The Policies and Procedures of the IEEE 802 LMSC 17-March-2008.

Slides:



Advertisements
Similar presentations
Welcome to IEEE 802 Newcomer Orientation
Advertisements

Standards Development: An Overview
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Overview of the IEEE Process IEEE P1620 Working Group Meeting 18 September 2002.
July 2010 Notes on IEEE 802 Rules Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
Doc.: IEEE 802 EC-12/0008r0 Agenda February 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
Ec-12-0xyz EC Rules November 2012 James Gilb (Tensorcom) IEEE 802 Rules Update November 2012 meeting.
Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Doc.: IEEE /0623r1 Submission May 2009 Jon Rosdahl, CSRSlide 1 Proposal for P&P Change - # Date: Authors:
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
March 2010 Plenary Session Slides for Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Draft 03 Feb 26, PM EST1 Potential CAG/Sponsor Conflicts: an 802 perspective The IEEE SA endorses many projects –imperative principles of the SA:
Welcome to IEEE 802 Newcomer Orientation David Law, Pat Thaler 6 March
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 LMSC Policy and Procedures Update Date: July 18 th, 2005 Author: Matthew.
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Emergency Services EC SG Report to 802 EC Geoff Thompson/Interdigital Study Group Chair (as appointed by 802 chair) 802 Executive Committee Friday Session.
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2007 Slide 1 EC LMSC Policy and Procedures Update Date: July 16 th, 2007 Author: Matthew.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 LMSC Policy and Procedures Update Date: March 14 th, 2005 Author:
IEEE 802® Financial Workshop LMSC Plenary – Orlando 15 March 2004 Karen Kenney – Associate Managing Director, IEEE-SA Bill Quackenbush – LMSC Treasurer.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 Keep 802 Together Proposal Date: March 15, 2003 Point of Contact:
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Doc.: IEEE /XXXr0 Submission March, 2003 Matthew Sherman, AT&T Labs Slide 1 Issues with P&P Review Requirments Date: March 18 th, 2003 Authors:
Nov. 14, 2005 C /81Chair, IEEE Opening November 2005 Plenary Session #17 Jerry Upton- Chair Gang Wu – Procedural.
The Policies and Procedures of the IEEE 802 LMSC 15-March-2004.
1 Standards Development: An Overview Discovery to Delivery Topic Committee Meeting October 30, 2007 Karen A. Wetzel NISO Standards Program Manager
The UEA House of Delegates Directing YOUR Association through the democratic process. 1.
Page 1 Agenda and General Information IEEE > >, >
Doc.: IEEE 802 EC Submission July 2014 Adrian Stephens, Intel CorporationSlide 1 Formalizing the Wireless Chair’s Meeting Date: xx Authors:
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
May 2003 Brian Mathews - AbsoluteValue Systems, Glyn Roberts – ST Microelectronics IEEE doc: IEEE /342r0 Submission 1 Slide Publicity Committee.
Doc.: IEEE 802 EC-12/0026r2 Submission July 2012 Jon Rosdahl, CSRSlide 1 Meeting Manager - Proposed Changes to OM and Chair’s Guideline Date:
Doc.: IEEE 802 EC-12/0008r1 Agenda March 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
Doc.: IEEE COEX-01/010r0 Submission November 2001 Jim Lansford, Mobilian CorporationSlide 1 IEEE 802 Wireless Coexistence Study Group November Plenary.
Introduction to IEEE IETF and IEEE 802 leadership meeting Pat Thaler IEEE 802 Vice Chair 25 July 2012.
March 2010 Plenary Session Notes on IEEE 802 Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date.
Welcome to IEEE 802 Newcomer Orientation IEEE 802 Plenary Session July 2011, San Francisco, CA ec EC.
Welcome to IEEE 802 Newcomer Orientation IEEE 802 Plenary Session Last updated, February 20, 2014.
Doc.: IEEE /0036r0 Submission Sept 2005 Tom Siep, Cambridge Silicon Radio PlcSlide 1 Matthew Sherman’s Comments to P&P Notice: This document.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 EC LMSC Policy and Procedures Update Date: November 14 th, 2005 Author:
Page 1 Agenda and General Information IEEE > >, >
Doc.: IEEE r0 Submission November 2002 Matthew B. Shoemake, TGg Chairperson IEEE TGg Chairs Status Update Matthew B. Shoemake TGg Chairperson.
Doc.: IEEE /0021r0 Submission January 2013 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report January 2013 Date: Authors:
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission November, 2007 Slide 1 EC Update on LMSC Policy and Procedures Date: November 12 th, 2007 Author:
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 EC LMSC Policy and Procedures Update Date: July 18 th, 2005 Author: Matthew.
IEEE Working Group on Broadband Wireless Access (BWA)
LMSC Policies and Procedures Subcommittee Inputs
Welcome to IEEE 802 Newcomer Orientation
John D’Ambrosia Recording Secretary, IEEE 802 LMSC
Proposed Update to Motion Templates & Other Issues
IEEE Motions at the November Plenary EC Meeting
John D’Ambrosia Recording Secretary, IEEE 802 LMSC
Sponsor Ballot Comment Resolution
Welcome to IEEE 802 Newcomer Orientation
Welcome to IEEE 802 Newcomer Orientation
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
IEEE 802 2nd Vice Chair last name at ieee dot org
LMSC Policy and Procedures Update
EC Update on LMSC Policy and Procedures
LMSC Policy and Procedures Update
Welcome to IEEE 802 Newcomer Orientation
Matthew Sherman’s Comments to P&P
IEEE 802 2nd Vice Chair last name at ieee dot org
IEEE 802 2nd Vice Chair last name at ieee dot org
Policies and Procedures Status and Plans
EC LMSC Policy and Procedures Update
IEEE MEDIA INDEPENDENT SERVICES DCN:
EC Update on LMSC Policy and Procedures
EHT SG Agenda Date: Authors: March 2019 January 2019
Presentation transcript:

The Policies and Procedures of the IEEE 802 LMSC 17-March-2008

Presenter Matthew Sherman, 1 st Vice-Chair IEEE 802

Purpose l Review Rules of IEEE 802 l Formally called Policies and Procedures (P&P) of IEEE 802 LAN/MAN Standards Committee (LMSC) l Update on recent P&P activities

Background

The Standards Process l EMS presentation from 1-July-03 provides good overview l orials/july03/EMS_Tutorial_Presentation_Fi nal.pdf

IEEE Inc. Standards Association Computer Society Board of Governors - policy -fiscal oversight Standards Board -PARs -Standards - Patents -Rules Staff -publishing -ballots -support -training Standards Activity Board -General Oversight Review Committee PARs Submittals (Drafts) IEEE 802 in the IEEE Hierarchy IEEE 802 LAN/MAN Standards Committee New Standards Committee Audit Committee P&P

Executive Committee (EC) IEEE 802 Organization EC Study Groups LMSC Technical Advisory Groups Working Groups WG Study Groups Standing Committees Task Groups or Task Forces

WORKING GROUP/TAG CHAIRS APPOINTED OFFICERS HIBERNATION LLC (Dave Carlson) Token Ring (Bob Love) DISBANDED Fiber Optic TAG Integrated Services LAN Security Demand Priority CATV WG WLAN Stuart J. Kerry WG BRIDGING/ARCH Tony Jeffree WG CSMA/CD Bob Grow WG BWA Roger Marks WG WPAN Bob Heile WG ResPackRing John Lemon WG MBWA Arnie Greenspan TAG WRAN Carl Stevenson TAG Coexistance Steve Shellhammer WG Handoff Vivek Gupta CHAIR Paul Nikolich 1 st VICE CHAIR Mat Sherman RECORDING SECY Bob OHara 2 nd VICE CHAIR Pat Thaler TREASURER John Hawkins EXECUTIVE SECY Buzz Rigsbee TAG Radio Regulatory Mike Lynch Member Emeritus Geoff Thompson (Non Voting) DISBANDED Token Bus DQDB Broadband TAG Ombudsman Karen Kenney (Non Voting) IEEE 802 Executive Committee (EC)

Why are rules important? l Facilitate orderly conduct of business l Define the standards creation process l If not followed can lead to l Delays l Litigation

Where are the rules? l The Rules of IEEE 802 LMSC are called Policies and Procedures (P&P) l The LMSC P&P can be found at l l Other key documents l WG/TAG P&P l Check WG/TAG websites l IEEE 802 LMSC (Chairs) Guidelines l

The LMSC P&P (For the average IEEE802 Participant)

Current Clauses (abridged) 13.PARLIAMENTARY PROCEDURES 14.POSITION STATEMENTS FOR STANDARDS 14.1Procedure for Coordination with Other Standards Bodies 14.2Procedure for Communication with Government Bodies 15.STANDARDS PUBLICITY 16.USE OF LMSC FUNDS 17.PROCEDURE FOR PARS 17.1IEEE-SA Standards Board Approval 17.2LMSC Approval 17.3Plenary Review 17.4Chair responsibilities 17.5Criteria for Standards Development (Five Criteria) 18.POLICY FOR DISTRIBUTION OF NEW IEEE LMSC STANDARDS PUBLICATIONS 19.PROCEDURE FOR CONDITIONAL APPROVAL TO FORWARD A DRAFT STANDARD 20.PROCEDURE FOR COEXISTENCE ASSURANCE 1.INTRODUCTION 2.LMSC SCOPE 3.LMSC ORGANIZATION 4.RESPONSIBILITIES OF THE SPONSOR 5.OFFICERS 6.MEMBERSHIP 7.SUBGROUPS CREATED BY THE SPONSOR 7.1LMSC Executive Committee 7.2LMSC WG 7.3LMSC Technical Advisory Groups (TAGs) 7.4Study Groups 7.5Balloting Group 8.LMSC SESSIONS 8.1Plenary Sessions 8.2Interim Sessions 9.VOTE 9.1Procedure for Establishing a Directed Position 9.2Proxy voting 10.COMMUNICATIONS 11.INTERPRETATIONS 12.APPEALS Organization driven by AudCom Baseline P&P!

