Paris, 16 th March 2010 11th SG Meeting South Gas Regional Initiative.

Slides:



Advertisements
Similar presentations
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Open seasons in European Markets: Overview and initial lessons learned Dominique Jamme ERGEGs Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
15 th September 2013 Enagás and TIGF Information to NRAs.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
French transport structure SG meeting Madrid – 15 July 2009.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
Madrid, 12 th April th IG Meeting South Gas Regional Initiative.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
1 Open season th IG Meeting 26 th March 2010 Paris.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
8th SG Meeting South Gas Regional Initiative 27th April 2009, Paris.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
Madrid, 1st April th SG Meeting South Gas Regional Initiative.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
European Developments Transmission Workgroup 1 st December 2011.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative 14 th Stakeholders Group meeting Madrid, 11 th July 2011.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
29th November 2016 Teleconference
21st IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
43th IG Meeting South Gas Regional Initiative
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
ERGEG South Gas Regional Initiative
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
26th February 2015 Teleconference
29th April 2014 Teleconference
Enagás, GRTgaz, Reganosa, REN and TIGF
26th February 2015 Teleconference
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

Paris, 16 th March th SG Meeting South Gas Regional Initiative

2 Agenda

3 II. Action plan for 2010 During the 8 th RCC, held on 29 January 2010, the Regulators approved the following work program for 2010 : INTERCONNECTION CAPACITIES 1.Capacity allocation mechanisms (CAM): 2010 OSP. GRI South will continue allocating short term capacity at Larrau, (scheduled in November) 2.New infrastructures: 2013 OS. Regulators in the GRI South will monitor infrastructure construction associated to 2013 OS French TSOs and CRE to report on French investments decisions, (Done in January) TSOs to provide a list of infrastructures, cost and operational start dates, (Done in February)

4 II. Action plan for 2010 INTERCONNECTION CAPACITIES (cont.) 3.New infrastructures: 2015 OS. The GRI South will launch the binding phase of the 2015 OS Regulators to decide on economic test, tariff visibility and capacity products, (scheduled for February) TSOs to provide a list of infrastructures, investments cost and services’ availability dates, (Done in February) Regulators and TSOs to communicate Stakeholders on the procedure (scheduled for early March) Final documentation and procedure launch, (before summer) Stakeholders to sign contracts (before August) 4.GRI South will develop a regional investment plan according to requirements in Regulation 715/2009 (art. 12), (scheduled for December)

5 II. Action plan for 2010 INTEROPERABILITY 1.Study on CMPs at interconnection points: current status in each country, characterization, identification of problems taking into account CMP ERGEG Comitology Guidelines, future action plan to solve them at the borders (Regulation715/2009, art. 16), October (Possibility to have different timetable for the interconnection Fr-Sp, Pt-Sp) 2.Study on compatibility between LNG terminals and interconnected pipeline networks: regulation 715/2009, art. 17, to be developed once fulfilled the task above TRANSPARENCY 1.Update of Regulators’ 2007 Transparency Study: 1 st to check compliance (regulators) September with Regulation715/2009, 2 nd to invite comments by Stakeholders afterwards 2.TSOs to update building status records of OS infrastructures, June and December 3.TSOs to report on ENTSOG progress, quarterly REGULATORY HARMONIZATION 1.Regulatory proposals regarding common trading licence between Pt-Sp, Done January 2.Comparative study on cross border access tariffs between Pt and Sp, July 3.Regulatory proposal regarding cross border access tariffs between Pt-Sp, November, and Public Consultation on the proposal, January 2011

6 Western axis: Capacity increase at existing interconnections by 2013, reaching GRTgaz South. OS 2013 Eastern axis: Creation of a new interconnection point, reaching GRTgaz North. OS 2015 III. Preparation of the OS 2015 Introduction: development of new interconnection capacity between F-S Rhône MidCat North South Guyenne Larrau Euskadour 2013 capacities 2015 capacities

7 Results of the non-binding phase OS 2015: Two phases: Non-binding phase: launched in September 2009, at the same time that 2013 OS Binding phase: to be launched before summer 2010 III. Preparation of the OS 2015 Introduction: development of new interconnection capacity between F-S

8 III. Preparation of the OS 2015 Introduction:Work Programm afecting Open Season 2015 After last SG meeting, held on the 13 th of November 2009, Regulators and TSOs have continued working on the binding phase of OS 2015: 12 th IG meeting on 14 th of December th RCC meeting on the 29 th of January th IG meeting on the 17th of February 2010 CNE and CRE conference call on the 25 th of February 2010

9 To offer capacity at MIDCAT and Irún simultaneously To give more transparency to the economic test To launch the process before summer When deciding on the investments, to built both if there is sufficient requests according with the economic test, if not to build MIDCAT alone and if demand is not enough to built MIDCAT but sufficient to built Irun, then only Irun will be built. III. Preparation of the OS 2015 General agreements

10 III. Preparation of the OS 2015 III.1. Products Products to be offered: MIDCAT: Among the three possibilities discussed regarding Spain - France interconnection: Spain-TIGF connection, Spain-GRTgaz South connection Both Spain-TIGF and Spain-GRTgaz South TIGF –GRTgaz South GRTgaz South – GRTgaz North Same structure for Irún/Biriatou ALREADY DECIDED D+B F H C+A E G Spain- GRTgaz South GRTgaz North -Spain

11 III. Preparation of the OS 2015 Different capacities scenarios depending on the infrastructures to be built (depending on the capacity requested) To be reviewed by TSOs Total Capacity GWh/day MIDCAT + IRUN MIDCATIRUN GRTgaz N GRTgaz S 200 ?111* GRTgaz S TIGF *55* TIGF Spain III.2. Capacities (*) Capacity not allocated in 2013 OS

12 III. Preparation of the OS 2015 Capacity offered. To be reviewed by TSOs OFFER Capacity GWh/day MIDCAT + IRUN MIDCATIRUN GRTgaz N GRTgaz S 160 ?111 GRTgaz S TIGF TIGF Spain III.2. Capacities (*) Capacity not allocated in 2013 OS 80% Capacity

13 IV. AOB and next meetings  Next IG meeting in April  Next SG meeting to be scheduled