ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.

Slides:



Advertisements
Similar presentations
Organization of Primary Entities
Advertisements

Chapter 6 Business-to-Business (B2B) Marketing
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Vergabeformen Building Procurement – Contract strategy Procurement Systems – an initial overview Proper choice of delivery system can help to reduce conflicts.
Program partners engage in a broad range of security cooperation activities to include homeland defense/security, disaster response/mitigation, consequence/crisis.
Professional Performance in Engineering Russell Scott Member PPIR Project Steering Committee Deputy President, IChemE Director, Uhde Shedden Australia.
Why and how we became a mutual Graham Barnes MyCSP Ltd.
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
International Procurement Agency BV USE OF PROCUREMENT AGENTS IN PUBLIC PROCUREMENT ADB REGIONAL SEMINAR SEPTEMBER 5 - 7, 2012 Presented.
NATURE OF CONSTRUCTION BUSINESS Aleš Tomek Faculty of Civil Engineering Department of Economics and Management CZECH TECHNICAL UNIVERSITY IN PRAGUE.
Novel Procurement Options ARBE121 – PFI  Variants, additions to or environments for routes  Private Finance Initiative (PFI) A funding & operational.
Connecting people, society and the economy to a location UNSC Learning Centre 25 February 2013 Peter Harper Deputy Australian Statistician Australian Bureau.
Innovation in megaprojects Andrew Davies* PhD Course Part 1: Innovation in Projects BI Norwegian Business School May 2015 *Professor Management of.
CONSTRUCTION INDUSTRY OVERVIEW AND FACTS. VALUE OF CONSTRUCTION Construction put in place during June 2002 was estimated at a seasonally adjusted annual.
I-THE OWNER’S PERSPECTIVE
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
ISO 9001 Interpretation : Exclusions
Business Services in Europe: Raising the Game Norman Rose Vice-Chairman High Level Group on Business Services & Chairman European Business Services Round.
Lecture 8 Understanding entity and its environment
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Chapter 3 The purchasing management process
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Patrick DeCorla-Souza, P3 Program Manager, FHWA
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
INNOWATER INNOWATER A Public-Private Innovation Partnership for Better Innovation Support Tools and Delivery Mechanisms in the Water Sector
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Diploma in Procurement & Supply
Information Seminar on the Framework for Public Private Partnerships in Ireland Alexander Hotel, Dublin 3 rd June 2003.
Copyright 2010, The World Bank Group. All Rights Reserved. Construction statistics, part 1 1 Business statistics and registers.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Building capacity in Central Asia to utilize trade policy for human development (Uzbekistan report) Dilshod Akbarov Research Coordinator, UNDP Uzbekistan.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Size Standards Analysis: SBA Methodology Presented to: The Council on Federal Procurement of Architectural & Engineering Services (COFPAES) By: Khem R.
BCT 100 Overview of the Construction Industry. The Construction Industry What is the ‘Construction Industry’? Who works in this industry? Why is it important?
UK government policy on social enterprise and public procurement Jonathan Bland 1.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Human Resource Management: A Case Study Approach The Context of HRM Your title and name Your university‘s name Title course Your University logo.
CHAPTER 1 MANAGEMENT IN THE ENGINEERING AND CONSTRUCTION INDUSTRY CONSTRUCTION'S FUTURE:  Increasing size of projects & Organizations  Increasing technological.
Head Office Hannay House 39 Clarendon Road Watford Hertfordshire WD17 1JA UK Telephone: +44 (0) Facsimile: +44 (0)
Chapter 1 Introduction to the Real Estate Business The real estate business is more than just houses. As this chapter says, “Real estate is big business,”
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Type of Project ShahRukh Haider. Main Type  Major Types of Projects Based on Product of Project  Here is a list of nine different types of projects.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering.
Ch 1 Construction accidents 1. Health and safety definitions Health is the protection of the bodies and minds of people from illness resulting from the.
October, 2007 ABPS Infrastructure Advisory ABPS Infrastructure Private Limited _________________________________________ INTERNATIONAL ENERGY AGENCY IMPLEMENTING.
Boosting Tourism in Qatar to Drive the Commercial Construction Market.
SPANISH LAW on SOCIAL ECONOMY 5/2011 Miguel Ángel Cabra de Luna, PhD Member of the European Economic and Social Committee, Spanish Enterprise Confederation.
Nordic transport infrastructure market – modelling and forecasting methods for asset management and business development Markku Riihimäki, Pekka.
WORLD ACCREDITATION DAY PRESENTATION GLOBALIZATION AND THE CONSTRUCTION INDUSTRY IN KENYA Dr. Eng. Siphila W. Mumenya th June 2017.
Make or Buy transport.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
The public – private continuum
PROJECT DELIVERY METHODS
the actual procurement
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
Perspectives of BIM Implementation in Romania
Careers in Architecture & Construction
Public - Private Dialogues and the Policy Process
Introduction DEFINATION :-
Careers in Architecture & Construction
UNDERSTANDING THE ENTITY AND ITS ENVIRONMENT AND ASSESSING THE RISKS OF MATERIAL MISSTATEMENT Topic 5.
Presentation transcript:

