEDICAL COLLEGE ACKNOWLEDGEMENTS o Penn State Architectural Engineering Faculty Heather Sustersic o Highland Associates Eric McAndrew o TCMC o Family and Friends QUESTIONS?

THE COMMONWEALTH MEDICAL COLLEGE Appendix

THE COMMONWEALTH MEDICAL COLLEGE SOLAR PANEL DESIGN The Bechtler Museum of Modern Arts Brewing-Company HIT Power 220A Photovoltaic Module, by Panasonic Withstand 60 psf Top Energy Producer Highest Output on Cloudy Days Estimated Life-Cycle Cost for 20 years= $ 279,086 Estimated Total Savings = $ 10,000 Estimated Payback Period = 27 years

THE COMMONWEALTH MEDICAL COLLEGE MECHANICAL AND ELECTRICAL GRID-TIED CONNECTION Image from Kahn Solar Reduced in Number of Steam Boilers Number of McQuay Chillers for Cooling stayed the same Main Problem – High Humidity  RLNL-G Dehumidifier by Rheem Money – Saving Efficiency Quiet Operation Quality Remote Monitoring and Control Grid-Tied System Net-metering

THE COMMONWEALTH MEDICAL COLLEGE BUILDING DRIFT Moment Frame DriftBraced Frame Drift

THE COMMONWEALTH MEDICAL COLLEGEASCE 7-10 CODE DIFFERENCE

THE COMMONWEALTH MEDICAL COLLEGE MOMENT FRAMES AXIAL 0.9D + 1.6W1.2D + 1.6L Lr 1.2D + 1.6W + L + 0.5Lr Frame A

THE COMMONWEALTH MEDICAL COLLEGE CONNECTIONS Did not check for Compression Force