1 NRC Status and Plans for License Renewal – A Role for Consensus Standards Allen Hiser, Jr. Robert Gramm Stacie Sakai Division of License Renewal Office.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Elements of an Effective Safety and Health Program
NRC Consensus Standards Program
Perspective on the ASTM Roadmap for Supporting Civil Nuclear Energy Plants Workshop on Emerging Trends in Nuclear Energy – The Standards Component June.
ASTM International Officers Training Workshop September 2012 Pat Picariello, Director, Developmental Operations 1 Strategic Planning & New Activity Development.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Strategic Planning & New Activity Development September 2013.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
The Managing Authority –Keystone of the Control System
WHO Good Distribution Practices for Pharmaceutical Products
Module N° 7 – Introduction to SMS
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Addition Facts
Making the System Operational
ZMQS ZMQS
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
Site Safety Plans PFN ME 35B.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
1 SESSION 5- RECORDING AND REPORTING IN GRADES R-12 Computer Applications Technology Information Technology.
IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
A Roadmap to Successful Implementation Management Plans.
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Checking & Corrective Action
1 Implementation Status of the U.S.-IAEA Additional Protocol Thomas Grice NMMSS Users Meeting May 20, 2009 Denver, CO.
Environmental Management Systems Refresher
1 CM HOW-TO DETAILED DISCUSSION. 2 OBJECTIVE n Upon completion of this training you will demonstrate an understanding of how to perform a CM evaluation.
Addition 1’s to 20.
25 seconds left…...
Week 1.
Internal Control and Control Risk
1 Phase III: Planning Action Developing Improvement Plans.
1 Technical Meeting on Managing the Development of a National Infrastructure for Nuclear Power SECURITY STATUS IN CHILE Mauricio Lichtemberg Chilean Nuclear.
Plant Vogtle 1&2 10 CFR Pilot Program NESCC Meeting
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
Advisory Committee on Reactor Safeguards Full Committee Davis-Besse Nuclear Power Station Final & Supplemental Safety Evaluation Report November 4, 2015.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
G. Sliter, EPRI N. Wilmshurst, EPRI J. Carey, EPRI F. Polaski, Exelon Corp. Nuclear Safety Symposium Seoul, Korea 1 April 2005 Status of License Renewal.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Status and Prospect of Korean Korea Electric Power Research Institute
Research and Test Reactor Safety: The Regulatory Perspective
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Presentation transcript:

1 NRC Status and Plans for License Renewal – A Role for Consensus Standards Allen Hiser, Jr. Robert Gramm Stacie Sakai Division of License Renewal Office of Nuclear Reactor Regulation ASTM Workshop on Emerging Trends in Nuclear Energy – The Standards Component June 15, 2011

2 OUTLINE Description of License Renewal Subsequent Renewal Technical Issue Areas Conclusions

Nuclear Power Plant Licensing Atomic Energy Act Plants licensed to operate for 40 years Allows for license renewal Regulatory Process (10 CFR Part 50) Regional inspections Safety issue resolutions Plant specific issue resolutions Materials aging & degradation issues important to safety are addressed in a variety of ways Rule changes Generic communications Orders Voluntary actions 3

License Renewal Rule – 10 CFR Part 54 Renewal for up to 20 years (e.g., 40 to 60 years) Can apply 20 years before license expiration per 54.17(c) Must apply at least 5 years before expiration per 2.109(b) A renewed license may be subsequently renewed per 54.31(d) No restrictions on number of subsequent renewals or changes in requirements Focus is on managing the effects of aging of long-lived, passive structures and components important to plant safety – aging management programs (AMPs) Other aspects of original license are not reconsidered A program based solely on detecting structure and component failures is not considered an effective aging management program 4

The ongoing regulatory process is adequate to ensure the safety of currently operating plants The same plant operating rules apply during the renewal term Requires additional actions for aging management of passive, long-lived plant structures and components for license renewal License Renewal Safety Principles 5

License Renewal Process Submittal of Application - Integrated Plant Assessment Aging management review Aging management programs Time-limited aging analyses Safety Review Regional Inspection Advisory Committee on Reactor Safeguards Environmental Review (10 CFR 51) Hearing Opportunity Agency Decision Regional Inspection before end of 40 years 6

License Renewal Status 104 operating reactors in the U.S. 69 PWRs 35 BWRs Renewed licenses issued for 66 units at 39 sites Reviewing applications for 16 units at 11 sites 9 plants have entered their 41 st year of operation; first was in April cumulative reactor-years beyond 40 7

