© Copyright 2006 POSC1 Gas Lift Scenario Flow Network Construction.

Slides:



Advertisements
Similar presentations
Completion Agenda At the end of this presentation, you will be able to: Define completion Describe the process of completion List and define the different.
Advertisements

Petroleum technology Pressure Sensor © 2012, all rights reserved Gauges Deployment.
GAS LIFT OPERATION By : Ubet Khoirudin TOTAL E&P INDONESIE.
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
1 Product Flow Model May 2008 Product Flow Model Overview.
TROUBLESHOOTING. 5WSS TROUBLESHOOTING ERROR CODEFAULTY INDICATION E1ROOM SENSOR CONTACT LOOSE E2INDOOR COIL SENSOR CONTACT LOOSE E3WATER OUTLET SENSOR.
Basic Refrigeration Cycle
Choke Correlation and Gas Lift Curves P2ES Provides Several Curve Options 1.CC – Choke Correlation Curve Based on Oil Rate (OR) Based on Total Liquids.
GAS PURGE SYSTEMS ‘Manly Hydraulics Laboratory’ 28 th June 2011.
MPD Managed Pressure Drilling GF Landsbyen Outline What is MPD Why MPD Conventional drilling vs MPD.
AP PHYSICS. p. 423 #59 A 1500W heat engine operates at 25% efficiency. The heat energy expelled at the low temperature is absorbed by a stream of water.
GARP®Presentation ALRDC Seminar May 14 th, 2014 Daryl Mazzanti – Garp Services, LLC Wholly owned subsidiary of Evolution Petroleum Corp (EPM- NYSEMKT )
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Experimental Investigation of Gas Lift Instability and Dynamic Regulation to Control It Author/presenter: Christer Andre Larsen, NTNU Co-author:
Fluid in Motion.
Enabling Integration of Core Work Processes in Upstream Oil and Gas
Assessment of Engine Breathing Capacity P M V Subbarao Professor Mechanical Engineering Department Measure of Filling & Emptying Effectiveness….
Petroleum Engineering
MEL713 – DESIGN OF I.C. ENGINES: COMPONENTS & SUB-SYSTEMS P M V Subbarao Professor Mechanical Engineering Department Laboratory & Design Practicals …..
ASME/API GAS LIFT WORKSHOP DOWNHOLE GAS LIFT AND THE FACILITY John Martinez Production Associates ASME/API GAS LIFT WORKSHOP.
© Copyright 2005 POSC Production Reporting (draft specifications) Overview.
Mueller Environmental Designs Inc. FRED MUELLER 2003.
ASME – WORK SHOP - KUALA LUMPUR 2003 By:
By: Gatut Widianoko Weatherford Artificial Lift Systems
Remote Operation of Gas-lifted Wells John Stewart Shell Technology.
2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo.
ASME Gas Lift Workshop Spring 2004 Dual Gas Lift Breakout Session Dual Gas Lift Breakout Session February 10, 2004.
© ChevronTexaco 2001 Use of Transient Simulators to Assess Gas Lift Viability for Offshore Angola 2002 North American Gas Lift Workshop SHAUNA NOONAN /
Analysis of Gas Lift Transient Effects Henry Nickens Adam Ballard BP - Houston.
© Copyright 2006 POSC1 Production Reporting Overview.
Shell Global Solutions PRODML Business Overview Ron Cramer.
Equipment Development for Gas-Lift in Sub-Sea Operations Roger Stinson Product Manager - Gas Lift Schlumberger Completions Systems.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
PDVSA INTEVEP Accumulation Process and Phenomena in Chamber Lift Completions Sergio Caicedo ASME/API Gas-Lift Workshop Houston, Texas, Spring 2002.
Paulus obey DAPCEP 3/29/14. A petroleum engineer is involved in nearly all of the stages of oil and gas field evaluation, development and production.
LAFAYETTE, LA NEW ORLEANS, LA HOUSTON, TX.
© Copyright 2005 POSC Volume Reports and Flow Networks Overview.
© Copyright 2005 POSC Product Flow Model Overview.
LSU Petroleum Engineering Research and Technology Transfer Laboratory “The Well Facility”
Most size, pressure, temperature, and chemical requirements PetersenWWW.pipeplug.com Tel ( ) Fax
NUMERICAL MODEL FOR THE PREDICTION OF FLUID PRODUCTION AND GAS CONSUPTION OF GAS CHAMBER PUMPS PDVSA INTEVEP Fall 2001 ASME/API Gas Lift Workshop Aberdeen.
Robert Lestz - Chevron 28 Feb 2006 Impact of Surface Facilities on Addressing Liquid Loading Breakout Session.
ARTIFICIAL LIFT METHODS
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
West Memphis Terminal Procedures EQU-604-WM Oil Water Separator Alarms Influent to Lift Station #40 08/30/2007 2/25/20161 Oil Water Separator – Influent.
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Introduction to Well Completions
Lecture 10 Production Engineering
Gas Dynamics of Flow through Valves Method to Estimate the Flow Capacity of Valve Passage…. P M V Subbarao Professor Mechanical Engineering Department.
EGLV – ELECTRIC GAS LIFT VALVE (Field Trial at S181) - THE OPERATOR’S PERSPECTIVE.
Valve Types Gate valves, Ball valves, & Choke valves. Gate valve: used on oil producer wellhead tree. (2 manufacturers Gray & Cameron). Ball valve: only.
DOWNHOLE EQUIPMENT FOR CONPLICATED CONDITIONS
Visit for more Learning Resources
WHY? HOW? Test Valve Measure Vibrations Contain Valves
Date of download: 10/23/2017 Copyright © ASME. All rights reserved.
A PROPOSAL TO TRANSPORT FLUIDS FROM WELLHEAD TO FLOW STATION USING A GAS DISPLACEMENT PUMP. Juan Carlos Brown, 6th July 2017.
Technical data‘s of lubrication pumps of oil loaded gas compressors medium : lubrication oil with flare gas Low pressure compressors on oil platform 6.
Question 1) Are two ports current leads?
Overview of Production Engineering K12PG42. Topic Covered  Well Completion and Its Types  Perforation Types ( including Gun Types)  Workover Job 
Automated Gaslift Control Pecten Cameroon Company
Houston, 4th & 5th February 2003
Production Reporting (draft specifications)
Active Control of Gas Lift Wells Simulation and Experimental Series
Flow Network Construction
CHAIR - JIM BENNETT EXXONMOBIL
Fracking in Culver City
Group learning challenge 1
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Gas-Lift Breakout Session Report Out Fall 2003 Gas-Lift Workshop
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Presentation transcript:

© Copyright 2006 POSC1 Gas Lift Scenario Flow Network Construction

© Copyright 2006 POSC2 Draw the real world diagram indicating measurement points Compressor 2 Compressor 3 Compressor 1 Separator Wing & Master Valve Controller or Casing Choke Flowline Choke Perforations Tubing Casing Lift-gas Production To Well From Well To Well Gas Header Production Header Gas Lift Valve Packer Valve Choke Measurement # 1

© Copyright 2006 POSC3 Description of Measurement Points in Diagram 1Bottom hole pressureWell (Subsurface) 2Bottom hole temperatureWell (Subsurface) 3Flowing tubing head pressureWell (Surface) 4Annulus pressureWell (Surface) 5Lift gas pressure (CHP)Well (Surface) 6SSSV statusWell (Surface) 7SSV statusWell (Surface) 8Chemical injection flow (Injection gas)Well (Surface) 9Chemical injection (Injection gas) ppmN/A 10Lift gas control valve percent openWell (Surface) 11Lift gas rate setpointN/A 12Lift gas pressure (upstream of meter)Well (Surface) 13Lift gas meter differential pressure (dp)Well (Surface) 14Lift gas meter temperature (upstream of control valve)Well (Surface) 15Lift gas flow rateN/A 16Lift gas temperaturen/a 17Chemical injection flow (Production)Well (Surface) 18Chemical injection (Production) ppmN/A 19Sand detectionWell (Flow line) 20Flow line pressure differentualWell (Flow line) 21Flow line pressureWell (Flow line) 22Flow line temperatureWell (Flow line) 23Bulk lift gas temperatureInjection Manifold 24Bulk lift gas pressureInjection Manifold 25Total gas production rateN/A 26Water production rateN/A 27Net oil production rateN/A

© Copyright 2006 POSC4 Draw Boundary around items with no measurements

© Copyright 2006 POSC5 The boundary becomes a Unit in the flow network. From Well Compressor 2 Compressor 3 Compressor 1 Separator Lift-gas Production To Well D B A G C E F H From Well Measurement # Unit Flow (from/to port) 1 F