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria DESIGN AND BUILD PROJECTS IN NIGERIA INTRODUCTION THE NATURE OF CONSTRUCTION INDUSTRY IN NIGERIA CONCEPT OF DESIGN AND BUILD RISKS ASSOCIATED WITH DESIGN AND BUILD PROJECTS OTHER CONSTRUCTION PROJECT FINANCING METHODS IN NIGERIA CONCLUSION

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria INTRODUCTION Design and Build procurement method was first developed in Recently, it has become a common and preferred procurement method used for complex construction projects in Nigeria by developers aimed towards minimizing risk, especially when such projects involve numerous parties and organisation. However, Design and Build is defined as a method of project delivery in which one entity (Design and Builder) undertakes a single contract with the owner to provide for architectural or engineering design services and construction services

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria THE NATURE OF CONSTRUCTION INDUSTRY IN NIGERIA The construction industry can be divided into three major segments. These include; Construction of building by Building Contractors, or General Contractors. These contractors build residential, industrial, commercial, and other buildings. The second category is the Heavy and Civil Engineering Construction Contractors that build sewers, roads, highways, bridges, tunnels, and other projects. Specialty Trade Contractors who perform specialized activities relating to construction such as carpentry, painting, plumbing, tiling, and mechanical and electrical works form the third segment.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria The construction industry operates in both the private and public sectors, engaging in three broad areas of activity; residential building, non-residential building and engineering construction. Demand for, and supply of, these services is driven by economic factors including population growth and consumer confidence, changes in interest rates and inflation. Most recently, government policies affecting housing and infrastructure projects have been an influence. The availability of resources, such as labour and building materials, and changes within closely linked sectors (e.g. agriculture, mining and manufacturing), also drive change in the industry.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria CONCEPT OF DESIGN AND BUILD A number of construction agencies have been researching on a wide variety of innovative project delivery strategies aimed at lowering cost, time and quality. One of these strategies is design and builds project delivery. As earlier stated, Design and build was first developed in 1960 and has become a common and preferred procurement method used by developers to minimize risk in complex construction projects involving numerous parties and organisation. Design and Build is a system where one person, company or organization provides comprehensive service from the design to construction of the project with all the human resources secured in house.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria Similarly, design and build of the project can also be described as a project undertaken by a single entity which enables some part of construction work to begin before the final design is completed. It results to shortening of project duration and reduction of administration and inspection cost. It also reduces variation and claims.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria RISKS ASSOCIATED WITH DESIGN AND BUILD PROJECTS Possible risks and events can cause a project to fail to meet its goals. They range in impact from trivial to fatal and in likelihood from certain to improbable. Since risk considerations dictate the path a development must take, it is expedient that those risks be catalogued candidly and completely Every building procurement method has basic characteristics that define its framework

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria Irrespective of the procurement method, it is important to identify and assess the inherent risks so as to structure the risk management techniques to be adopted. Design and build is a risky system of project delivery for both owners and contractors expect if the risk is identified, analysed and managed throughout the project and determined how the risk should be shared among the parties involved. The risk analysis and management is an important tool for the success of design and build project

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria OTHER CONSTRUCTION PROJECT FINANCING METHODS IN NIGERIA Traditional method of construction refers to the Direct Method of construction in which the client (the owner of the construction project) engages the tradesmen to fix the construction without a coordinating contractor. In Direct Labour Method of construction, the client designs his building and call different tradesmen which do not form a team to work for him

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria CONCLUSION Traditional construction contracts have been tested for nearly 100years in the crucible of the twentieth century whereas Design and Build contracts have received little attention as a result the risks involved are less understood and contractual provisions for resolving them are less well settled. Design and build has a lot of inherent, unresolved and undefined cost related factors that result into risk that will affect its procurement. However, the risk is highly related to cost and time, while risk factors at construction are due to planning and design at the inception stage of the project