1. Introduction l Common Abreviations l Provides order of precedence: New York State Not-for-Profit Corporation Law IEEE Certificate of Incorporation IEEE Constitution IEEE Bylaws IEEE Policies IEEE Financial Operations Manual IEEE Board of Directors Resolutions IEEE Standards Association Operations Manual IEEE-SA Board of Governors Resolutions IEEE-SA Standards Board Bylaws IEEE-SA Standards Board Operations Manual IEEE CS Constitution IEEE CS Bylaws IEEE CS Policies and Procedures, Section 10 IEEE CS Board of Governors Resolutions IEEE CS SAB Policies and Procedures LMSC Policies and Procedures Working Group / Technical Advisory Group Policies and Procedures Roberts Rules of Order Newly Revised (Latest Edition) 2 1 Indicates recommended reading Treasurer 3 4

Clauses 2-6 l 2.LMSC SCOPE l 3.LMSC ORGANIZATION l 4.RESPONSIBILITIES OF THE SPONSOR l 5.OFFICERS l 6.MEMBERSHIP l 6.5 All participants bound by IEEE Code of Ethics

7.1) The Executive Committee l Function l Charter groups, initial chairs, proc / tech advice on charter l Membership l Who is a member and how they become a member l Reaffirmation l Every even numbered year in March l EC Voting Rules l At meetings and between meetings l Meetings l Observers are allowed l Ask chair to speak l P&P Revisions l Long and drawn out l Appeal and Complaint Process l You do have recourse!

Clause Subgroup Operations l Defines WG Rules l Role of Chair / Election / Authority / etc. l Membership & Voting (7.2.3 and ) l Defines TAG Rules l Similar to WG l Defines SG Rules l ECSG l Created directly by EC l WGSG l Created by WG l Both generally create PARs l EC Decides placement of PARs l Defines Balloting Groups Most important reading for the average IEEE802 participant!

8) LMSC Sessions l Explains operations of LMSC Plenary and Interim sessions and meetings l NOTE: l A session is the entire period of time between the Opening EC plenary meeting and the Closing EC plenary meeting l A session may have substantial breaks during which no meetings occur l EC meetings while outside these bounds are generally considered part of the session l If a WG adjourns they END their session l A meeting is a single substantially contiguous period of time without any large breaks l Yes health breaks are allowed! l If you recess your meeting ends but session continues

Clauses 9-18 (Other Stuff) l 9.1. Directed Position l Requires chair to vote as WG desires at EC meeting l 17. How to establish a Project Authorization Request (PAR) l 19. Conditional Approval to forward draft

The P&P Today

SA / AudCom influence on LMSC P&P l SA has gradually tightened control on sponsor P&P l ~4 years ago established SA/AudCom Baseline P&P l SA gave AudCom increased control of Sponsor P&P l Sponsor P&P must conform with AudCom Baseline P&P l Sponsor P&P must be posted on AudCom site l Requires AudCom Approval l AudCom will only permit revisions once per year l Limit burden on AudCom of P&P reviews

LMSC Responses to SA / AudCom l 4 year ago started lengthy process to reformat the LMSC P&P to align with SA Baseline P&P l Many revision ballots l LMSC paid SA Staff to assist in process l Finally received conditional approval and posting of LMSC P&P last year (10/2/07) l Conditional (till Dec. 2008) since AudCom is requiring further reformatting of LMSC P&P to make it easier for them to review l Less is More! (We have too much material in our P&P) LMSC response to AudCom: Creating Operations Manual!

