Overview of basic issues.   The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption.

Slides:



Advertisements
Similar presentations
Optical Fiber. Prepared By AbdulRahman AlKhayyat Mohamed Felimban.
Advertisements

Hedging Foreign Exchange Exposures. Hedging Strategies Recall that most firms (except for those involved in currency-trading) would prefer to hedge their.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
Breakout Magnetics: How Far Can We Take the Next Generation of Components Weyman Lundquist President and CEO West Coast Magnetics ISO9001:2008 ISO13485.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Optical Links CERN Versatile Link Project VL – Oxford involvement CERN VL+ for ATLAS/CMS phase II upgrade – Introduction and aims – Oxford workpackage:
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
1 Possible integrated solutions to the power distribution puzzle in LHC upgrades F.Faccio, S.Michelis CERN – PH/MIC.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
CO 2 Cooling: Overview over CMS activities Jennifer Merz RWTH Aachen University, 1. Physikalisches Institut B May CEC General Meeting, Karlsruhe.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Issues about the full scale thermosiphon (TSP ) D. Giugni Thermosiphon Review III, May 28 th 2010 D. GiugniThermosiphon Review III, May
The Versatile Link System-level Component Tests
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
Predicting the In-System Performance of the CMS Tracker Analog Readout Optical Links Stefanos Dris CERN & Imperial College, London.
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
A two-stage system for the future cooling system.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
Progress in the Development of Evaporative Cooling Systems for the ATLAS Inner Silicon Tracker G. Hallewell 1 and V. Vacek 2 1 Centre de Physique des Particules.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
CMS Upgrade CERN April 27, 2010 W. Bertl PSI Power & Cooling: Design Status of BPIX.
Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.
For the CMS Pixel detector
Detector building Notes of our discussion
A System View of Optical Fiber Communication
Safety approval of the installed copper cooling pipes
Micro-channel Cooling
For the CMS Pixel detector
Aachen Status Report: CO2 Cooling for the CMS Tracker
CO2 cooling requirements for the IBL
Recirculating CO2 System
A System View of Optical Fiber Communication prt.2
Aachen Status Report: CO2 Cooling for the CMS Tracker
Second Meeting of the Material Budget & Engineering Working Group
Fiber Optic Transmission
Status and Prospects of Tracker Services Hans Postema (CERN)
For the CMS Pixel detector
Presentation transcript:

Overview of basic issues

  The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption has been that services on YB0 will be reused  Services are interleaved with other subdetectors  Re-cabling YB0 would be a time-consuming, expensive and risky project, involving other systems o To be carried out in a radiation environment  The amount (and/or cross section) of services appears to be appropriate to the needs of the upgrade  Thanks to the use of more advanced technologies o High-speed data links o On-board power converters o Two-phase cooling  Some of the features of the installed services may however preclude some convenient design choices Introduction

  The Tracker has more than 47,000 installed fibers.  For the tracker upgrade, it is planned to use one LP-GBT link per module, serving all trigger, readout and control functionalities.  Each link requires two fibers  Hence the installed fibers can serve a Tracker with up to 23,000 modules  The n of links appears to be ~ sufficient for the layout options considered  Marginal for some options (… the most expensive ones!)  Sufficient with plenty of margin for some others  However… Readout (I)

  The current tracker fibre plant is single-mode (as required by the analog readout system) and operates at 1310nm wavelength.  The future GBT-based readout system will be digital, and could thus be based on either single-mode or multi-mode fibre  New high bandwidth multi-mode fibre types (OM3 and OM4) have been developed in the last 5 years, which support operation at 10Gbps over 100m  Most short range 10Gbps links today are based on MM fibre operating at 850nm wavelength. o Excluding the use of multi-mode fibre for the future CMS outer tracker will constrain the system design and will significantly reduce the components choice.  In particular, it is difficult (but not impossible) to find commercial low power single mode 1310nm lasers which will resist the HL-LHC radiation levels.  New cable designs are now denser, and could possibly allow to decrease the used volume in the crowded cabling channels.  The full optical link chain is expected to be ~1 MCHF cheaper with new multi- mode fibres, wrt to the option of reusing the existing optical cables  This estimate only accounts for components, not for uncabling/recabling work Readout (II)

  The upgraded tracker will require substantially more power than the present one  Between 75 kW and 120 kW in the front end (after irradiation), depending on the options considered o Mostly at ~1.2 V  To be compared with ~40 kW for the present tracker (extrapolation at the end of its lifetime) o Mostly at 2.5 V  Power conversion in the front-end offers a factor of ~10 reduction in the cross-section of the conductors  The cross section of copper is sufficient with comfortable margin  However… Power (I)

  Reusing the existing cables and connectors constrains the layout of the conductors  Some of the constraints actually come from the connectors in PP1  Some appealing solutions may be difficult or impossible to implement  E.g. controlling the DC-DC converters from the back-end, which requires separate lines  The implementation of environmental sensors will also be constrained by the layout of the available conductors  Not yet studied Power (II)

  For the upgraded tracker it is envisaged to use a two-phase CO 2 system, continuing the technological development of the pixel phase-1 upgrade  The conceptual study of such a big system is not yet started  Thanks to the excellent thermodynamic properties of two-phase CO 2, the required mass flow will be substantially lower than for the present liquid fluorocarbon cooling  Even considering the higher power inside the detector  Hence the cross section of the installed copper pipes will be sufficient for the new cooling system, with comfortable margin  However… Cooling (I)

  The operating pressures of the CO 2 system will be higher wrt the present one  The saturation pressure of CO 2 at 30°C is 70 bar o Tests done on same pipe material and brazing techniques as the existing Cu pipes have shown that the pipes have an elastic limit at ~120 bar, and rupture pressure of ~250 bar.  To qualify the installed pipes for CO 2 use they need to be all tested at 88 bar o Number currently agreed with CERN safety.  The required temperature will be most likely lower than for the present system  The insulation of the pipe bundles is likely to be a limiting factor for the allowed operating temperature of the new system o Although the exact requirement is not yet defined  Heating wires will be added on the outer surface of the cooling channels during LS1  An estimate of the lowest allowed temperature will be made  Heat exchange between in- and out-going pipes is limited by the layout of the pipe bundles  This also limits the available phase space of parameters for the operation of the system Cooling (II)

  Designing an upgraded tracker which makes use of the installed services on YB0 is a priori possible (as far as we can tell today)  This has been the assumption so far  New services would allow to make more optimized choices for the new detector design  For optical links, power distribution, and, most importantly, cooling  Such considerations may come on top of (more or less justified) generic concerns about long-term reliability of the existing services Additional considerations (I)

  It would be very unfortunate to discard convenient design options to keep compatibility with the installed services, and then decide later on to replace the services anyway, on the basis of other considerations  Cfr what happened with the pipes for the pixel CO 2 plant  It would be even much more unfortunate to design a detector that requires new services, and discover at a late stage that the recabling of YB0 is unfeasible because of risk, cost, time required, incompatibility with overall plan, etc…  Patching the tracker design at a late stage to restore compatibility with the existing services would almost certainly have a dramatic impact on the quality of the detector  We need a defined strategy very soon (i.e. this year), to be able to advance in the design Additional considerations (II)

  A technical review to assess the implications and the feasibility of YB0 re-cabling in the same LS as the Tracker installation, and in parallel with the other foreseen activities  If the outcome was that YB0 recabling is not feasible, a back-up option of some interest would be a reconnectorization in-situ at PP1  Based on the outcome of the review, define and freeze the corresponding requirements for the Tracker design, to be endorsed by CMS  Conclude the entire process before the end of the year  … 2013! Request