Industry Considering Subsequent Renewals Anticipate first submittal(s) in 2015 to 2019 ?? Industry has lead role to submit applications and identify resolution of technical issues NRC looking at need for changes to regulatory processes, and evaluating both guidance and regulations –Including technical issues (safety and environmental) 8

9 NRC Tasks on Subsequent Renewal Hold NRC/industry workshops on operating experience and industry research activities Develop an expanded materials degradation assessment To identify material, environment and aging effects combinations Assess results from implementation of Aging Management Programs Share expertise - domestic and international Only the first phase to develop a comprehensive basis for license renewal beyond 60 years

Subsequent License Renewal Focus Areas Technical issues Guidance documents for operation to 80 years License renewal application (LRA) characteristics 107

Technical Issue Concerns Activities looking at identification of potential new aging phenomena – locations, forms, severity Known mechanisms that could become more active – incubation times, activation energies, late blooming phases New phenomena Approaches for identifying potential aging phenomena Workshops with industry and international colleagues Expanded materials degradation assessment (EMDA) Results from 1 st renewal aging management programs Both one-time and periodic programs Relevant domestic and international operating experience It is difficult to simulate 80 years of aging when oldest plants are just over 40 years old 8

Technical Issue Areas Adequacy of aging management programs (AMPs) – need new or enhanced AMPs ? Considering phenomena of concern Assess performance of 1 st renewal aging management programs Inspection methods, accessibility, frequency How to address primary limiting items Reactor pressure vessel integrity Degradation and integrity of structures Cable aging 9

Guidance / Application Process Guidance Develop Generic Aging Lessons Learned report applicable for operation up to 80 years Develop Standard Review Plan applicable to LRAs for operation up to 80 years Revision to industry guidance? LRA Format changes needed ? Self assessment of AMP effectiveness ? Public involvement and input Workshops – starting this fall 13

14 AMP Effectiveness Audits Review both one-time and periodic AMPs Assess findings – unanticipated or expected degradation found, or confirm no degradation Accessibility issues, adequacy of methods Trending information (mainly existing programs) First plants – Ginna and Nine Mile Point Bottom line – Evaluate effectiveness of AMPs and enable an assessment of the need for new or enhanced AMPs to address subsequent renewal

Workshops on Subsequent Renewal February 19-21, Joint NRC/DOE Workshop on U.S. Nuclear Power Plant Life Extension Research and Development Long-Term Reliability Observations Aging Management Observations New Technologies Observations February 22-24, 2011 – 2 nd Joint Workshop Industry presentation focus was on plans and roadmaps New technical information was sparse 12

Reactor Vessel Embrittlement Improvements to embrittlement correlations, particularly incorporation of high fluence data (>5x10 19 n/cm 2 ) More accurate flaw distribution models for RPV materials to support risk informed P-T limit calculations –NDE improvements (EPRI/ASME) Surveillance Programs –Improve guidance for coordinated/integrated programs and sister plant data (ASTM) –Accelerate generation of high fluence data Evaluation of nozzles as limiting components for P-T limits (ASME)

Reactor Vessel Internals In-situ test methods for estimating fracture toughness and void swelling of stainless steels IASCC resistant materials – e.g., for replacement bolting

Electrical Cable Submergence Issues –Audits identify underground cables subject to wet environment –Validity of Environmental Qualification (EQ) for subsequent renewal operating period Status –Inspection program to verify that licensees are maintaining cables dry –NRC improving electrical testing guidance –EQ needs to be addresses 18

19 Electrical Cable Submergence

Concrete Issues Issue –Cracks and spalling create integrity concerns –Alkali-silica reaction Status –Enhanced commitments for examinations and criteria for repair 20

Concrete Degradation 21 Core Drill Cracks with Gel Like Material

Conclusions Licenses have been renewed for 2/3 of plants Subsequent renewal challenges –NRC assessing need for changes to regulatory processes –Resolution of technical issues by industry is critical to enable acceptable applications for subsequent renewal Industry must take an active lead to develop resolutions to technical issues –Adequate understanding of degradation mechanisms –Sufficiency of aging management approaches NRC will evaluate acceptability of proposed resolutions Codes and standards can provide key support –Criteria for acceptability of aged components –Standardization of test methods and analysis procedures to address a variety of technical issues 22