RENESENG Kick-off Meeting Athens, 28-29 November 2013 Sara Giarola Mayank Patel Prof. Nilay Shah Centre for Process System Engineering Imperial College.

Slides:



Advertisements
Similar presentations
© 2000 Scott Moses Career Paths for Industrial Engineers Scott Moses Assistant Professor School of Industrial Engineering University of Oklahoma.
Advertisements

RENESENG:Renewable Systems Engineering grant Marie Curie Initial Networks (ITN) WP7. Summer schools and Workshops (leader CERTH) Chemical Process and Energy.
Ensure Vendor/Engineer of Choice Product Quality
Unilever IT Career Framework Daryl Beck IT Excellence Thursday 6 th December 2007.
Multi-scale Planning and Scheduling Under Uncertain and Varying Demand Conditions in the Pharmaceutical Industry Hierarchically Structured Integrated Multi-scale.
DOE/USDA Biomass Feedstock Gate Review Meeting March, 2005 Note: Each presentation is allotted 35 minutes; 20 min. for the presentation and 15 min. for.
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
Nowlin Chair Crop Modeling Symposium November 10-11, 2000 Future Needs for Effective Model Applications James W. Jones  Users  Model Capabilities  Data.
Lecture 13 Revision IMS Systems Analysis and Design.
Information Systems Eras Evolution of Information Systems (Modelling and Tools) Babak Akhgar (Time Frame)
©2010 Energy Technologies Institute LLP The information in this document is the property of Energy Technologies Institute LLP and may not be copied or.
BIOMASS FUTURES: Biomass role in achieving the Climate Change & Renewables EU policy targets. Demand and Supply dynamics under the perspective of stakeholders.
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Selecting and Developing Courses for Police Product Road Map.
Review of eStorage’s first year results WP3 Benefits of Storage and Regulatory Framework & Market Design 30 October 2013 Wim van der Veen - DNV KEMA.
RENESENG - Renewable Systems Engineering: Project Overview Antonis C. Kokossis National Technical University of Athens Kick-off meeting, Athens, 28 Nov.
Sam Jackson Southeastern Region GIS Efforts University of Tennessee Office of Bioenergy Programs Knoxville, TN
Supervisory Board All scientist in charge + external representatives of ER/ESR Coordinator (NTUA) EU Marie Curie Programme Project Officer Recruitement.
Biomass Logistics and Site Selection. About Strata-G Founded by UT Agricultural Engineering graduate Approximately 120 staff Offices in Tennessee, South.
RENESENG builds dedicated systems engineering technology for biorefineries. RENESENG builds tools to prevent expensive experimentation saving capital,
Intelligent Cargo in Efficient and Sustainable Global Logistics Operations WP5 – Open End-to-End Pilots Implementation Jose Gato Luis –
Lecture Outline 8 “OTHER SYSTEMS” 2. GEOGRAPHIC INFORMATION SYSTEMS (GIS) *MC p delivery manager may want to know the shortest distance a truck.
Mali Work Packages. Crop Fields Gardens Livestock People Trees Farm 1 Farm 2 Farm 3 Fallow Pasture/forest Market Water sources Policy Landscape/Watershed.
Active Monitoring in GRID environments using Mobile Agent technology Orazio Tomarchio Andrea Calvagna Dipartimento di Ingegneria Informatica e delle Telecomunicazioni.
C R O P S T O I N D U S T R Y WP4 TaskS 4.1 & 4.2 Task leader: ICCEPT Crops2Industry “Non-food Crops-to-Industry schemes in EU27” Calliope Panoutsou &
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
Workpackage 5 Domain applications : validation, evaluation, and on-site training Els Schulten.
Issues in (Financial) High Performance Computing John Darlington Director Imperial College Internet Centre Fast Financial Algorithms and Computing 4th.
WP 9: Dissemination of results and exploitation RENESENG kick off, Athens, Nov 2013.
First 5 LA Phase III Website Strategic Plan Presentation to Public Affairs Committee July 13, 2006.
Supply chains for the UK to 2050 A. Bauen (*), R. Slade, S. Jablonski and C. Panoutsou The context The aim of this work is to explore the potential for.