Why an Operations Manual (OM) l Sponsor P&P really acts as Bylaws l Should give big picture – charter, scope, etc… l Should not change frequently l High threshold for modification l P&P equates to SA Bylaws l Many organizations have Operations Manuals l SA and SA Standards Board both have Operations Manuals l Includes any detailed operating procedures l Usually easier to modify and update l No constraint limiting update once per year

Where are we in the Process l July 2007 – Initiated process to create OM l Nov 2007 – Review of first attempt to reformat P&P l Minus OM material l Not ready for prime time l Mar 2008 – Draft OM and P&P material available l Extensive commentary on partitioning l Material can be found at: l l Being commented by EC Members l Mar Initiate Revision ballot for new P&P/OM l July 2008 – Approve revised P&P/OM (if lucky) l Nov 2008 – Reballot of P&P / OM if necessary You Are Here

Approach Taken l Started with baseline P&P from AudCom l Filed in material from Existing LMSC P&P l Some areas of baseline P&P are not editable l Favored baseline over LMSC P&P l Tried to minimize material moved to new P&P l Moved remaining material into OM l Created recommended changes for AudCom baseline P&P l There are some clear issues with their document l Will submit for consideration at next AudCom l Plan on vote to send to ballot on Friday 3/21/08

Documentation Provided to Date l Clean copy of New P&P from ballot l Clean copy of OM for ballot l Marked up copy of New P&P l Explains where each text comes from l Provides some rationale if changes l Marked up copy of OM l Explains where each text comes from l Provides some rationale if changes l Remapping of current P&P l Explains where each line of current P&P wound up l Recommended modifications to Baseline P&P

The P&P Tomorrow

WG Baseline P&P lNoting is constant but change l SA / AudCom are working on WG Baseline P&P l Same role for WG P&P and Sponsor Baseline P&P l Will impact LMSC P&P, LMSC OM, and WG P&P l Many WG operation rules are currently in LMSC P&P l Many will wind up in the LMSC OM l Will require additional revision activies l SIGH!

Spare Slides

TASK GROUP STUDY GROUP AD_HOC GROUP AD_HOC GROUP IEEE 802 SPONSOR GROUP IEEE 802 SPONSOR GROUP WORKING GROUP Idea for standard or improved standard Passage Requires 75% or greater approval (Typically 95% Needed) RevCom NesCom PAR IEEE 802 Executive Committee Mommy, Where do Standards come from? Standards Association Standards Board PAR DRAFT STANDARD Procedural Technical Procedural Technical PAR – Project Authorization Request (Includes 5 Criteria)

Sponsor Ballot Process Working Group ballot process typically based on Sponsor ballot process

Old LMSC P&P Revision Process (Roughly Correct) IEEE 802 Plenary Session Present Proposed Revision to EC Send to Letter Ballot ? Out of Session Initiate Letter Ballot Yes No Rejected Assign to Further Study ? Comment Resolution At least 30 days In length Initiate at least 30 days prior to Next plenary Session IEEE 802 Plenary Session 2/3 Vote No Further Study Based on EC Comments Approve Revision ? Yes 1/3 Vote No Yes 2/3 Vote Out of Session Revision Effective at End of Session Must come from WG/TAG or EC member Notify CS SAB Identify any Conflicts with CS SAB P&P CS SAB Rejects ? Revision In Effect No Withdrawn Typical successful P&P revision takes 4 months to accomplish! Yes

IEEE Standards Association IEEE Standards Board (Standards) Sponsors IEEE Society or Council Technical Committee IEEE Society or Council Standards Committee Standards Coordinating Committee (SCC) IEEE Society or Council Standards Coordinating Committee Any of the prior Sub- Committee IEEE 802 LMSC sponsors standards as a Sub-Committee of a Standards Coordinating Committee within an IEEE Society (the Computer Society) IEEE Standards Organization

Executive Committee (EC) Technical Advisory Group 1 Working Group 1 IEEE 802 Organization EC Study Group 1 EC Study Group 2 EC Study Group N Technical Advisory Group 2 Technical Advisory Group N Working Group 2 Working Group N Study Group 1 Study Group N Task Group 1 Task Group N Standing Committee 1 Standing Committee N LMSC

Sponsor Organization Sponsor Standards Development GroupsSponsor Balloting Groups Balloting Group 1 Balloting Group 2 Balloting Group N Working Group 1 Working Group 2 Working Group N Working Group is a term typically used to describe Standards Development Groups. It is specifically used within the Computer Society. Other terms are also used to reference Standards Development Groups within IEEE 802

IEEE 802 in the IEEE Hierarchy IEEE Computer Society (IEEE CS) IEEE CS Standards Activities Board (SAB) Project 802 LAN MAN Standards Committee (LMSC) LMSC Executive Committee (EC) Standards Development GroupsSponsor Balloting Groups Ballot Group 1 Ballot Group 2 Ballot Group N IEEE Standards Association (IEEE SA) IEEE Board of Directors IEEE Technical Activities Board (IEEE TAB) IEEE CS Standards Coordinating Committee Includes SAB + all WG Chairs within IEEE CS You are here! All these entity have rules that 802 must follow Get slide used in 802 introduction