The Basics of CFI ABMB CFI.avi  At-Grade Intersection  Left-turns happen in advance of the main intersection  Movements occur simultaneously  This.

Slides:



Advertisements
Similar presentations
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Advertisements

Road Diets and Roundabouts
HFST Council Meeting FHWA Update Frank Julian Federal Highway Administration Resource Center - Safety and Design Team August, ATSSA Mid Year.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Comprehensive Pedestrian Enforcement Captain Thomas C. Didone Montgomery County, MD Police Department 1.
Formerly Known As Superstreets By Tanya Bankston.
Workshop Presentation for Homedale, Owyhee County & Homedale Highway District for Homedale, Owyhee County & Homedale Highway District Corridor Management.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Safety at Signalized Intersections. Signalized Intersections FHWA Safety Focus Areas 2.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions.
ENSURING DRIVABILITY: CHALLENGES AND SOLUTIONS FOR AMERICA’S ROADS A survey of pavement officials and the driving public The Asphalt Pavement Alliance.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Traffic Signal Warrants
Access Management: Why And How? An Introduction To Access Management Problems, Principles and Treatments.
Unconventional Arterial Intersection Design University of Maryland Advanced Transportation Day Aug. 28th 2014 Traffic Safety and Operations Lab University.
Aerial view of Missouri Boulevard, Jefferson City. Five-Lane With Two-Way Left- Turn Lane and High Driveway Density. Missouri Boulevard Ground Level View--Strip.
Module 5 Displaced Left Turn (DLT) Intersections
Miller Road Feasibility Study & Reconstruction Project Information and Kick-off Meeting Presented by: The Corradino Group of Michigan, Inc. ROWE INC. Genesee.
Workshop Presentation for Canyon County Jurisdictions for Canyon County Jurisdictions Corridor Management Plan.
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
13 th Street and Dayton Avenue – Ames, IA Intersection Study ByungOck Kim Greg Karssen.
Analysis of the SHRP 2 Naturalistic Driving Study Data [S08(B)] Evaluation of Offset Left-Turn Lanes Jessica M. Hutton Presentation to MCTRS August 15,
LSU HURRICANE CENTER Addressing Hurricanes and Other Hazards and Their Impacts On the Natural, Built and Human Environments Recent Lessons Learned in Highway-Based.
Rural Intersection Collision Avoidance System (RICAS) US Highway 53 and State Highway 73 Minong, Wisconsin Additional information Project Website:
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
December 2006 Study Update We’ve been busy since our last round of advisory committee and task force meetings were held in the summer and fall. Our next.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
Driver’s Education Chapter 7 Negotiating Intersections 12/11/12 What do you think the difference is between a controlled and uncontrolled intersection?
Section 3 (Day 6) Basic Maneuvering Tasks: Low ,
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
LADOTD Statewide Traffic Engineers Meeting June 19, 2014 Traffic Signal Timing Project Update Nick J. Ferlito, Jr., P.E., PTOE Neel-Schaffer, Inc.
“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
MIDCAP Maryland Intersection and Interchange Design & Capacity Analysis Program.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
Created by: Joshua L. Hochstein Tom Maze & Tom Welch September 2008 Iowa State University’s Center for Transportation Research and Education (CTRE) administers.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
2012 UPDATE Peter A. Allain, PE Louisiana Department of Transportation and Development.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015.
Scott R. Falb Michael D. Pawlovich Iowa Department of Transportation 29 th International Traffic Records Forum July 14, 2003 A Study of the Effects of.
Module 1 Introduction Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Arterial Travel Times Using Bluetooth Detection Presented by Amit Sidhaye, P.E., PTOE Project Manager SIGNAL SYSTEMS & ITS ARLINGTON COUNTY May 16, 2013.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Lessons Learned from Intersection Improvements on U.S. Highway 280 PMI Central Alabama Chapter Darrell B. Skipper, P.E.
New Research on Dynamic Reversible Left-Turn Lanes at Signalized Diamond Interchanges ITE Mid-Colonial Annual Meeting (Wilmington, DE) April 18 th, 2016.
us 30 and SR 603 – Ashland county September 7, PUBLIC meeting
Florida Department of Transportation
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
ROUNDABOUTS Improving Safety and Efficiency
Double Crossover Diamond Interchange
Harbour Island Force Main Replacement
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Space Coast Vision Zero Task Force Workshop #1 September 25, 2019
Presentation transcript:

The Basics of CFI ABMB CFI.avi  At-Grade Intersection  Left-turns happen in advance of the main intersection  Movements occur simultaneously  This eliminates phases from the signal  More capacity  Less Congestion  Intuitive to drivers (turn left to go left)  Many possible configurations

CFI Efficiency 650 Conventional 4-lane roadway 650 v/l/h x 4 lanes = 2600 v/h C=150 P.M. Peak

CFI Efficiency Conventional 4-lane roadway 650 v/l/h x 4 lanes = 2600 v/h C=150 P.M. Peak 650 CFI 4-lane roadway 850 v/l/h x 4 lanes = 3400 v/h C=120 P.M. Peak 850

Some History  Concept Developed over 25 Years Ago  Featured in Numerous Research Efforts & Publications  Over 60 Currently Operating  AASHTO’s 2002 National Award for Innovation

More History  LADOTD and ABMB Began Discussing Possible CFI Applications  Construction of the Airline / Siegen CFI Began in the Summer of 2005  Then …

Katrina… 9/19/20157 Katrina...