RENESENG - kick-off meeting - Athens, Greece November 28/29 th, 2013 Franjo Cecelja.
RENESENG Kick-off Meeting Athens, November 2013 Sara Giarola Mayank Patel Prof. Nilay Shah Centre for Process System Engineering Imperial College.
BIOSYNTH: A software for the automatic generation of superstructures for biorefineries National Technical University of Athens 1 RENESENG MTR meeting.
Managed by UT-Battelle for the Department of Energy Logistics of Biomass Supply Agricultural crops and residues Shahab Sokhansanj, Ph.D., P.Eng. Bioenergy.
ELOGMAR-M Review Meeting, Shenzhen, 31/03/ First Review Meeting - Web-based and Mobile Solutions for Collaborative Work Environment with Logistics.
Presented By Dr. Mohsen Alardhi College of Technological Studies, Kuwait April 19 th,2009.
Chapter 3 Strategic Information Systems Planning.
Project Management Theory. Planning a Project Identify the problems and inefficiency of system. – Design brief Design brief: A statement that contains.
Project Management and Risk. Definitions Project Management: a system of procedures, practices, technologies, skills, and experience needed to manage.
WP 9: 1 st Planning meeting summary Clarification between WP members of common objectives: Workshop planning and logistics with time- line Planning for.
CSC480 Software Engineering Lecture 5 September 9, 2002.
Main Function of SCM (Part II). Main Functions  Procurement (supplier selection, optimal procurement policies, etc.)  Manufacturing (plant location,
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
2005 OBP Biennial Peer Review Selective Harvest Kevin L. Kenney, Christopher T. Wright Biomass Feedstock Interface Platform November 14, 2005.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Distributed Data Analysis & Dissemination System (D-DADS ) Special Interest Group on Data Integration June 2000.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
© Services GmbH Project work plan 2/20/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
CYSSC - Cluster 2.0 Partner Management Final Deliverable High Sensitivity Sep 2, 2011 Cluster 2.0 Project Team.
2005 OBP Biennial Peer Review Platform Analysis Overview Bob Wallace, NREL Integrated Biorefinery Project Date: November 16, 2005.
WP4 – Cloud Platform & Provisioning Technical Review Period 1 This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
7T7beACtQs. What actions are you taking as a result of what you heard at the conference? How will what you heard at.
Event Project Management By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
BIG DATA. The information and the ability to store, analyze, and predict based on that information that is delivering a competitive advantage.
 CHANNELS OF DISTRIBUTION  DISTRIBUTION STRATEGY  SUPPLY CHAIN MANAGEMENT/LOGISTICS Place (Distribution)
Overview of Software Project Management cont Review – Class 6 Scheduling Tasks Project Management Activities CEN 4010 Class 8 – 09/22.
SIMONA MURRONI Bruxelles - June 27th 2013 Bridging lessons learned from the past with new planning and delivery approaches in the energy sector.
E-Engineering enabled by Holonomic and Universal Broker services 09/09/04 1 Global Project Planning: a Novel Approach through a Universal e-Engineering.
Go LNG LNG Value Chain for Clean Shipping, Green Ports and Blue Growth in Baltic Sea Region.
IE 8590 Capstone Design Project: Course Overview
WP1 – Smart City Energy Assessment and User Requirements
LOGISTICS NETWORK.
General presentation of SMART GROUND project
Establishing Strategic Process Roadmaps
The Process Owner is the Secret Agent!
Place image in this area.
BSR LNG Business cluster
Construction Supply Chain Modeling: Issues and Perspectives (Part 1)
CYnergy Kick-Off Meeting
Presentation transcript:

RENESENG Kick-off Meeting Athens, November 2013 Sara Giarola Mayank Patel Prof. Nilay Shah Centre for Process System Engineering Imperial College London WP6. Systems tools and software

