RAL/BENE meeting, April 28 2006 Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

Particle rate in M1 and M2 Muon Meeting
Test Beam at IHEP,CAS ZHANG Liang sheng, Test Beam Group Introduction BEPC/BES Ⅱ will be upgraded as BEPC Ⅱ / BES Ⅲ, it is necessary to do beam test for.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
Solid Targets for the Neutrino Factory J R J Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK
Lock Acquisition with Auxiliary Lasers Main Question to be answered for the design : What is the goal of auxiliary lasers ? 1. lock independently the arms.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Studies of solid high-power targets Goran Skoro University of Sheffield HPT Meeting May 01 – 02, 2008 Oxford, UK.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
Primary Target Systems for a Muon Collider / Neutrino Factory. What has the experimental effort taught us thus far. N. Simos, H. Kirk, S. Kahn, P. Thieberger,
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
Simulations of Pressure Waves induced by Proton Pulses In search of the answer to the fundamental question: are materials indeed stronger than what we.
17 Dec. 2008M. Dracos, EUROnu-WP21 Collector and the SPL Super-Beam Project Marcos Dracos IPHC-IN2P3/CNRS Strasbourg.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
EUROnu Target and Horn Studies Nikolaos Vassilopoulos/IPHC-CNRS on behalf of WP2 1ECFA Review PanelDarensbury, 02/05/2011.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Thermomechanical characterization of candidate materials for solid high power targets Goran Skoro, R. Bennett, R. Edgecock 6 November 2012 UKNF Target.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
BENE-CARE meeting, November 14, 2006 Collector work in Strasbourg 2 contributions : preparation of horn tests and definition of supplies and infrastructure.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
26/3/03J.E Campagne LAL Horn R&D J.E Campagne, A. Caze (Ph. D), CNGS Horn: G. Macé, S. Wallon New persons: J. Bonis, M. Omesh,… Other IN2P3 members: J.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos.
Preliminary Results on Hydrophones Energy Calibration with a Proton Beam Results at an intense low-energy proton beam in ITEP (Moscow), special thanks.
NUFACT August 2014 E. Wildner, CERN 13/03/14Nufact14, Glasgow, E. Wildner 2 Accumulator Ring for the ESS Neutrino Super Beam.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
Harold G. Kirk Brookhaven National Laboratory Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006.
BNL E951 BEAM WINDOW EXPERIENCE Nicholas Simos, PhD, PE Neutrino Working Group Brookhaven National Laboratory.
CERN/BENE meeting, July Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg Who.
RAL/ISS meeting, April Marcos Dracos Collection system, horn (work mainly done by Francis Osswald) goals and perspectives suppliers and collaborations.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Progress at BNL Vitaly Yakimenko. Polarized Positrons Source (PPS for ILC) Conventional Non- Polarized Positrons: In our proposal polarized  -ray beam.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
Alessandro BertarelliTS department Seminar, 3 rd May 2006 EDMS Alessandro Dallocchio 1,2 Alessandro Bertarelli 1 1 TS department – Mechanical and Material.
1 BROOKHAVEN SCIENCE ASSOCIATES N. Simos, BNL EUROnu-IDS Target Meeting December 15-18, 2008 Superbeam Horn-Target Integration.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
From the SPL to the 4-target-horn system: Preliminary design of a beam switching yard WP2: Super Beam 4 th EUROν Annual Meeting, Paris, June 13, 2012 E.
WP2 13/07/2011M. Dracos1 Marcos Dracos IPHC-IN2P3/CNRS, Strasbourg.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
Challenges and Progress on the SB Horn Design
Horn and Solenoid Options in Neutrino Factory
Target and Horn status report
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Outline: Why now ? What ? How ?
STUDIES TOWARDS TARGET-HORN INTEGRATION Institute of Applied Mechanics
Beam Dump outline work plan (UK perspective)
Collector and the SPL Super-Beam Project
Summary for the Sources working group
Superbeam Horn-Target Integration
EURO Conclusions from Cracow meeting
Explanation of the Basic Principles and Goals
Presentation transcript:

RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg

RAL/BENE meeting, April Marcos Dracos After discussion with CERN and Strasbourg Start the collection study for SuperBeam option Taking into account previous tests done at CERN, prepare a setup to pulse the horn at 50 Hz (nominal value) and a current as high as possible Proton beam –2.2 GeV –4 MW –50 Hz rep. rate Horn focusing –First horn 300 kA –Reflector 600 kA Low energy pion beam:  500 MeV –proton energy below kaon threshold –Short decay channel < 100 m Low energy neutrino beam:  250 MeV CERN horn design tests already done at CERN: pulse repetition frequency: 1 Hz Imax: 30, 100 kA C: 1 mF pulse duration: 100  s

RAL/BENE meeting, April Marcos Dracos CERN LoI Target R&D Horn and solid target integration 1.Improve existing infrastructure (at BA7) to allow realistic tests of a NuFact prototype horn at nominal conditions. Analysis of fatigue tests and possible corrective actions. 2.Investigation of the material structure of the existing Nufact horn (480 k€, available) with a 50 Hz power supply (300 kA, 5 kV, <100  s). The investigation will be based on laser vibrometer (100 k€, available) measurements of the horn’s resonance frequencies and of their damping constants with increasing number of cycles. A mechanical analysis (mechanical engineers from Poland/Krakow via T. Kurtyka) should be derived to assess the fatigue of the system (horn and strip line) and its life time (expected to be few month of operations at nominal parameters). 3.Development of a test bench using the NuFact horn and the 50Hz power supply to validate multi-physics simulations in order to reduce the experimental working load and costs (collaboration with Strasbourg). 4.Address the integration issues of the horn. Complete the design of the existing horn including possibly the studies for a target station located in the inside. Investigate the cooling issues involved. (collaboration with BNL). total cost for the collector: 1.35 M€

RAL/BENE meeting, April Marcos Dracos Strasbourg LoI The cavity is submitted to: an electromagnetic wave, thermo-mechanic stresses, vibrations, fatigue, radiation damages. The proposed project intends to quantify all the above parameters in order to propose a robust collector design. Main challenges: design of a high current pulsed power supply (300 kA/100 μs/50 Hz), cooling system in order to maintain the integrity of the horn despite of the heat amount generated by the energy deposition of the secondary particles provided by the impact of the primary proton beam onto the target, definition of the radiation tolerance, integration of the target. Goal establish an experimental setup in Strasbourg, proceed to the qualification and ageing tests develop numerical simulation tools in parallel Estimated cost for 3 years R&D: 2 M€ (less if some parts of the power supply could be provided by CERN)

RAL/BENE meeting, April Marcos Dracos Manpower CERN: "available" {0.5 physicist, 0.3 Mech. Engineer, 0.5 senior technician mechanics, 1 technician mechanics}, requested {1 El. Engineer, one PhD } IReS: available {0.5 physicist, 5 Engineers and technicians, 1 student}, requested {1 physicist, 2 Engineers, 1 student} BNL: available {1 engineer }

RAL/BENE meeting, April Marcos Dracos the power supply

RAL/BENE meeting, April Marcos Dracos the power supply control/monitoringcommand/triggering interfaces chargercapacitor bench switchingprotections recovery Z adaptation TPC Due to the high price go to a modular system and increase small by small the current

RAL/BENE meeting, April Marcos Dracos Possible financial sources EU (FP7) ANR ( Agence Nationale de la Recherche), 2007 CERN Alsace Region IN2P3

RAL/BENE meeting, April Marcos Dracos preliminary schedule Design of Power Supply: 2006 R&D, tests and simulations: new prototype: 2008