doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 1 IEEE Wireless Coexistence TAG Steve Shellhammer Proposed Changes to 802 Policies and Procedures
doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 2 IEEE / r4 6.6 Coexistence For a wireless project to be authorized, the WG is required to produce a Coexistence Assurance (CA) document to be submitted with their draft unless there is a compelling reason to omit this step. –Working Group will submit a CA document with the draft –Working Group will not submit a CA document If no CA document, state reason: _________________________
doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 3 IEEE / r4 Procedure 11 PROCEDURE FOR APPROVAL TO FORWARD A DRAFT WIRELESS STANDARD In the process of preparing for Sponsor Ballot, the WG shall provide the coexistence assurance (CA) document to the TAG no less than 60 days prior to requesting that the LMSC SEC send the draft to sponsor ballot. The LMSC recommends that the WG provide the CA document to prior to WG letter ballot. The TAG shall give its technical comments on the CA document within 45 days after receipt. The TAG will evaluate if the CA methodology was applied appropriately and reported correctly. The LMSC shall make the final determination on whether the coexistence necessary for the standard or amendment, as defined by the WG, has been met.
doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 4 TAG Letter Ballot The Coexistence TAG held a letter ballot to submit proposed 802 P&P changes (802.19/ r4) to the Executive Committee. The letter ballot was approved unanimously –Yes10 –No0 –Abstain0
doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 5 Potential Changes Require CA document at WG letter ballot, and updated CA document at Sponsor Ballot Restrict requirement to standards in unlicensed bands TAG to offer its technical recommendations Drop the Sixth Criteria
doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 6 Plan going Forward Meet one-on-one with EC members to discuss their issues with proposed changes Update document to address issues Potentially, make a motion on Friday to hold a EC letter ballot on proposed P&P changes.