Doc.: IEEE P2030-09-0102-00-0004 Submission October 2009 Infineon Technologies NASlide 1 G.hn: Update on the status and use for Smart Grid Date: 2009-10-28.

Slides:



Advertisements
Similar presentations
$ Network Support for Wireless Connectivity in the TV Bands Victor Bahl Ranveer Chandra Thomas Moscibroda Srihari Narlanka Yunnan Wu Yuan.
Advertisements

All Rights Reserved © Alcatel-Lucent 2006, ##### Design Issues for Wireless Networks Across Diverse and Fragmented Spectrum Collaborators: Bell Labs India:
ZigBee & TinyOS TinyOS and ZigBee are not competitive
Doc.: IEEE /0204r2 Submission March 2010 David Halasz, AclaraSlide 1 Comments on Sub 1 GHz license-exempt operation Date: Authors:
Doc.: IEEE /064r0 Submission March 2000 Mårten Mattsson, EricssonSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on ITU-R Activities In October/November ITU-R held two.
IEEE Submission Sept 2008 Michael Lynch, Nortel Networks Slide 1 ITU-R Regulatory Background Date: Authors:
Doc.: IEEE P Submission January 2010 John Doe, Some CompanySlide 1 New ITU-T project called Home Networking aspects of energy management.
Doc.: IEEE /087 Submission May, 2000 Steven Gray, NOKIA Jyri Rinnemaa, Jouni Mikkonen Nokia Slide 1.
Doc.: IEEE /0046r0 Submission July 2009 Ari Ahtiainen, NokiaSlide 1 A Cooperation Mechanism for Coexistence between Secondary User Networks on.
Doc.: IEEE Submission ETRI May 2013 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
1 G.hnem A new ITU-T project on home networking aspects of energy management Vladimir Oksman Jan DCN
Updated China's 5GHz Spectrum Regulation
Doc.: IEEE /265r0 Submission June 2001 Robert F. Heile, Consultant Steve Shellhammer, Symbol Technologies Slide 1 IEEE P Working Group for.
Doc.: IEEE g TG4g - SUN November 2009 Phil Beecher, Beecher Communications Consultants Ltd Slide 1 Project: IEEE P Working Group.
Doc.: IEEE r2 Submission November 2009 Bruce Kraemer, MarvellSlide 1 Wireless Characterization for NIST PAP#2 Date: Authors:
Steve Joiner, Technical Committee Chair John McDonough, Member OIF Board of Directors Optical Internetworking Forum.
Fostering worldwide interoperabilityGeneva, July 2009 IEEE IP over Broadband Access in Support of Convergence Dr. W. Charlton Adams, President, IEEE.
Fostering worldwide interoperabilityGeneva, July 2009 Home Networking in ITU-T Global Standards Collaboration (GSC) 14 DOCUMENT #:GSC14-GTSC-022.
Doc.: 18-11/58r0 Submission July 2011 John Notor, Notor ResearchSlide 1 Summary of ITU-R Documents Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /1062r2 Submission Zhendong Luo, CATR September 2010 RF Feasibility of 120 MHz Channelization for China Date: Authors: Slide.
Sg-whitespace-08/0006r0 Submission December 2008 Steve Shellhammer, QualcommSlide 1 Coexistence in TV White Space Date: Authors:
Doc.: IEEE / wng SubmissionRoberto Aiello, Stefan MangoldSlide 1 carrier-grade operating in paired spectrum Date: Authors:
Doc.: IEEE /1521r2 Submission January 2012 Marc Emmelmann, FOKUSSlide 1 AP and Network Discovery Enhancements Date: Authors:
Doc.: IEEE /0283r0 Submission March 2009 Dan Harkins, Aruba NetworksSlide 1 Suggested Changes to the Abbreviated Handshake Date: Authors:
Doc.: IEEE /1457r0 Submission December 2010 David Halasz, OakTree WirelessSlide 1 Frequency Hopping Review and IEEE ah Date:
Doc.: IEEE /108r0 Submission January 2003 Adrian Stephens, IntelSlide 1 Some proposed motions for HT SG Adrian P Stephens
Doc.: IEEE /1190r2 September 2014 Submission Kaiying Lv (ZTE) Frame Exchange Control for Uplink Multi-user transmission Slide 1 Date:
Doc.: IEEE xxx Submission January 2015 N. Sato and K. Fukui (OKI)Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /416r1 Submission November 2000 Richard Kennedy, Compaq Computer CorporationSlide 1 Items for Discussion SCOPE OF THIS EFFORT CRITICAL.
Wireless Sensor Network Deployment Lessons Learned Steven Lanzisera Environmental Energy Technologies Division, LBNL 21 January 2011.
Computers Are Your Future © 2008 Prentice-Hall, Inc.
Doc.: IEEE /1126r0 Submission September 2012 Krishna Sayana, SamsungSlide 1 Wi-Fi for Hotspot Deployments and Cellular Offload Date:
Doc.: IEEE /0848r0 Submission January 2008 Gal Basson (Wilocity)Slide Wireless LAN user experience Date: Authors:
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Doc.: IEEE j Submission May 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Power Line Carrier Communication VAIBHAV RAI EN VI-B
Doc.: IEEE /0498r0 Submission April 2008 Eldad Perahia, Intel CorporationSlide 1 Modifications to the 60GHz PAR & 5 C’s Proposal Date:
Doc.: IEEE e Submission: NAN Application Description 11 November 2008 RolfeSlide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE /0065r0 Submission January 2014 William Carney, SONYSlide 1 Comments on Draft HEW PAR Date: Authors:
Doc.: IEEE /308r0 Submission May 2002 Y Inoue, et.al.,NTT Laboratories Slide 1 Next Generation Wireless LANs Yasuhiko Inoue, Tetsu Sakata and.
Doc.:IEEE /0821r3 Submission July 2008 Minho Cheong, ETRISlide 1 Some Ambiguities about Throughput Conditions in PAR Date: Authors:
Doc.: IEEE /0127r0 Submission January 2009 John R. Barr, Motorola, Inc.Slide 1 Bluetooth AFH and IEEE Date: Authors:
Doc.: IEEE wng0 12-May-2008 FlammerSubmission: MAC Requirements for Smart Grid Slide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE g Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ Supporting.
Standardization activities on Home Networking in CCSA CCSA DOCUMENT #:GSC13-GTSC6-08 FOR:Presentation or Information SOURCE:CCSA AGENDA ITEM:GTSC; 4.3.
May 2011doc.: IEEE 15-XX-XXXX-XX-Xpsc SubmissionSamsung Electronics, ETRI Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /0176r0 Submission Jan 2013 Bo Sun, ZTE/CWPANSlide 1 Date: Presenter: Proposal of Channelization for aj.
Kevin Harrison LTEC 4550 Assignment 3.  Ethernet Hub  An unsophisticated device that is used for connecting multiple Ethernet devices together.  Typically.
Doc.: IEEE /0013r0 Submission January 2010 Mika Kasslin, NokiaSlide 1 Coexistence architecture of Notice: This document has been prepared.
Doc.: IEEE m Submission ETRI July 2012 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Submission doc.: IEEE /1064r0 September 2015 Jarkko Kneckt, NokiaSlide 1 Long Range, Low Power Design Criteria Date: Authors:
<author>, <company>
Submission Title: [TG4a General Framework]
November 2005 Liaison Report from P1901
W-SUN Technical Requirements Discussion
<month year> IEEE P xxxx g July 2009
Submission Title: [FHSS Proposal] Date Submitted: [May 12, 2009]
Submission Title: [WG-TG3 Closing Report Nov03]
Submission Title: [WG-TG3 Closing Report Nov03]
VHT60 Tutorial Date: Authors: July 2008 April 2007
doc.: IEEE <doc#>
G.hn The New ITU-T Home Networking Standard
Functional Requirements for EHT Specification Framework
13 November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [NAN Application Description] Date Submitted:
Comments on Sub 1 GHz license-exempt operation
IEEE P Working Group for Wireless Personal Area Networks
Strawmodel ac Specification Framework
TGah Coexistence Assurance
Functional Requirements for EHT Specification Framework
Presentation transcript:

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 1 G.hn: Update on the status and use for Smart Grid Date: Authors:

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 2 ITU Standards International Telecommunication Union –A United Nations organization, the top-level international SDO –Recognized by WTO –Members are countries (Member States) and private entities (Sector Members) Composed of Three Parts: –ITU-R (formerly CCIR): radio spectrum regulations –ITU-T (formerly CCITT): telecommunications standards (a.k.a. Recommendations) –ITU-D: promotes telecommunications in developing countries The ITU-T SG15/Q4 founded in 1997 and developed 11 DSL Recommendations (over 600 Million DSL ports deployed) and the first HN Recommendations ( G.998, G.9954, over phone wiring in ). Now finalizing G.hn

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 3 G.hn Recommendations During the last years ITU-T developed Recommendations for a world- wide HN standard, operating on any type of wiring - powerline, coax, phoneline, and Cat 5: - G.9960 – G.hn PHY - G.9961 – G.hn DLL (MAC +) - G.9972 – Coexistence G.hn Recommendations intended to ensure interoperability and backwards compatibility of HN devices around the world, and coexistence with IEEE P1901 and other relevant HN technologies G.hn is the next generation HN technology: - bandwidth up to 200 MHz; - bit rates up to 1 Gb/s - powerful tools for Qos support (latency, in particular) Scalable, energy efficient technology, intended to address the range of applications from residential gateways to simple home-automation devices, while all devices are interoperable

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 4 How G.hn technology is so flexible? It is a combination of a single PHY and a single MAC with carefully selected set of programmable parameters PHY: - programmable symbol length, guard interval, FEC and retransmission parameters - multiple frequency band-plans, allowing baseband, passband, and RF transmission (over coax) - flexible PSD masks and powerful PSD shaping tools MAC: - access methods for contention-free, contention-avoidance, and contention-based access - priority-based and parameter-based QoS - point-to-point and a full multi-hop mesh networking - powerful security: CCM encryption (AES 128) with a choice of pair-wise key assignment or per-domain key assignement

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 5 G.hn – multi-domain network architecture

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 6 Updated road map of G.hn G.hn Working Group formed in ITU G.hn Working Group formed in ITU 1H 06 2H 08 G.hn PHY and Architecture Consented 1H 10Finalizing of DLL special management procedures, and consent of DLL (G.9961) 1H 10 Finalizing of DLL special management procedures, and consent of DLL (G.9961) 1H 09 Data Link Layer progressed to Baseline Text 2H 09 Approval of G.9960, consent of G.9972, determination of the DLL baseline text Approval of G.9960, consent of G.9972, determination of the DLL baseline text 1H 10Approval of all HN Recommendations 1H 10 Approval of all HN Recommendations

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 7 G.hn for Smart Grid applications G.hn addresses requirements to support the Smart Grid by defining a profile that provides significantly reduced complexity and power consumption in exchange to lower bit rates and reduced set on management functions (that are irrelevant for Smart Grid); G.hn Smart Grid devices are fully interoperable with all other G.hn devices NIST put G.hn on the list of the "Standards Identified for Implementation" for the Smart Grid initiative.

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 8 OSI Layers – relation between SG and G.hn Since Smart Grid addresses OSI layers L3 and above, the relation between SG and G.hn is limited to common interface primitives and performance requirements: Performance requirements: - Media types - Bit rate - Latency (QoS) - Security Interface primitives: The SGPC sub-layer should convert SG L3 protocol to Ethernet primitives (802.1)

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 9 Interoperability of HAN devices Despite the particular PHY/MAC technology is irrelevant for SG (since SG is on layer L3 and above), using of a world-wide standard PHY/MAC is beneficial because SG devices using different technologies are not interoperable; All HN devices should use the same A-interface protocol (802.1 MAC SAP is suggested); If multiple PHY/MAC technologies are used, the way to get interoperability is: - use a multi-domain HAN, so that different technologies operate is different domains; - use adaptors to connect appliances (so, the user can select the right one);

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 10 Utility access example: mixed HAN, single domain

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 11 Utility access example: mixed HAN, multi-domain

doc.: IEEE P Submission October 2009 Infineon Technologies NASlide 12 Wrap up G.hn made significant progress in last two month and moving to completion. January is a goal to consent the last part of the G.hn transceiver – the DLL It seems that TF3 can progress its work by adopting the following principles regarding PHY/MAC technologies: - TF3 is agnostic to a specific type of PHY/MAC - TF3 mandates the interface protocol with PHY/MAC (A- interface of G.hn, Ethernet suggested to be considered) - TF3 nails down its layer L3 protocol ASAP - TF3 defines the minimum set of PHY/MAC performance parameters (bit rate, latency, media type, etc.) We propose TF3 to establish liaison with ITU-T SG15/Q4