WP6 overall scope This work package consolidates developments from WP1- WP4 by setting up  clusters of modelling and decision support software,  repositories of data, information and knowledge for engineers and biorenewables analysts generated in WP1 – WP4 and validated in WP5 WP6 is aimed to commercial engineering products delivery RENESENG Kick-off Meeting 29th November

WP6 Tasks T6.1 Knowledge engineering models and communication hubs (UoS, NTUA, EPFL): The task is intended to help RENESENG organize the vast range of resources produced by its different WPs (models, data, reports, internet sites) also offering means to also invite and integrate with resources outside RENESENG. T6.2 Platform for high-throughput screening of processes and technologies (NTUA, UoS, EPFL, Imperial, DTU): The proposed platform will enable access to collection of biorefinery related functions developed in WP1 – WP4 to enable (a) screening of industrial chemistries and technologies, (b) targeting of equipment efficiency for reaction and fractionation, and (c) the targeting of the system integration. RENESENG Kick-off Meeting 29th November

WP6 Tasks T6.3 Biorenewable workbooks (NTUA, UoS, EPFL, Imperial, DTU, QUANTIS, DLO, CERTH) : The task is using models in T6.1 to create shareable repositories intended to integrate data and information generated by RENESENG into an accessible and sharable environment. T6.4 Roadmap visualization of supply chains (Imperial, UoS): This task aims to produce strategic decision roadmaps from available portfolios of feedstocks, chemistries, technologies and business models, of a spatial and temporal nature. T6.5 Global BioRefinery Costing Early Estimation tool (Arkema, NTUA): The objective is to contribute to build a method for fast Capital Cost (CAPEX) and Operating Cost (OPEX) Evaluation for Technologies under development like the Biorefineries. RENESENG Kick-off Meeting 29th November

WP6 Milestones 6.1 Completion of knowledge engineering models and communication hubs  UoS 6.2 Completion of platform for high-throughput screening of processes and technologies  EPFL 6.3 Completion of biorenewable webbooks  UoS 6.4 Roadmap visualization of supply chain toolkit delivery  Imperial RENESENG Kick-off Meeting 29th November

Communicate and transfer data in a consistent way within the consortium Standardised characterization  i.e. IDs, technical/economic/environmental description of feedstock process product RENESENG Kick-off Meeting 29th November M6.4: Roadmap visualization of supply chains toolkit delivery

Tool for optimal process selection and network design Strategic and operational optimisation of the biorefining and supply chain system  modelling framework might vary depending on the kind of approach for the processing path design (WP3) User-friendly GUI  easy parameter input  results visualization RENESENG Kick-off Meeting 29th November M6.4: Roadmap visualization of supply chains toolkit delivery

RENESENG Kick-off Meeting 29th November Input to change: -assumptions on feedstocks -hypotheses on technologies -definition of product demand (quality/quantity) -link with GIS database Planning decisions -biorefinery location -biomass catchment areas -logistics -process technology Operating decisions -scheduling resource allocation storage

M6.4: Roadmap visualization of supply chains toolkit delivery Results for different perspectives RENESENG Kick-off Meeting 29th November Managerial results Engineering results

Supply chain toolkit functionalities Changing the objective function Changing the system resolution or the region of study Changing the assumptions around resources and land-use Changing the assumptions about the allowed technologies e.g. including variability on the yields and allowed transportation infrastructure/modes Changing the assumptions about the policy environment, including subsidies or opportunity cost for niche crops RENESENG Kick-off Meeting 29th November

WP6 Deliverables RENESENG Kick-off Meeting 29th November MilestonesLeading D6.1Delivery of bio-refineries knowledge modelUoS D6.2Delivery of high-throughput platform with workbooksUoS D6.3CAPEX modelling tool for BiorefineriesArkema

WP6 Gantt Chart RENESENG Kick-off Meeting 29th November