 Engineers are regularly engaged in projects in their careers!  Middle management continues to shrink  Industry now organizes more around projects.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Chapter 3 Managing the Information Systems Project
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Systems Analysis and Design 9th Edition
Project Management: A Managerial Approach
Project Title (as descriptive as possible) Group Members CPE Computer Engineering Design I Electrical and Computer Engineering.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
CS Techniques Supporting Project Management (Part 4) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Roberta Russell & Bernard W. Taylor, III
Project Time Management
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Project Scheduling & Budgeting CEE 402 Engineers Without Frontiers Lecture 6 February 26, 2003.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Project Management and Scheduling
Chapter 6 Introduction to Microsoft Project
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Chapter 3 : Managing the Information Systems Project.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
 Probably the most time-consuming project management activity.  Continuous activity - Plans must be regularly revised.  Various different types of.
Edward B. Farkas, Managing Director, Project Management Practice
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Successful IT Projects slides © 2007 Darren Dalcher & Lindsey Brodie Successful IT Projects By Darren Dalcher & Lindsey Brodie
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Software Project Management Lecture # 7. Outline Project Scheduling.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Software Project Management
1 Teamwork Skills and Project Management 1. Teamwork Skills.
Geog 469 GIS Workshop Project Management.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN
10 Aug 2010 ECE/BENG-492 SENIOR ADVANCED DESIGN PROJECT Meeting #7.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
SOW / Open Workbench By Wilmer Arellano Summer 2013.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Chapter 3 Managing the Information Systems Project
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Project Management Organization Scheduling 31 January.
 Engineers have led the way on project management, it is now “hot and trendy”.  #1 Area of Continuing Education reported by Penn State Behrend ECE alumni.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
SOW / Open Workbench By Wilmer Arellano Fall 2010.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section A 1.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
SOFTWARE PROJECT MANAGEMENT
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
SOW / Open Workbench By Wilmer Arellano Spring 2008.
SOW / Open Workbench By Wilmer Arellano Fall 2008.
WEEK 3 Project Planning.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Project Management MGT 30725
By Wilmer Arellano Spring 2010
The Project Schedule and Budget
Project Management and Information Security
Project Activity and Risk Planning
Chapter 3 Managing the Information Systems Project
Information Technology Project Management
Defining the Activities
PLANNING ENGINEERING AND PROJECT MANAGEMENT
SE Tasks for a Concept Development Project
Presentation transcript:

 Engineers are regularly engaged in projects in their careers!  Middle management continues to shrink  Industry now organizes more around projects than functions. 2

 Engineers have led the way on project management, it is now “hot and trendy”.  #1 Area of Continuing Education reported by Penn State Behrend ECE alumni.  Penn State Behrend School of Engineering Survey 2003 of Fortune 500 companies- #1 required skill for new engineers = PROJECT MANAGEMENT SKILLS 3

To complete the project ◦ On-time ◦ Within budget ◦ So that it meets the requirements 4

By the end of this chapter, you should  Be able to create a work breakdown structure.  Be able to create network diagrams and Gantt charts.  Be able to determine the critical path for completing a project and the float time for each activity in the plan.  Be able to conduct break-even analysis and understand some basic methods of cost estimation.  APPLY THIS TO YOUR PROJECT – YOU MUST LEARN BY DOING! 5

Work Breakdown Structure (WBS) Activity 6

Tasks Deliverables 7

From MIL-HDBK 881  A product-oriented family tree composed of hardware, software, services, data, and facilities. The family tree results from systems engineering efforts.  A WBS displays and defines the product, or products, to be developed and/or produced. It relates the elements of work to be accomplished to each other and to the end product.  A WBS can be expressed down to any level of interest. However the top three levels are as far as any program or contract need go unless …. 8

 Activities  Responsibilities  Timeline  Dependencies  Costs HINT: THESE THINGS OUGHT TO BE IN YOUR PLAN! 9

Problem: Create the WBS for a temperature monitoring system design 10

There are three main tasks 1. The analog interface circuitry. 2. The LED & digital circuitry. 3. Integrate & Test. 11

 Activity: Design Circuitry  Description: Complete the detailed design and verify it.  Deliverables/Checkpoints: 1) Circuit schematic, and 2) Verify in simulation.  Duration: 14 days.  People: Jana (1), Rob (1)  Resources: PC, SPICE Simulator  Predecessors: none 12

IDActivityDescriptionDeliverables / Checkpoints Duration (days) PeopleResourcesPredeces sors 1Interface Circuitry 1.1Design CircuitryComplete the detailed design and verify it in simulation.  Circuit schematic  Simulation verification 14Rob (1) Jana (1)  PC  SPICE simulator 1.2Purchase Components  Identify parts  Place order  Receive parts 10Rob Construct & Test Circuits Build and test Current Driver Circuitry Test of circuit with sensing device.  Test data  Measurement of linearity 2Jana (1) Rob (2)  Test bench  Thermo- meter Level Offset & Gain Circuitry Test of circuit with voltage inputs.  Test data  Measurement of linearity 3Rob (1) Jana (2)  Test bench Integrate Components Integrate the current driver and offset circuits.  Test data verifying functionality and linearity requirement 5Rob (1) Jana (1)  Test bench  Thermo- meter

PERT: Project Evaluation and Review Technique  Statistical methods to estimate project completion time.  Based on earlier studies that show that project task completion follows a Beta probability distribution. 14

 A network diagram is a ???  We will use AON (Activity on Node) 15

16

Problem: identify the paths to completion. 17

Critical Path = Slippage = Float = 18

Problem: Calculate the float for all activities in network. 19

20

 How do you complete projects within cost?  Need to be able to estimate costs for ◦ System design ◦ Development ◦ Manufacture  Basics presented here – complex problem that requires experience. 21

Fixed costs Variable Costs Break-Even Point 22

23

24

 Take the initial time estimates for activities and double them!  Assign a lot of time for testing and integration.  Factor in lead times for part ordering.  Assign a project manager(s).  Do not assign all team members to all tasks.  Track the progress versus the plan.  Don’t become a slave to the plan.  Experience counts. 25

A Project Plan should contain  Work Breakdown Structure. Identify the activities, deliverables, responsibilities, duration, resources, and dependencies.  Gantt Chart and/or Network Diagram. Provide a graphical representation of the project plan.  Costs. Develop a tabulated list of costs and for the equipment, materials, and labor necessary to carry out the project. 26

 Three important objectives of project management are to complete the project ◦ On-time ◦ Within budget ◦ To meet the needs of the user.  WBS – hierarchical breakdown of activities needed to complete a project.  Network diagram – graphical representation of activities for project – can use for quantitative analysis of project.  Cost estimates ◦ Break-even analysis ◦ Cost estimation models 27