1 Packaging bio- methane connections for the future Dan Anderson CEng 11 th January 2012.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
A Company Overview. Who are KG Enterprises Specialising in Logistics Review – Process Re-engineering – Sub-contract selection & management – Working within.
What is the Enerjetic Business? The business offers consulting and reporting tools to report on energy and related data for business purposes. Common uses.
1 Use of commingling to avoid propane addition at biomethane injection points  Objective of the measurement regime for CV  Protect downstream customers.
Electricity Price Breakdown Fix at premium or Pass Through.
It is essential that CSU lead by example and continue to address sustainability “ ”
Striving to exceed customer demands by delivering the best.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
Black Business Council 7 June South African partner : 40 % 2. Local content, job creation & BEE: 30 % 3. Contribution towards local community.
Electricity Distribution System Industrial Commercial Agricultural Domestic System transformer Distribution transformer.
1 Microturbine CHP Application in the Hotel Business DOE Microturbine Application Workshop Embassy Suites Brea January 20, 2004.
Energy efficiency measures in the public building sector: the DEEP project Freiburg, 14 June 2007 Philipp Tepper Sustainable Procurement ICLEI - Local.
About Us We are a natural gas EPC company specializing in a wide variety of aspects of natural gas installations Providing full service package.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Peak Scientific Instruments Ltd
1 Georgian National Energy And Water Supply Regulation Comission Power Losses Nugzar Beridze June 27-July 3, 2008.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Biomethane Review of UK activity
SISTEM GAS PERUBATAN BERPAIP di dalam HOSPITAL
Teezle TMatics M2M Platform & Solutions Overview January 28 th, 2014.
Scaling Up Energy Efficiency in India: Opportunities in the Electricity Sector Dr. Jayant Sathaye, Dr. Amol Phadke and Ranjit Bharvirkar Energy Analysis.
Article 5 of the Energy Services Directive Edward Green.
1 Steam to Hot Water Conversion The University of British Columbia Paul Holt Director, Generation & Distribution.
Reduction in losses incurred in power distribution.
Apao.ca Annual General Meeting 2012 Year In Review Hilton London, London Ontario Jennifer Green, Executive Coordinator, APAO.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
Heat and Energy Saving 02 March 2009 John Russell
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
Ofgem Review Group on Energy Market Issues for Biomethane Projects (EMIB) Gas Quality Analysis at Biomethane Entry REA Biogas Group the voice of the UK.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
Didcot Biomethane to Grid project Learning Points SGN and CNG Services Ltd (CSL)
1/20 ea technology MicroCHeaP: Month 24 meeting Athens Work Package 4 presentation 21 September 2006 Presented by Yvonne Dickson Partners in power asset.
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
Institute of Chemical Engineering page 1 Achema 2012 Thermal Process Engineering Martin Miltner, Aleksander Makaruk, Ass.Prof. Michael Harasek
- Overview about Malaysia oil and gas - level of realism to traditional drawing (2D dwg) - Be able to store huge amount of data referring. - Single source.
Implementation of the Public Procurement Directives in the UK Peter Bennett Office of Government Commerce Vilnius 9 December 2004.
Biomethane and the European gas infrastructure EBA Workshop 3 September 2015 Thierry Deschuyteneer Executive Secretary.
Getting your specifications Right! Florence Gregg figpc ltd E:
IPP and Corruption in Indonesia Fabby Tumiwa Institute for Essential Services Reform 14 th IACC Workshop CLEAN ENERGY 13 November 2010.
Training for Rebuilding Europe Retrofitting buildings, training and improved skills, and financing energy efficiency in buildings. 10 December 2010 – 10.
No: 1 CEMSIS wp6_beg022_v0_4_intro slides.ppt CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk.
Ofgem Review Group on Energy Market Issues for Biomethane Projects (EMIB) Update on Issues REA Biogas Group the voice of the UK Biogas industry since 2004.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
AIMAG GROUP OVERVIEW AIMAG GROUP An integrated system of companies for innovation and quality of service. A multi-utility company for the.
DRAKENSBERG PUMPED STORAGE SCHEME 29 June Unit 1-3 Generator Stator refurbishment (Tender: PS(DPS)2015/DJ/01) Clarification Meeting 29 June 2015.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Workshop synthesis Robert Judd General Secretary GERG GERG/MARCOGAZ Gas Sensor Workshop, Brussels, 27th February 2014.
Arkom Engineering Consultants
Renewable energy support schemes in the Republic of Moldova
Planning and Realisation of Wind Farms
Summary Why Biomethane Support for biomethane What is biomethane
SOUTHERN AFRICA Sectors represented Water Energy Agriculture
Environmental and Social Considerations in Public Procurement
Damitha Kumarasinghe Director General
OH&S Plant Obligations make
DS3 and Qualifier Trials Update
PSK Standardisointi PSK Standards Association
Network Innovation Allowance Project: South East Smart Grid
Overview on Renewable energy in Bulgaria
ChE 473K Plant Design R. Bruce Eldridge.
Traceability of Gas Pipeline Materials Research & Materials Manager
BU IS GIG Chemical, Oil & Gas
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
Storage & Backup Solution Update
March, 30 – April 3, 2009, Honolulu, Hawaii
Andrea Sundstrand Associate Professor
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Presentation transcript:

