Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4276 Fall 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor,

Slides:



Advertisements
Similar presentations
Todays Agenda 1. Review Project Management Principles 2. Project Management Institute (PMI) Framework 3. PMI Processes 4. Break into Project Teams and.
Advertisements

Thermostats, Pressure Switches, and Other Electric Control Devices
Pelton Wheel Turbine Generator Drew Ramsey, Ashley Munguia, Justin Johnstone, Chris Yonts Undergraduate – Texas A&M University at Galveston Senior Advisor:
Thermoflow, Inc. TOPS stands for Thermoflow’s Optimization System and is a general purpose optimizer for use with Thermoflow’s core programs. TOPS runs.
What is STEAM MASTER While STEAM PRO is the design program for conventional steam cycle plants, STEAM MASTER is the associated simulation program for off-design.
Air-Conditioning Control Systems
EGEE 102 – Energy Conservation And Environmental Protection Energy Efficiency.
9 CHAPTER Vapor and Combined Power Cycles.
Team Notus TEAM NOTUS UNIVERSITY OF HOUSTON COLLEGE OF TECHNOLOGY SENIOR DESIGN 1 Horizontal Wind Turbine.
AIR CONDITIONING (COOLING) UNIT 40 TYPICAL OPERATING CONDITIONS
Introducing Belliss USA Inc.
“Energy Efficiency Guide for Industry in Asia”
Marine Steam Power Plant Heat Balance By Steven Gelardi
Multidisciplinary Engineering Senior Design Automated Plasma Generator Test System Preliminary Design Review 11/11/05 Project Sponsor: MKS, ENI Incorporated.
ME 388 – Applied Instrumentation Laboratory Centrifugal Pump Lab.
Crystal Oscillator Negative Resistance Measurement System Cypress-R Team Members Tracey Windley Adam El-Mansouri Mentor Dr. Herb Hess Client Contact Aaron.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
What is Instrumentation? Seth Price Department of Chemical Engineering New Mexico Tech Rev. 1/8/15.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Thermal_Power_Plant_2 Prepared by: NMG
TURBINE & COOLING SYSTEM Presented By – AVIJEET PRATAP 07ME12 IET AGRA
EGR 334 Thermodynamics Chapter 8: Sections 1-2
Chem. Eng. Thermodynamics (TKK-2137) 14/15 Semester 3 Instructor: Rama Oktavian Office Hr.: M.13-15, Tu , W ,
Boker Wright, Dan Lewis, Tina Foley and Brandon Wissel.
Water piping design.
DESIGN AND CONSTRUCTION OF AN INDUCTION FURNACE (COOLING SYSTEM) Presented by MG THANT ZIN WIN Roll No: Ph.D-M-7 Supervisors : Dr Mi Sanda Mon Daw Khin.
Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This
Motor/ Centrifugal Pump Performance Jerry Bird Pumps
Electrical Engineering in the Semiconductor Equipment Industry A Look at a Typical Job Description of an Equipment Electrical Engineer Recent Job Description….
BODHPS PROTOTYPE B Testing and Documentation of improved prototype with a record of power output.
Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4276 Fall 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor,
SOLAR THERMAL AIR CONDITIONER Design Team 8. Introduction Solar Air Conditioner Introduction Design Testing Conclusion 5 April 2012 Team 8 Slide 2 of.
Heliocentris Commercial Confidential 1 Integration of Industrial Fuel Cells in Technical Applications Using the NEXA ® Training System Dr. Claus Fischer.
