Scaling up the coordination and resources for implementation of the SNA Building a Strategic Plan for Uruguay Lourdes Erro Meeting on.

Slides:



Advertisements
Similar presentations
Developing a programme for the implementation of the 2008 SNA and supporting statistics Meeting on Scaling up the coordination and resources for the implementation.
Advertisements

Developing a programme for the implementation of the 2008 SNA and supporting statistics Side event at the 2013 UNSC Organised by UNSD 23 February 2013.
The global implementation programme for the 2008 SNA and supporting statistics 7th meeting of the Advisory Expert Group on National Accounts April.
Implementation of 2008 SNA AEG Meeting on National Accounts May 28-31, 2013 Luxembourg.
Scaling up the global initiative on the implementation of the SNA and supporting statistics Meeting on Scaling up the coordination and resources for the.
Developing a programme for the implementation of the
19-20 September 2013, IBGE, Rio de Janeiro, Brazil
Global Implementation Strategy for SEEA
Statement of Strategy Template for the Implementation Programme of the 2008 SNA and supporting statistics in Brazil National Seminar on Developing a Programme.
Statement of Strategy Template for the Implementation Programme of the 2008 SNA and supporting statistics Regional Seminar on Developing a Programme for.
National Seminar on Developing a Program for the Implementation of the 2008 SNA and Supporting Statistics in Turkey Cevdet ÖĞÜT National Accounts Department.
Regional Seminar on Developing a Programme for the Implementation of the 2008 SNA and Supporting Statistics January 30-February 1, 2013 Kingston, Jamaica.
GRENADA DEVELOPING A PROGRAMME FOR THE IMPLEMENTATION OF SNA 2008
Presented by: Denise Sjahkit SURINAME. Introduction Overview of the main policy issues Scope Current compilation practices Data-sources Requirements for.
G20 Training Strategy Bridging Education, Training, and Decent Work
Building Statistical Capacity To Monitor Development Progress World Bank Development Data Group.
EN/AGNA/2014/Pres/05 Swaziland Presentation on Demand for Technical Assistance and Capacity Building AGNA Meeting on the Implementation of the 2008 System.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE TurkStat NATIONAL ACCOUNTS IN TURKEY 1 TurkStat.
1 Adoption of System of National Accounts 1993 in Latin-America and the Caribbean DEPE - CEPAL Joint Eurostat-UNSD Conference on National Accounts in the.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
Special Session for the countries in Eastern Europe, Caucasus, Central Asia and South East Europe Geneva, 6 May 2014 UNSD Developing a Programme on Integrated.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
United Nations Statistics Division
Chapter 7. Balancing supply and use Comments and suggestions. By Liv Hobbelstad Simpson. 1. Why SNA 1993 and not 2008 SNA The Global Office has decided.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Colombia´s Country practice for the implementation of 2008 SNA Ana Victoria Vega A. Technical Director, National Accounts and Synthetic Statistics Division.
Assessing the Capacity of Statistical Systems Development Data Group.
Implementation of the 2008 SNA Implementation of the 2008 SNA UNECE recommendations and implementation strategy for EECCA and SEE countries Workshop on.
Global SNA Implementation Strategy GULAB SINGH United Nations Statistics Division Training Workshop on 2008 SNA for ECO Member States October 2012,
Compilation of Distributive Trade Statistics in African Countries Workshop for African countries on the implementation of International Recommendations.
THE POLICY PERSPECTIVE ON DEVELOPING AN INTEGRATED STATISTICS PROGRAMME IN SUPPORT OF 2008 SNA IMPLEMENTATION 1 Presented by Hazel Corbin Statistics Adviser,
1 IMPLEMENTATION STRATEGY for the 2008 SNA OECD National Accounts Working Party Paris, France 4 to 6 November 2009 Herman Smith UNSD.
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
Developing a programme for the implementation of the 2008 SNA and supporting statistics OECD Working Party on National Accounts October 2011, Paris,
The implementation programme for the 2008 SNA and supporting statistics UNECE special session on National Accounts for economies in transition Geneva,
1 Workshop on National Accounts 6-9 July 2009, New Delhi, India Gulab Singh UN Statistics Division South Asian Countries Compliance with the UN-NAQ Questionnaire.
Developing a programme for the implementation of the 2008 SNA and supporting statistics Seminar on Developing a programme for the implementation of the.
1 Overview of Economic Statistics in Africa UNECA Andry Andriantseheno Regional Workshop on Basic Economic Statistics Addis-Ababa October 2007.
A Strategy for Implementation of the Updated System of National Accounts 1993 Prepared for discussion by UNSD and IMF Joint Eurostat-UNSD Conference on.
The implementation programme for the 2008 SNA and supporting statistics UNSD-Regional Commissions Coordination Meeting on Integrated Economic Statistics.
Assisting African countries to improve compilation of basic economic statistics: an outline of the UNSD strategy Vladimir Markhonko United Nations Statistics.
The implementation programme for the 2008 SNA and supporting statistics Seminar on the implementation of the System of National Accounts 2008 for Caribbean.
United Nations Statistics Division Developing a short-term statistics implementation programme Expert Group Meeting on Short-Term Economic Statistics in.
International Monetary Fund. INTERNATIONAL MONETARY FUND What IMF do The IMF promotes international monetary cooperation and exchange rate stability,
Ilaria DiMatteo United Nations Statistics Division Meeting of the African Group on National Accounts(AGNA) April 2016 Addis Ababa, Ethiopia Overview.
Herman Smith UNSD 10 th Meeting of the Advisory Expert Group on National Accounts April 2016, Paris Overview of the Implementation of National Accounts.
REPUBLIC OF SEYCHELLES
RPES Project Support Meeting
Developing reporting system for SDG and Agenda 2063, contribution of National Statistical System, issues faced and challenges CSA Ethiopia.
Herman Smith United Nations Statistics Division
Developing a programme for the implementation of the
A CONCERTED APPROACH TO IMPROVING THE MEASUREMENT OF INTERNATIONAL TRADE IN SERVICES STATISTICS IN SAINT LUCIA RICHARD K. HARRIS.
The main orientations, plans and problems when implementing the
Eleventh Meeting of the Advisory Expert Group on National Accounts
Statement of strategy template
Understanding what is the Phytosanitary Capacity Evaluation (PCE)
National Accounts Section United Nations Statistics Division
Assessment of National Accounts Compilation in the GCC Countries Giovanni Savio, Statistics Division, UN-ESCWA High level seminar on the implementation.
Conclusions 1 The participants reacted positively to the request by the international agencies in collaboration with the UNECA to prepare country responses.
Ethiopia, April 2016 Workshop on the implementation of the 2008 SNA Phase II The case of Mozambique Ethiopia, April 2016
Agenda item 5b Main challenges and priorities for future work Implementation of the 2008 SNA in the EECCA, SEE and Mongolia Presentation by UNECE Workshop.
Seminar on Developing a programme for the implementation of the
High level seminar on the implementation of the
Regional 2008 SNA Implementation
IMPLEMENTATION PROGRAMME OF SNA 2008 (Dominica)
Developing a global programme for the implementation of the
Twelfth Meeting of the Advisory Expert Group on National Accounts
Kingston, Jamaica January 2013 Hernán Epstein - ECLAC -
Global SNA Implementation Strategy
International Standards for Compilation of Statistics: The Gap between Standards Adoption and Standards Implementation Katherine K. Wallman Chief Statistician.
Presentation transcript:

Scaling up the coordination and resources for implementation of the SNA Building a Strategic Plan for Uruguay Lourdes Erro Meeting on Scaling up the coordination and resources for the implementation of the SNA. Luxemburg May 2013

Building a Strategic Plan for Uruguay 1. A strategic plan in the framework of the Regional Plan 2. Strategic Plan for Uruguay 3. What support is required?

The Strategic Plan for LAC countries was approved in , but it has been facing many difficulties Situation in LAC countries: – is very unequal – has special institutional challenges (in 16 countries NA compilers are Central Banks) The Plan is now emphasizing a different strategy: incremental work Building a Strategic Plan for Uruguay 1 A Strategic Plan in the framework of the Regional Plan 2 Strategic Plan for Uruguay 3. What support is required? Use pilot countries to expand the experience to other countries in a second stage

Work in the pilot countries: design and implement a National Action Plan with the support of ECLAC: establish objectives and resources determine inter-institutional agreements, responsibilities and deadlines work hand in hand by ECLAC staff and national staff to monitor the Plan Spread the experience to others: adapt and learn from the pilot countries experience (with horizontal cooperation and technical assistance) Building a Strategic Plan for Uruguay 1 A Strategic Plan in the framework of the Regional Plan 2 Strategic Plan for Uruguay 3. What support is required?

Implementation of 1993 SNA released in March 2009: 2005 base year current and constant annual SUT (intermediate consumption matrix, national and foreign origin detailed) without Institutional Sectors Accounts Lack of resources (recent years): in supporting economic statistics, mostly supplied by NSI In NA team: by adding the responsibility of compiling BOP with no additional resources 2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

An opportunity (2012): – Strategic Plan for the Central Bank: a strategic initiative: to improve the scope of NA and to adopt international recommendations – Strategic Regional Plan: apply to become a pilot country Ask for the ROSC (IMF) and for ECLAC support 2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

Diagnostic (2012) based on recommended tools (ECLAC mission and ROSC (IMF): 1.Statistical Requisites auto diagnostic 2.Milestones for the implementation 3.Minimum Requirement Data Set (MRDS) (Minimum, Recommended, Desirable) 4.Conceptual Compliance Questionnaire 5.Data Quality Assessment Framework (DQAF-IMF) 2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

