PCR Status report AESAG, September 5 2012 Supported by:

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
Coordinated Market Coupling for GB. 2 Service Provision specified to create a GB Hub with open access to : All GB connected ICs to coordinate XB Capacity.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Intraday projects - Commitment of the parties towards an integrated intraday market.
3. Update on status and implications of NWE intraday project (selection of the solution for the platform) 11 th Implementation Group Meeting 1 st March.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Implementation of PCR for Day-Ahead Price Coupling in NWE Andrew Claxton NWE Stakeholders’ Workshop 9 December 2012.
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
on Congestion Management (IG)
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Project Status Update 2 nd IG meeting NRA meeting October 26 th Joint Presentation from.
ERI SWE region Madrid XBID Overview Supported by.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Paris, 1 st March th IG meeting - SWE ERI.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013.
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
PCR Status Date: 5 December Content Achievements Revised planning outlook Reasons for delays Remaining risks.
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
European Commission views on intra-day and balancing markets
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
COMMENTS TO THE SOUTH-WEST EUROPE ELECTRICITY REGIONAL ENERGY MARKET Draft detailed action plan version 1, 22 June 2007.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Status of Implementation of PCR for Day-Ahead Price Coupling
Supported by: PCR Status report AESAG, September
SWE Day-ahead market coupling (Pre- and Post-Coupling project)
NWE Day-ahead price coupling project Cost Issue
SWE Day- Ahead market coupling
Context 12 TSOs in North West Europe (NWE) have commenced a project to facilitate a single price coupling across a region covering CWE, Scandinavia and.
Feedback on the SWE coupling Public Consultation
NWE Day-Ahead Price Coupling
SWE Day-ahead market coupling (Pre- and Post-Coupling project)
Supported by: PCR Status report AESAG, September
XBID Overview ERI SWE region Madrid Supported by.
Presentation transcript:

PCR Status report AESAG, September Supported by:

2 PCR agreements status Signed by six PCR PXs Questions received answered to AESAG participants PCR open to continue receiving and answering questions from AESAG participants regarding the agreements Discussions on going with other PXs to incorporate them to the PCR process PCR development suppliers main contracts status Systems (PMB) development contract signed. Maintenance contract in final discussion Price Coupling algorithm (Euphemia) development contract signed. Maintenance contract under discussion Communications infrastructure installation and maintenance contracts signed.

3 PCR development status – price coupling algorithm (Euphemia) Industrialization work on going Several releases already received from the provider Extensive testing of the industrialized version on going Functional tests Historical batches tests (2011) Stress batch tests (historical data modified to stress the algorithm) Some functionality to be included in future releases Tests linked to the PCR Matcher-Broker (PMB) and special case handling (decoupling, curtailment, etc. ) ready to start If new requirements appear they will be treated under change control Impact to be evaluated

4 PCR development status – Support Information System - PMB (PCR Matcher and Broker) Several releases of the PMB system received from the provider and under testing Project Manager and Test coordinator structure operating Test team for PMB, formed by Test Leaders and supporters from each PCR PX together with Test Coordinator operating Test plans and scenarios finished Several training workshop for testers already took place Local testing systems installed in each PX locations. Parallel testing running on the different local installations Integration tests between PCR PXs scheduled for mid-October Extended tests (Post system acceptance) scheduled for January Clarification of a few TSO related requirements still not completely finalized yet Impact to be evaluated under change control when known Some functionality to be added in future releases after first regional implementations(s) based on the PCR Price Coupling solution

5 PCR development status. Operational Manual Main Principles established in the PCR cooperation agreement, in line with the draft Governance Guideline Details to be developed starting from, and adapting, primarily the CWE Operational Manual PCR Normal procedures soon ready for internal approval PCR Backup procedures in development stage PCR Exceptional procedures prepared PCR Fall-back procedures under development PCR Checklist (actions form all procedures) under development Coordination with Regional projects procedures (timing, etc…)

6 Regional implementations of PCR (I) PCR doesn´t cover any pre- or post- coupling steps (e.g. shipping or clearing) and what specific solutions for exceptional situations are utilized on each border, or groups of borders. It is up to bilateral (or multilateral) decisions of relevant Parties; In line with ACER road map NWE See detailed complementary presentation by NWE PXs and TSOs

7 Regional implementation of PCR (II) MIBEL-France (Pre coupling, post coupling and exceptional situations) Under the SWE Regional Implementation Group coordination Limited to pre coupling, post coupling and exceptional situations processes Cooperation agreement finished and under signature process Working groups formed to follow the development of the different components necessary Existing procedures respected as much as possible Coordination with other Regions very important for the PX and the TSO involved also in NWE The PXs are developing the interface between the trading system and PMB (compress bid preparation, portfolio allocation, validations, etc…)

8 Regional implementation of PCR (III) CSE CSE PXs evaluating their participation on PCR PCR fully consistent with the coupling already in place between Italy and Slovenia. Italy will take part in name of both to the testing phase starting in October, as for the system operation. First discussions concerning the structuring of a pre-post coupling process involving TSOs and PXs also on the French border Start up of a working group for implementation of the market coupling for day ahead and intraday markets between the relevant PX and TSOs on the Italian borders

9 Regional implementation of PCR (IV) CEE-NWE Austria, Czech, Germany, Hungary, Poland, Slovakia and Slovenia involved in the project of MC FBA CEE-NWE MoU including Implementation roadmap is being prepared Support of NRAs and TSOs: MC to be based on PCR. CEE PXs to choose between becoming full PCR members or being serviced by one of the full PCR members. Coordination with NWE and PCR members is inevitable for the PXs and the TSOs involved in CEE for further implementation Additional requirements of CEE TSOs to PCR algorithm need to be clarified and discussed, which can prolong implementation First discussions concerning the structuring of a pre-post coupling process involving TSOs and PXs Next steps – signature of MoU and start work on the design and Framework Project Agreement.