1 Packaging bio- methane connections for the future Dan Anderson CEng 11 th January 2012

2 The context  Utility bespoke design and build delivery model needs to evolve for the growth of renewable gas connections – approximately 250 biomethane injection plants will be required by 2020 to meet UK renewable energy targets.  Current approach:  Design and build cost is circa £650k for the injection plant (excluding connecting pipe and remote monitoring).  Lead time circa 12 months design and build (excluding remote monitoring point and remote monitoring).

3 The requirement  Need a pre-approved packaged design for biogas connections with suppliers on a call off contract to provide the built units to site  Key components: 1.Develop a fit for purpose cost-effective engineering specification for a packaged solution. 2.Develop a tender to source suppliers who can provide pre- approved packaged designs to meet the specification, which they can supply to site ready built. 3.Allow the concept to be future-proofed as ownership may not be with the GDN and regulatory requirements will change.

4 The scope of the basic package Instrumentation links Pressure Reduction Gas Analyser Fiscal Metering Odorant Injection Electrical transformer and electrical distribution system Process Shut down valve Housing for the unit / component parts Gas produced by biomethane producer clean up plant (to include propane enrichment) FWACV Gas Quality and supervisory system Gas Grid Downstream remote monitoring option DB1Telemetry Unit To Control Centre To Bio Methane producer

5 Approach to a packaged design Basic packaged approved design (G19) Mechanical Electrical Instrumentation Software (approach) Site specific design (G17) Telemetry Civil Site specific software TD/13 Industry Standards Company policies derived from Electricty at Work Regulations and British Standards User requirements specification / Functional Design / Software Design Spec, Test Procedures, Functional Blocks FWACV

6 The journey to a packaged solution Contract award Bid for first call off Build procurement strategy Work with Multi-disciplined engineering team – identify the sub systems and draw out the key requirements for each Engineering Integrity sign on Issue full tender Provide technical guidance and manage the input of technical experts to ensure the needs of the application are met Manage technical issues with suppliers input into design development Build support for the concept

7 How the call off arrangement will work New connection Supplier 2 Supplier 3 Supplier 4 Supplier 1 Complete telemetry / civil / pipework design Mini tender Select supplier Gas quality assessment Hazop with chosen supplier Call off Contract Supplier to produce site specific design amendments to basic package Unit built Install and commission

8 Integration into the future Biogas Clean up PRS Vol. Meter GC Gas Grid FWACV configurable supervisory and control system Odour DB1 Telemetry GDN (Logic Control) DNCC DFOGDN Odour DFOGDN

9 The outcomes  Packaged designs which can operate over the following operating conditions:  Pressure  Max inlet of 7 bar and Min outlet of 75mb  Flow  20m3/h m3/h  Size  Equal in scale to a shipping container

10 The outcomes  Substantial cost saving  Lead times of 5-6 months (for supply to site)  Four suppliers are involved in the tender who can now be approached by DFOs/other GDNs should they wish to purchase a packaged unit.  Technica Ltd  Elster-Instromet  Orbital Gas Systems  Biogast/Future Energy Group Ltd  The work puts in place a platform for the industry to build from into the future.

11 Thank you Any questions ?