Conclusions of the Diagnostic: limited SNA scope (Uruguayan NA dont fulfil Minimum Required Data) accuracy and reliability problems (mostly due to lack of statistical sources) 2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

What are the main national policy challenges? quick knowledge about the impact of the international situation, deal with inflation, exchange rate policy, fiscal policy retain foreign capital when the situation in developed countries improves open new foreign markets for goods and services achieve improvements in infrastructure investment (increase productivity and competitiveness) improve investment without neglecting the environment achieve improvements in human capital; continue to reduce poverty and to improve distribution of income public sector reform and sustainability of social security system 2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

What are the implications for the scope and detail of the accounts and supporting statistics? Better short-term statistics (mostly on the expenditure side) Financial accounts statistics by sectors Government accounts Distribution of income accounts External sector statistics (FDI, Exports of Services, etc) Capital formation, Employment, Productivity Environmental statistics 2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

In summary, high priority to: Institutional Sector Accounts (N/A since 1990) some improvement on short term statistics 2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

Plan based on 4 pillars: 1.Strengthen the institutional framework for basic statistics (dimension worst evaluated by ROSC) 2.Compile a new benchmark base year (jointly for NA and BOP) using SUT 3.Expand the present NA scope (including Institutional Sector Accounts, and at least to satisfy all Minimun Required and most of Recommended Data) 4.Adopt new recommendations in a priority framework 2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

Stages of the Plan StagesActivitiesSpan/DeadlineDescription Stage 0 Statistics Sources and Training statistical or software projects Stage 1 Reference year compilation (SUT, IEA) Data consistency and arbitrage process. SUT and IEA for the reference year. Harmonization BOP-NA Stage 2 Annual and quarterly NA series ( ) compilation SUT and IEA for Chained volume measures Stage 3Release2019New web platform for users 2 Strategic Plan for Uruguay 2.1 Background 2.2 Diagnostic 2.3 Implementation Plan

There are first order problems and secondary problems 3. What support is required? 3.1 Advocacy and institutional agreements 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance First order problems (Fundamental problems; long term resolution) Advocacy Institutional agreements Supporting statistics Commitment of users Secondary problems (Tools to support the implementation) Training Horizontal Cooperation Technical assistance Manuals and Handbooks in the appropriate language

It is necessary: Memorandum of Understanding (MOU): ECLAC-CBU-NSI Targets: Cooperation agreement; Support for NSI Agreed: Inter-institutional Working Groups to improve basic statistics (Classifications, Business Register, Economic Survey and Construction Statistics, already working) Following Commission Twice a year report to authorities with the support of ECLAC 3. What support is required? 3.1 Advocacy and institutional agreements 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance to raise political support to the project to establish institutional commitments beyond individual responsibilities

MOU provides political support: –raises awareness among the authorities –assists on the accountability by monitoring the National Plan MOU expedites and supports institutional agreements: Facilitates: diagnostic and establishment of priorities in a cooperatively way Promotes joint work: Inter-institutional Working Groups Provides tools for monitoring 3. What support is required? 3.1 Advocacy and institutional agreements 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance

In Uruguay it is not possible to improve the scope of SNA (let alone the implementation of 2008 SNA): without looking for new basic statistics without involving National Statistical Institute (NSI) 3. What support is required? 3.1 Advocacy and institutional agreement 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance International support is necessary to better involve the National Statistical System in an integrated statistical approach

On the supply side: Enterprises register Economic Activity Structural Surveys Agricultural costs Construction activity Informal sector Cross elements: Trade margins are outdated (most from 1997) On the expenditure side: Household Expenditure Survey is outdated (2006) Gross Capital Formation Exports and Imports of Services Institutional Sectors: Companies accounting data from Tax Declaration Registry are not available It doesnt exist a Central Balance Sheet Data Office Major gaps in information: 3. What support is required? 3.1 Advocacy and institutional agreement 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance

Users often dont ask for NA, as they are not aware of its usefulness In medium term something can be done to encourage this: Examples: Organize Seminars: to explain NA uses, to allow discussions between researchers on suggested subjects Organize Users Surveys and feedback 3. What support is required? 3.1 Advocacy and institutional agreement 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance Although results only will be visible in the long run, it is very important to involve users along this process

Training: introductory courses for the new team advanced courses and international workshops to discuss specific topics Horizontal Cooperation: to learn about procedures and practical issues, mainly to compile Institutional Sector Accounts Technical Assistance: mainly for basic statistics Manuals and compilation guides in appropriate language 3. What support is required? 3.1 Advocacy and institutional agreement 3.2 Supporting statistics 3.3 The users 3.4 Training, Horizontal Cooperation, Technical Assistance

Scaling up the coordination and resources for implementation of the SNA Building a Strategic Plan for Uruguay Lourdes Erro Meeting on Scaling up the coordination and resources for the implementation of the SNA. Luxemburg May 2013