Katrina Effects  Construction Delayed for Several Months  Influx of Temporary and Permanent Residents  24-Hour Counts Still +19% Over Pre-CFI Volumes  Peak Hour Counts Increased Erratically

Design Volumes (Projected 2004) Post – Katrina Volumes (May 8, 2007) Free Free Airline Hwy. Siegen LaneSherwood Forrest Airline Hwy. Siegen LaneSherwood Forrest -42% 16% -24% 17% 20% -3% 18% 12% 82% 25% -14%

March 21, 2006 – Opening Day

The Bad News  Actual Volumes Much Higher Than Design Volumes Katrina “Avoiders” Returned to Intersection  Unbalanced Increases Made Timing Adjustments Challenging The Good News  Operations Greatly Improved Travel Times down 40% Average Delay Less than ½ Previous  Driving Public Satisfaction  Safety

Cumulative Accident Data: Twelve Month Period (March-March)

Cumulative Accident Data: Six Month Period (March-September)

Preliminary Safety Analysis Total Accidents Down 25% Serious Accidents Down 34%

Misconceptions  Confusing to Drivers  What if the Power Goes Out?

Public Acceptance

Day Before Opening

4 months later

The Advocate

225 Magazine June 2007

The Advocate

Public Acceptance Survey

Question 3a: State below whether you think the improvements make TRAFFIC CONGESTION Better, Worse, or the Same…

Public Acceptance Survey Question 5. Please indicate your level of satisfaction with the current traffic conditions of the intersection. 92% Satisfied

LADOTD CFI Task Force  Formed to evaluate this and future CFI’s  Comprised of key LADOTD department heads, FHWA, City, Law Enforcement and consultant  The study looks at Operational Performance, Design Elements, Safety and Public Acceptance  Final report coming soon (3 months +/-) FHWA Unconventional Intersection Study  Study will evaluate operational performance, safety and driver behavior for 3 unconventional intersections: 1. CFI – Airline at Siegen, Baton Rouge, Louisiana, opened March CFI – Bangerter at 3500 South, Salt Lake City Utah, construction starts early DDI – Kansas City, Missouri

Where is CFI Today?  Louisiana – 1 Open, 8 studied or currently under study 1. Airline Highway at Siegen Lane (Open) 2. Airline Highway at Goodwood, Old Hammond, Bluebonnet, Jefferson 3. Florida Boulevard at Sherwood Forest Boulevard 4. Alexandria Traffic Circle 5. Ambassador Caffrey Parkway at Johnston Street 6. Statewide Study on-going, All Districts (90+ Intersections)  Maryland – 1 operational, 6 studied or currently under study MD 228 at MD 210 (operational) 1. MD 140 Corridor Study – 7 intersections / 3 CFI’s 2. US 29 at Stewart Lane / Eden Lane 3. MD 140 at Painters Mill Road 4. MD 213 at US 40

 Mississippi – 1 Under Construction, 1 Under Design 1. US 61 at Junkin Drive (Under construction, 2010 Opening) 2. US 49 at State Route 53 (Final Plan Stage) 3. US 61 at Devereaux Road 4. Jackson at State Route 6  Ohio – 1 Under Construction, 1 Under Design, 5 studied or currently under study 1. Austin Pike at State Route 741 (Under Construction) 2. Beachmont at 5-Mile (Preliminary Design) 3. Columbus Pike at Powell Road 4. Brice Road at Scarborough / Tussing Boulevard 5. State Route 32 at Glenestre 6. State Route 32 at Bells Lane 7. State Route 32 at Baur Road  Utah – 1 Open to Traffic Bangater Hwy at 3500 South  Arkansas - 1 studied Shackleford Highway at I-630 / Financial Center Parkway Statewide Study on-going

Questions Laurence Lambert, P.E., PTOE

Opening

Accident Data Four-Leg Signalized CFI March 21-September 21 March 22-September 21March 21-September 21 Type of Collision Fatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTota l Rear End Merging/Diverging/Si de Swiping Crossing(Left Turn) Crossing (angle) Right Angle Right Turn Head On Total Four-Leg Signalized CFI June 1-August 31 Type of Collision Fatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTota l Rear End Merging/Diverging/Si de Swiping Crossing(Left Turn) Crossing (angle) Right Angle Right Turn Head On Total

Operations