Harold G. Kirk Brookhaven National Laboratory Summary MUTAC Review Brookhaven National Laboratory April 19, 2007.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Neutrinos in CHIPP Allan Clark Neuchâtel Meeting June 2004.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Harold G. Kirk Brookhaven National Laboratory Targetry Program 5 Year Plan H.G. Kirk Muon Collaboration Meeting LBNL February 16, 2005.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
F Fermilab’s Muon Collider Task Force: Overview, Status and Plans Vladimir Shiltsev Fermilab AAC, August 08, 2007.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
European design study on Neutrinofacilities - Euronu within FP7.
Muon Ionization Cooling Experiment: U.S. Muon Accelerator Program Perspective and Approach Mark Palmer May 7, 2013.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
MCTF Fermilab’s Muon Collider Task Force. MCTF - Shiltsev 2MCTF The need Charge/deliverables Current activities Research Directions/Org Structure First.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
An Intense Muon Source for Future Accelerators Neutrino Sources and Muon Colliders What is a Neutrino Source Neutrino Source Study at Fermilab Scope of.
NFMCC 5-year Plan Update Michael S. Zisman NFMCC Project Manager Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review–LBNL April.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
MCTF Andreas Jansson MUTAC Meeting 8-10 April MCTF EXPERIMENTAL ACTIVITES - towards demonstrating 6D cooling.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
1 Report of PAC for Particle Physics T. Hallman Presented by P. Spillantini JINR Scientific Council Meeting June 3-4, 2004 Dubna, Russia.
Neutrino Factory and Muon Collider Collaboration DOE Briefing Meeting Alan Bross.
MCTF Steve Geer AAC Meeting May MUON COLLIDER & NEUTRINO FACTORY R&D AT FERMILAB Overview of organization, budgets, and plans.
Harold G. Kirk Brookhaven National Laboratory Report from the NFMCC MUTAC REVIEW Lawrence Berkeley National Laboratory April 8, 2008.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Muon Collider R&D Co-ordination MCTF. INTRODUCTION 2 2 Steve Geer MUTAC REVIEW April 2007 BNL Steve Holmes, March 13 th, 2007: “ … MCOG ask the NFMCC.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
 1 of 13 Stephen Brooks / RAL / March 2005 Muon Front Ends Providing High-Intensity, Low-Emittance Muon Beams for the Neutrino Factory and Muon Collider.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Introdcution to Workpackage/Activity Reflection D. Schulte.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
MCS meeting 20/11/2015 S. Guiducci. Introduction Yesterday meeting has shown an interest in a large physics community to incremental development of muon.
R&D towards a Multi-TeV Muon Collider Steve Geer 1.Introduction 2.Muon Collider Ingredients 3.Muon Collider / Neutrino Factory R&D 4.Muon Collider Specific.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Other R&D Harold G. Kirk Brookhaven National Lab.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Summary of IAP comments from 2007 EURISOL Town Meeting
Comments on the February DOE Review
Accelerator R&D for Future Neutrino Projects
Outline: Why now ? What ? How ?
Final Remarks Michael S. Zisman Center for Beam Physics
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

Harold G. Kirk Brookhaven National Laboratory Summary MUTAC Review Brookhaven National Laboratory April 19, 2007

Harold G. Kirk MUTAC06 MERIT Recommendations 1) Pay close attention to the delivery of the Hg delivery system components to keep on-track with integration tests at MIT and installation at CERN. DONE 2) Continue negotiations with CERN regarding run schedule with the goal of obtaining a commitment for a follow-up run. DONE – Initial negotiations negative – concerns with conflicts with subsequent nTOF running. New situation – Conflict with nTOF removed 3) Proceed rapidly with Hg-related safety reviews at CERN, sooner rather than later, to ensure timely readiness for the experimental run. DONE 4) Continue to investigate mixed-waste issues related to shipping the apparatus back to Oak Ridge after the CERN exposure. DONE

Harold G. Kirk MUTAC06 MUCOOL Recommendations 1) High priority should be given to testing the 201 MHz cavity with highest magnetic field available. We have performed the B field scan at as high a field as we can currently apply. Need to modify vacuum system for 201 to move it closer to 5T magnet (this is needed to run with coupling coil if we ever get it) 2) The committee is concerned about contracting the work to produce 8 additional NC 201 MHz cavities. The collaboration has benefited greatly from TJNL expertise, but TJNL has indicated that they cannot do this work in the future. The qualifications of alternative vendors must be carefully evaluated. Working with UK and JLAB will still be available as consultant for outside vendor. 3) The absorber heating tests (up to 600 W) are ideally done with a high intensity beam. Since MICE will not have such a beam, it seems reasonable to do this at MTA. However, the cost for providing a high intensity proton beam is estimated to be about $ 400 k ($ 100 k from the Muon Collaboration). Given the tight NFMCC funding situation, the collaboration should investigate whether this measurement can be done elsewhere or if it is really necessary The high-intensity beam is in progress and is now part of the Fermilab MCTF program.