Group 17 Oceanic Thermal Energy Conversion Model - Lockheed Martin 1 Oceanic Thermal Energy Conversions Group Members: Brooks Collins Kirby Little Chris.
 Engineers are regularly engaged in projects in their careers!  Middle management continues to shrink  Industry now organizes more around projects.
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
ENTC-370PROF. ALVARADO1 LAB 8: Steam Turbine (Rankine Cycle Experiment) ENTC
Lesson 8 SECOND LAW OF THERMODYNAMICS
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
STEAM TURBINE POWER CYCLES. The vast majority of electrical generating plants are variations of vapour power plants in which water is the working fluid.
Power and Power Measurement ENGR 10 – Intro to Engineering College of Engineering San Jose State University (Ping Hsu and Ken Youssefi) 1 Introduction.
Program Requirements Alternative Energy Supplement Design Requirements Problem Statement Testing Economic Analysis Energy System Program Requirements Calculate.
Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4275 Spring 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor,
ET 494 Senior Design II Fall 2013 By: Justin Cifreo, Benjamin Gabriel, Nathan Taylor Instructor: Dr. Cris Koutsougeras Advisor: Dr. Junkun Ma Mechanical.
MINIATURE JOULE-THOMSON CRYOCOOLERS FOR PROPELLENT MANAGEMENT
Professor: Jeffery Perl Mentor: Dennis O’Brian Team Members: Jinrong Chen, Kei Simmel, Hantao Wang, Marzena Zarycki Scribe: Hantao Wang.
ELECTRICITY COST OF CHILLER AND COOLING TOWER PUMPS KILLING YOU? We Have The RIGHT Solution just for YOU! + =
Nanofluidic Characterization David Sharp David West Justin Davis.
P13631: Gravity Fed Flow Process Control Teaching Aid An RIT education couples theory in lecture with practical application in lab. In the past, carts.
Experiment 6: Rankine Cycle Yvette Triay Reporter Group 3.
POWERFUL SOLUTIONS. GLOBAL FORCE. TQ700 Lightweight Torque Wrench Pump May, 2013.
CENTRIFUGAL PUMPS:- DESIGN & PERFORMANCE Ir. N. Jayaseelan 2012.
CSI Controller Automated Logic Controller Existing Lab Station Lab Station Expansion TEAM MEMBERS: CLIENT: Andy
EGEE 102 – Energy Conservation And Environmental Protection Energy Efficiency.
Gas Pressure Meter (Engineering World Health) Advisor: Prof. Ken Gentry Client: Prof. John Webster, Engineering World Health Engineering World Health Team.
Water turbines Billy Gerena # Robert De Aza # 66880
Date of download: 6/23/2016 Copyright © ASME. All rights reserved. From: Heat Transfer and Pressure Drop Analysis of Chilled Water and Ice Slurry in a.
LIME INSTRUMENTS March 2013 NOMADS April 9 th, 2013 Rob Stewart Lime Instruments President.
Irrigation Pumping Plants
BSB Biomanufacturing CHAPTER 2 Process Plant Design – Part III
Design, Evaluation and Application of a Fuel Cell Vehicle
Forging new generations of engineers
10TR Nominal Glycol Chiller
Control System Instrumentation
Pumps and Lift Stations
Forging new generations of engineers
MicroLogix Packaged Controllers
Condenser in Power Plants
Combined Cycle Power Plants
Presentation transcript:

Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4276 Fall 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor, Technip USA Keith Wingfield- CAA Tech Center Engineering Consultant Chris LeBlanc- VP of Sales and Marketing, Lime Instruments Instructor: Professor Raresh Pascali

Outline Objective/Goals Purpose Lab Experiments Market Research ▫Online survey Proposed Table Setup Current market offerings Design and Analysis ▫System Schematic ▫Thermodynamic Analysis ▫Process Analysis ▫Calculations ▫Parts Budget Parts to be acquired Risk Matrix Gantt Chart Sponsorship Lessons Learned Questions 2

Objective Create a compact, portable steam power plant trainer that will aid in the understanding of the Rankine cycle and automated system control 3 Goals Achieve fully automated system control Rolling frame for ease of transport ▫Dimensions of 4x2x3.5 ft Deliver the product complete with multiple lab experiments

Purpose Steam power plants account for roughly 78% of the world’s electricity Many students find difficulty understanding thermodynamics without being able to apply theory to real world application Students will learn the automated control system and will obtain a working knowledge of how to check transducer readings 4

Lab Experiments Plot power curve ▫Watts vs. Flow rate ▫Watts vs. % Valve Calculate energy drop through condenser 5

Online Survey Using Survey Monkey ▫110 respondents ▫10 questions Questions: 1.What is your age? 2.What type of engineering degree do you have? 3.What is the highest level of school or degree you have completed? 4.Did you take thermodynamics? 5.If so, did it require a lab section? 6.Did your thermodynamics class/lab include steam power plant training station? 7.Did you find the training equipment useful? 8. If the training equipment was not useful, why? 9. If you did not have training equipment, would you have liked to have one? Would it have been beneficial? 10. What is your alma mater? 6

Market Research Results 7

Current Market Offerings 8 $33,000$40,000Unknown Price$175, ,000

Proposed Table Setup 9

System Schematic 10

Analysis 11 T-S Diagram for Steam Process Diagram

Process Analysis 12 q in = Btu/lbm 18.7 psi 225°F 1095 Btu/lbm 14.7 psi

Control Systems 13 National Instruments Compact Rio Donated

14

Steam Generator 15 Infinity Fluids Inline-instant Steam Generator 220V $ Model NumberA (in)B (in) C (FNPT Std.)D (in) Watts (kW)VoltsPhasesAMPS CRES-SG K / CRES-SG K / CRES-SG K / CRES-SG K /

16

Valves 17 Assured Automation Control Valve ¼” Inlet-Outlet Full Port Ball Valve psi $ Aquatrol Pressure Safety Valve Inlet: ¼” Overall Height: 2-7/8” Pressure Range: psi Temperature Range: 0-406°F ASME Section VIII/CRN $75.00

18

Flow Meter 19 Simple Float style units or high resolution digital units Price Unknown

20

Pressure Transducers 21 Pressure Transducer Options Considerations Pressure range1525 Cost816 Ease of integration99 Response time44 Availability52 Total4156 ConsiderationsWeightMultiplier 1-5 Pressure range535 Cost424 Ease of integration333 Response time222 Availability152

Temperature Transducers 22 Thermocouple Options Considerations Temperature range1510 Cost812 Ease of integration99 Response time44 Availability53 Total4138 ConsiderationsWeightMultiplier 1-5 Temperature range532 Cost423 Ease of integration333 Response time222 Availability153

23

Turbine Pump 24 Purchasing v.s. Manufacturing RANKIN ROLLERS Quoted $1500 $ Wolfgang Engineering

25

DC Motor 26 Ningbo Shengguang Motor Co. Voltage: 12 Volt Input Power: 1.8W, 2.5W, 7.0W Speed: R.P.M. Price Unknown

27

Analog Pressure & Temperature Display Gauge 28 Pressure Rang: 0-75 psi Temperature Range: ° F $37.75

29

Cooling Tower & Pump 30 Flow Rate: 500 gph 12 Volt DC Height: 2.0 ft Width: 13.0 in

31

Condenser Analysis 32

Manufactured Condenser Design 33

34

Recirculating Pump 35 Tangda Submersible Water Pump DC 12 V 132 gph $32.00

Budget 36

What needs to be acquired 37

Risk Matrix 38 Severity Catastrophic 1, 42, 10 Severe 11 8 High 3 Medium 57 6 Low 9 PossibleHighVery HighDefinite Likelihood RiskMitigation 2More hours on foot 8Work close with industry advisors 10Finalize parts and order when funds come in

WBS 39

Gantt Chart 40

Current Sponsors 41 Sponsorship Package

Lessons Learned Time management is key. Start funding ASAP. Trust but verify. Ask team members for help when needed. 42

Contact Us Online: ▫ ▫ Facebook: ▫facebook.com/RankinRollerfacebook.com/RankinRoller 43

Questions?