Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.

Slides:



Advertisements
Similar presentations
RTEMS and Linux at the Canadian Light Source Tony Wilson Canadian Light Source University of Saskatchewan.
Advertisements

Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL Challenges and Developments.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
SPEAR Upgrade – EPICS Status
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI,
Overview of PLS/PLS-II Control System Jin Won Lee Beam Operation Team Accelerator Division Pohang Light Source Korea
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
Mar. 12, 2008 Li, Chuan: NSRL Control System NSRL 1 NSRL Control System Presented by Li, Chuan National Synchrotron Radiation Laboratory.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
Single Board Computers and Industrial PC Hardware at the CLS
BPM DAQ for KEK Linac EPICS IOC using WindowsXP-based Oscilloscope for BPM DAQ System in KEK e-/e+ Linac Masanori Satoh (KEK Linac) June 13-16, 2011 EPICS.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing October 18, 2007.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Control System and Software Engineering Process Elder Matias
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
POSTECH PAL Development of S-band RF gun and advanced diagnostics in PAL 박용운 (Yong Woon Park, Ph.D.) 포항 가속기 연구소 (Pohang Accelerator Laboratory, PAL) 포항공과대학교.
1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View.
Introduction to EPICS (Ned Arnold, John Maclean).
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL.
Low Emittance RF Gun Developments for PAL-XFEL
Status of EPICS at KEK Tatsuro NAKAMURA KEK Jun
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Operations, Test facilities, CF&S Tom Himel SLAC.
Overview of PAL XFEL Project October 22, 2012 EPICS Collaboration Meeting In Soo Ko on behalf of PAL XFEL Team.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
Status of Activities Related to EPICS and Accelerator Control in China Presented by Guobao Shen KEKB Control Group EPICS Collaboration RICOTTI Tokai, 8.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing ICALEPCS2007 October 18, 2007.
The recent history and current state of the linac control system Tom Himel Dec 1,
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg June 18-20, SLAC Tune Tracker/Feedback Mike Laznovsky.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues Subsystem architecture, or… “How.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
From VME/RTEMS to Industrial PC/LinuxRT: A Migration Story Mitch D’Ewart May EPICS Collaboration Meeting May 2015.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
Heung-Sik Kang Pohang Accelerator Laboratory
1 0.1-nm Hard X-ray XFEL  Project Period: 2011 ~ 2015  Total Budget: 400 M$  10-GeV Electron Linac (Normal Conducting S-band, 60 Hz)  Total Length:
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
LCLS MD Downtime William Colocho June 2014 to June 2016.
Experience of Developing BEPCII Control System
LCLS Commissioning & Operations High Level Software
SNS Status Report Karen S. White 10/15/08.
                                                                       TANGO Collaboration Experience for running a multi-site international software project.
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
Commissioning the Fast Orbit Feedback System at SSRF
LCLS Commissioning & Operations High Level Software
Getting Started with EPICS A lecture Series
< kek.jp > Measurement and Data Acquisition for Accelerator Controls at KEK (Beam Position Monitor at Linac) Kazuro Furukawa < kazuro.
FEL-Beam-Dynamics Group
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
Presentation transcript:

Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration meeting 2004 Dec , 2004 RICOTTI, Tokai, JAPAN Pohang Accelerator Laboratory Kiman Ha, M.Y Oh, J.H Kim, J.M Kim, J.W. Lee, J.C. Yun, J.H Choi

Pohang Accelerator Laboratory POSTECH Outline EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN -Present status of PLS -New project PAL-XFEL -Summary

Pohang Accelerator Laboratory POSTECH Feedback status EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN -November, Orbit feedback operation started for user service. -Orbit stability with feedback  short term (1 hour) : < 1  m  long term (12 hours) : < 3  m -22 sets of V and H corrector PS are involved for orbit feedback This has been a big issue at PLS, with epics based control system. BPM, PS, ID’s are necessary elements of the feedback operation

Pohang Accelerator Laboratory POSTECH EPICS status EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN - Most control system upgraded to EPICS  Power Supply  BPM  RF  Modulator  ID control

Pohang Accelerator Laboratory POSTECH Hardware platforms EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN - VME  MVME5110 – 15, BPM, Corrector, RF Operation  MVME5500 for RTEMS test - PC Windows  Quad MPS, Beam current, ID - PC Linux  Kicker, Septum - Power MAC G4  Epics PV monitoring Web Server

Pohang Accelerator Laboratory POSTECH Used epics software toolkit EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN -Matlab CA: Global orbit feedback -Ca : Operator panel, correction utility -MEDM : Operator panel -EDM : Operator panel -Gateway -Web based PV monitoring >mySQL >PHP >GNU plot -Oracle based Web server

Pohang Accelerator Laboratory POSTECH More upgrade plan and testing EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN -LINUX IOC kernel upgrade 2.6 -RTEMS MVME5500 IOC tested >Environment ready >BSP(from kate Feng) and example IOC tested at MVME5500 >AsynDriver 4.0 tested E2050B with HP3458 GPIB

Pohang Accelerator Laboratory POSTECH PAL-XFEL layout EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN Storage Ring Linac FEL-3 fs-FIR FEL-1 FEL-2 FEL injector  PAL XFEL Project Period: Budget: 80 M$  SASE FEL Energy: GeV FEL-1: 10~50 nm FEL-2: 2 ~ 5 nm FEL-3: 0.1 ~ 0.3 nm

Pohang Accelerator Laboratory POSTECH Status for PAL-XFEL EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN -October, established task force team for XFEL design -Review of construction budget -Review of Beam line -Review of Linac Microwave -Review of Diagnostics -Review of Safety

Pohang Accelerator Laboratory POSTECH XFEL control system status EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN We are collecting FEL control system applications from LCLS, DESY,.. -Timing -Modulator -Power Supply -BPM -Diagnostic

Pohang Accelerator Laboratory POSTECH Summary EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN - PLS, successfully upgraded to epics based control system  Easily accessible by high level users  Very stable control and feedback -PAL-XFEL project will require highly enhanced hardware and software