Harold G. Kirk The common fund Issue The MICE common fund: Isn’t this a RAL user fee? Will the MTA charge for use of the facility. The short answers: Maybe and No. The long answer: It is not completely clear how the “common fund” will be used. We need further clarification. But if you can ask the same question about CERN or the AGS. CERN: No beam usage fees but … AGS: Beam usage fee is the norm if you are an “un-favored” user

Harold G. Kirk MICE Labor Shortage How bad is the problem? What is the impact? What is the fix? The short answer: 3 to 4 post-docs are needed. The long answer: U.S. Mice needs people in order to fully exploit the results from MICE. The NSF award to UC-Riverside is a welcomed start. 2 to 3 more Post-docs are needed. The longer answer: This issue extends well beyond just MICE. The design work of the NFMCC needs invigoration both for support of the IDS and Muon Collider studies. The pressures of the need for hardware vs. the need for people is great. We need relief.

Harold G. Kirk FY08 directions Wait a moment

Harold G. Kirk The National Program EPP2010 The United States should remain globally competitive in elementary particle physics by playing a leading role in the worldwide effort to aggressively study Terascale physics. The Muon Collider program contributes to this goal Action Item 5. The committee recommends that the properties of neutrinos be determined through a well-coordinated, staged program of experiments developed with international planning and cooperation. The International Design Study contributes to this Action Item

Harold G. Kirk European Strategy for Particle Physics In addition to the LHC, neutrino physics will have a prominent role to play in the European program. “Studies of the scientific case for future neutrino facilities and the R&D into associated technologies are required to be in a position to define the optimal neutrino programme based on the information available in around 2012; The CERN Council will play an active role in promoting a coordinated European participation in a global neutrino programme”.

Harold G. Kirk The International Design Study Goal: Unified cost-optimized solution for a Neutrino Factory by Engineered design by The International Design Study (IDS) will build on the successful conclusion of the International Scoping Study (ISS) in which an international study team developed a unified set of parameters for a future Neutrino Factory. The year 2012 is significant in that Europe’s LHC debt will be retired by that year.

Harold G. Kirk A Muon Collider Cooling Scenario

Harold G. Kirk Key R&D Issues toward a Muon Collider 1) High Power Targetry – The MERIT experiment 2) Initial Cooling – The MICE experiment (4D Cooling) 3) 200 MHz RF l Investigate Gas-Filled RF cavities n Investigate RF cavities in presence of high magnetic fields n Obtain high accelerating gradients (~15MV/m) 4) 6D Cooling l RFOFO “Guggenheim” l Helical Channel Cooling l Parametric Resonance Ionization Cooling 5) Bunch Recombination 6) Acceleration– A cost driver l FFAG’s – The EMMA experiment in the UK l Multi-turn RLA’s – a BIG cost reducer 7) Theoretical Studies l Analytic Calculations l Lattice Designs l Numeric Simulations

Harold G. Kirk The Marx AARD Panel Report “We support the MICE project as a critical feasibility demonstration for muon storage rings and colliders. A reasonable pace of progress on other necessary muon-related R&D tasks is not sustainable at the current level of funding. Without increased support, essential intellectual resources will disappear”. … “a reasonable scale would be to restore the funding to the level of four or five years ago which is about twice the current funding level of 3.6 M$ from DOE”.

Harold G. Kirk Future Plans for NFMCC l MERIT experiment: Beam in June-July 2007 l MICE experiment: First Beam Winter l EMMA project: l Participate in International Design Study: l FFAG studies l Storage ring designs l Collaborate with FNAL MCTF and Muons, Inc: l Develop 6D cooling scheme l 50T Solenoid R&D l 1-2 TeV Acceleration l Collider design

Harold G. Kirk The MUTAC Charge (I) l Has resonable R&D progress been achieved since the last MUTAC review. l Give advice on the future R&D plans l Are budgets adequate for these plans?

Harold G. Kirk The MUTAC Charge (II) l Assess and comment on our major hardware programs n MERIT n MUCOOL n MICE l Are they well focused? Do they address key technical issues?

Harold G. Kirk The MUTAC Charge (III) l Are our Simulation Group plans properly focused? l Is participation in the International Design Study for a future Neutrino Factory appropriate? l Comment on the plans of the Fermilab Muon Collider Task Force and their relationship to the ongoing program of the Neutrino Factory and Muon Collider Collaboration.

Harold G. Kirk Backup Slides